ISG wins £70m Imperial College biomedical hub

Aaron Morby 8 years ago
Share

Imperial College London has chosen ISG as preferred contractor to deliver a £70m project to construct its new Michael Uren Biomedical Engineering Research Hub. 

The Michael Uren Biomedical Engineering Research Hub

Michael Uren Biomedical Engineering Research Hub has been designed to achieve a BREEAM Very Good rating performance rating

The Hub is one of the flagship buildings at the College’s growing White City Campus in West London.

Work on the Hub is due to start on site in early 2017 and is scheduled for completion in 2019. 

The 14-storey arrow-shaped facility will feature a hybrid concrete and steel frame structure. 

A full-height steel frame nose cone, forming the apex of the arrow, will house the building’s complex mechanical and electrical services infrastructure. 

A glazed façade with prefabricated and geometrically distinct concrete fins to two elevations will provide solar shading.

Danny Blakeston, managing director of ISG’s engineering services business, said: “Securing our latest major project for Imperial at the White City Campus is a major achievement for the business.  It cements our reputation as a specialist in the delivery of highly-engineered spaces.

The scheme builds on ISG’s extensive experience delivering laboratories and research and development facilities. ISG has now undertaken more than 30 projects for Imperial College London, from flagship new-build and complex refurbishment schemes, to smaller scale fit outs and individual laboratory projects.

Research areas will include new technologies for the early detection, monitoring and treatment of cancers and regenerative medicine and technology to aid recovery from nervous system injuries. 

Latest project news

Galliford Try to upgrade Red Arrows base

Contractor seals quartet of RAF base upgrades
11 months ago

Galliford Try bags £87m Brent Cross build to rent job

Firm picks up another three blocks at Argent's North London £8bn regeneration scheme
12 months ago

Balfour starts £67m Edinburgh school campus

Passivhaus certified campus buildings will replace Liberton High School
1 year ago

Red wins Bristol retirement village £14m expansion

44 extra care flats to be built at former Frys chocolate factory
1 year ago

Caddick bags UK’s largest fertiliser plant job

Yorkshire contractor seals £28m contract for new plant in Yorkshire
1 year ago

Mace wins concrete bunkers for world’s most powerful laser

Firm will build two 7m tall bunkers with 2m thick radiation resistant concrete walls
1 year ago

Robertson to deliver £20m Alloa Wellbeing Hub and school

Design work will now start on Wellbeing Hub and Lochies primary school
1 year ago

Green light for Canada Water next phase of 380 homes

Zone G plan includes major resi tower, supermarket and park
1 year ago

Mace to start £230m Landsec London office job

Timber Square project will pioneer a hybrid cross laminate timber and steel superstructure
1 year ago

British Land multi-storey logistics hub approved

London urban last-mile logistics hub pipeline hits £1.3bn
1 year ago

£350m Birmingham triple tower scheme approved

Vast curving Ringway Centre to be demolished for 1,750 flats development
1 year ago

Midgard lands £245m Tottenham Hale towers

Three towers of up to 38 storeys complete north London regeneration scheme
1 year ago

Go-ahead for Wates £35m Hartlepool leisure centre job

Work on the Highlight waterfront centre to start in November
1 year ago

Green light for 690-home Birmingham Smithfield scheme

Prosperity Group plans to start work in Autumn next year on major Smithfield scheme
1 year ago

Go-ahead for 289 homes next to Saltaire World Heritage site

Ambitious plan to demolish a vacant Bradford office complex for new residential quarter
1 year ago

Plans in for 800-bed Leeds student and retail scheme

Major scheme will replace The Core shopping centre in the city
1 year ago

McAleer & Rushe awarded £60m Barking flats job

Work to start in November on near 200 rental homes project
1 year ago

ISG clinches £155m Cat D prison expansion

Firm to deliver 780 new places at three existing prison locations
1 year ago

27-storey Salford student tower approved

540-bed student block to be built on former site of McDonalds' regional HQ
1 year ago

Morgan Sindall £48m Dumfries school job approved

Building work to start before the end of 2023
1 year ago

Bouygues/Murphy JV tipped for £2.3bn Thames tunnel job

Frontrunner emerges for Lower Thames Crossing 4.2km tunnel job
1 year ago

Vinci/McAlpine JV to start £105m NHS rehabilitation centre

Treasury clears New Hospital Programme job to start main construction
1 year ago

Three giant lab buildings approved at £700m Oxford R&D district

Phase 2 Oxford North office and lab buildings to deliver 460,000 sq ft of space
1 year ago

RG Group to build tallest student block in the world

Contractor confirmed on 45-storey tower in Leeds
1 year ago

Vinci wins major St Helens town centre revamp

£90m first phase includes new market hall, 120-bed hotel and over 60 flats
1 year ago

Work to start this year on Manchester £250m spa resort

Developer Therme gets green light for re-engineered 28-acre Trafford complex
1 year ago

Barhale JV sign-off for £18m Dewsbury sewage works upgrade

Project forms part of Yorkshire Water’s £500m investment in Phosphorous removal
1 year ago

Murphy seals main build on £124m Essex station

Contractor lands main contract after successful start on enabling works package
1 year ago

GMI lands latest £42m phase of lab cluster

Citylabs life sciences complex in Manchester continues to grow
1 year ago

Green light for Canada Water commercial scheme

Twin-tower scheme will offer "a new type of office for London"
1 year ago

Contractor services