Olympic Stadium conversion costs rise by another £51m

Grant Prior 8 years ago
Share

London Mayor Sadiq Khan has ordered an investigation into the cost of converting the Olympic Stadium into West Ham’s new home.

The move comes as it was revealed the conversion costs have jumped by another £51m to £323m from £272m.

Balfour Beatty was in charge of converting the stadium under a £190m contract.

The Enquirer first revealed two years ago that the costs were going to bust the original budget

Balfour was granted extra cash for construction work pushing the overall conversion cost to £272m.

But Sky News has now learned the price has risen again with the higher costs being partly blamed on extra outlay for retractable seats.

Deputy Mayor Jules Pipe told Sky News: “Last year the previous administration told the public that the costs had risen in total to around £270m. The new Mayor has now been told that cost will be over £320m.

“Understandably, Sadiq has ordered an investigation as to why those two figures are so wildly different.

“As the new administration at City Hall clearing up the mess of the previous administration, we need to make sure that the stadium runs on a sustainable basis and it is affordable to London.”

When Balfour was granted an extra £36m for the work in October 2014 the authorities said the increase “reflects the huge scale of the works undertaken to transform the former Olympic venue from a temporary athletics stadium into a year-round multi-use arena capable of delivering world class sporting and cultural events.”

The LLDC said: “The stadium work included the removal of the original roof and light paddles and installation of a new permanent roof, the largest of its kind in the world.

“The 45,000sqm cantilevered roof needed significant strengthening of the superstructure to support the 8km of cable net, 112 steel rafters, 9,900 roof panels and 14 light paddles each weighing 45 tonnes.

“The new roof covers every seat in the venue, improving the acoustics and spectator experience.

“An innovative retractable seating system required the removal of the lower seating bowl. The 21,000 movable seats bring the fans close to the pitch for football and rugby ensuring the Stadium has a long-term legacy.”

Latest news

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
3 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
3 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
3 days ago

Octavius cuts concrete formwork strike time by 5 days

Temperature probes reduce times for safely striking formwork
3 days ago

Plan for 200-home student-led London scheme

Developer Regal is behind new Camden Town scheme
3 days ago

Green light for new £45m tax office in Portsmouth

HMRC to occupy new office complex with construction starting next year
3 days ago

Extra tunnels included in £6bn East West Rail scheme

Government unveils plans for two new tunnels in Cambridgeshire
4 days ago

Infrastructure to get £80bn boost from public sector pensions

New "megafunds" will invest in UK construction projects
4 days ago

Bidders wanted for £800m building safety framework

Fusion21 launches renewal of deal across 12 lots
4 days ago

Winchmore wins £6.5m brickwork package on Stratford flats

Latest award from Graham on £69m development
4 days ago

Motts/Jacobs JV to design £2.5bn West Yorkshire Mass Transit

First construction could begin in 2028
4 days ago

Muse signs landmark deal to redevelop Solihull shopping centre

Mell Square scheme includes 1,600 homes at 6.4ha town centre site
5 days ago

Reds10 raids house builders for two director hires

David Newey and James Bateman join as regional ops directors
5 days ago

Builder killed as telehandler overturns

House builder goes into liquidation before court hearing and £160,000 fine
5 days ago

Balfour Beatty regional MD steps down

Lindsay McGibbon is understood to be exiting for a job in the United States
5 days ago

Firms put on alert for £1.5bn decarbonisation framework

Fusion21 aims to invite bids in January for housing and public buildings retrofit framework
5 days ago

Morgan Sindall aboard for £22m London station roof renewal

Passengers will continue to use Liverpool Street Station while roof works take place above
5 days ago

Utilities contractor turns to Africa for skilled workers

IES Utilities Group recruits its 100th overhead linesman from South Africa and Zimbabwe
5 days ago

McLaren boosts building safety and refurb team

Paul Woodhams promoted to newly created MD role at expanding division
5 days ago

Firms fight to renew places on £450m JV North deal

17 firms face fight to retain places on north west housing consortium list
6 days ago

Subbies get £7m lifeline on ISG Cardiff schools site

Council strikes deal with administrators and appoints emergency interim contractor
6 days ago

United Utilities names water and waste water design consultants

AtkinsRéalis, Jacobs, Stantec, Binnies, Mott MacDonald, RPS, and WSP make line-up
6 days ago

Crown Estate in £1.5bn Cambridge Business Park revamp plan

A phased programme of construction will start in 2026
6 days ago

McLaughlin & Harvey returns to profit

Contractor back in the black and looking forward to another positive year
6 days ago

Graham wins £69m London Stratford flats job

Stratford Mill project will deliver nearly 250 flats
6 days ago

Mace to complete construction of ISG neuroscience centre

Contractor to work with UCL to finish stalled job
6 days ago

BAM finally breaks ground at £60m-plus Yeovil College

Agreed contract price 50% above original estimate on delayed Somerset college job
6 days ago

Forterra trying to pass on NI cost increases

Brick and block giant writing to customers about 2025 price rises
7 days ago

Refurb contractor Troy Central goes into administration

Suffolk based hotel and leisure specialist had a £38m turnover
7 days ago

Former ISG director joins Wates as regional construction MD

Wayne Flannery joins Wates construction board after nearly 20 years at ISG
7 days ago

Contractor services