Industry awaits verdict as cladding fire tests completed

Aaron Morby 8 years ago
Share

The Government has pledged to set out clear advice on the use of high-rise cladding systems after completing seven large-scale fire tests on popular aluminium composite cladding systems.

ACM with a limited combustibility filler (A2) with mineral wool insulation passes BRE fire test
ACM with a limited combustibility filler (A2) with mineral wool insulation passes BRE fire test

Until this is published, building owners are being left in limbo despite four cladding systems failing the BRE testing regime needed to demonstrate compliance with Building Regulation fire performance.

So far 228 residential buildings over 18m have been identified to be fitted with cladding systems that fail performance tests.

But with the results all in, designers and contractors are warning that manufacturers’ descriptions of the performance of materials could still create confusion.

A cladding industry source said: “These results must be welcomed because they bring some clarity to what systems comply with Building Regulation requirements.

“But the use of the terminology used by manufacturers around combustibility of fillers used in aluminium cladding needs to be addressed to end market confusion.”

Cladding system tests Result 18m-plus buildings
ACM with unmodified polyethylene filler (PE) with PIR foam insulation Failed 82
ACM with unmodified polyethylene filler (PE) with mineral wool insulation Failed 111
ACM with a fire retardant polyethylene filler (FR) with PIR foam insulation Failed 13
ACM with fire retardant polyethylene filler (FR) and phenolic foam insulation Failed 22
ACM with fire retardant polyethylene filler (FR) with mineral insulation Passed 13
ACM with a limited combustibility filler (A2) with PIR foam insulation Passed 0
ACM with a limited combustibility filler (A2) with mineral wool insulation Passed 0

The final test involving the least combustible combination of components passed the latest fire test as expected.

This involved a wall cladding system consisting of ACM cladding with a limited combustibility filler (A2) in combination with stone (mineral) wool insulation.

Announcing the result, the Government advisory panel said that this combination of materials were compliant when installed and maintained properly.

A statement said: “While government has not been informed of any tall buildings over 18 metres in England using this particular combination of materials in their wall system, it could offer a possible solution for some buildings with other cladding systems which have been identified as a fire hazard through previous large-scale tests.

“The clear advice from the expert panel remains that building owners need to continue to take professional advice regarding remedial work that takes into account the specific circumstances of their building.”

It added: “The purpose of this testing programme is to develop a better understanding of how different types of cladding panels behave with different types of insulation in a fire.

“This is so building owners and their professional advisors can make informed decisions. Results of all seven large-scale tests are available and government will shortly publish consolidated advice to landlords based on all the seven tests.”

Latest news

Deck falls off huge scissor lift at Winvic site

Two men seriously injured as platform plunges to the ground
2 days ago

Bouygues seals deal for £119m Cardiff college campus

Construction to start in June on two new buildings
2 days ago

Bid race starts for £15bn schools framework refresh

DfE throws framework open to more contractors
2 days ago

Berkeley’s £600m Borough Triangle project approved

Controversial scheme features two towers of 38 and 44-storeys
3 days ago

London Mayor calls in blocked 600-bed student scheme

Refused 20-storey London PBSA block may still be built
2 days ago

HG to build 500-bed London Stratford student scheme

Work will start later this year subject to gateway 2 safety approval
3 days ago

Arrest after pedestrian death on construction site

Tragedy during site preparation works for new Wigan car park
2 days ago

British Steel threatens closure of Scunthorpe blast furnaces

Chinese owners say sectional steel and rail supplies will be maintained
3 days ago

Planning green light for Sheffield warehouse site

Existing factories to be demolished in new scheme for Rula Developments
2 days ago

New rail property company to unlock land for 40,000 homes

First four sites released in Newcastle, Cambridge, Manchester, and Nottingham
3 days ago

Drainage specialist Subscan files administration notice

Specialist employing 131 people files court notice
3 days ago

Four win Network Rail £300m engineering design deal

Eastern region deal will include design for Northern Powerhouse Rail
3 days ago

Funding go-ahead for Banwell bypass after fresh cost hike

Galliford Try contract rises £14m to £64m after final design change
3 days ago

Graham wins Southport £75m Marine Lakes Centre

Firm replaces Kier which parted ways with backer Sefton Council
3 days ago

Chancellor unveils extra £2bn capital spend a year

Construction promised a defence dividend in military base and homes upgrade work
4 days ago

McLaren confirms subcontractor team on £135m warehouse job

Work starts on TN2 Gateway site in Kent.
4 days ago

Vistry profits slump after site costs reporting debacle

House builder launches internal whistle-blowing service in business culture review
4 days ago

Severfield chief to step down

Alan Dunsmore to leave structural steel group by end of June
4 days ago

Funding hurdle remains as Lower Thames Crossing gains consent

Government claims £9bn project may start in 2026 as private finance options explored
5 days ago

Mace wins £600m Euston Tower overhaul

1970s tower's foundations and core to be retained as floor plates extended
5 days ago

Summer start for main works on London green tower

Axa sanctions start at 50 Fenchurch Street 36-storey office block
4 days ago

Japan’s leading flats builder JVs with L&G for UK push

Partners plan to build over 1,000 rental homes in London
4 days ago

Wates submits plan for 1,000 homes Harrow council scheme

Former civic centre Poets' Corner site kicks off housing partnership
4 days ago

Morgan Sindall upgrades forecast for next 12 months

Overbury fit-out arm gets off to a flying start in 2025
5 days ago

Restructure underway at Henry Boot Construction

New management team restructures business after drop in turnover
5 days ago

Government pledges £2bn stop-gap funding for 18,000 homes

Funding avoids cliff-edge in social housing delivery before new grant programme agreed
5 days ago

Just two major new roads schemes to start this year

National Highways sets out one-year interim spending plan after RIS3 delay
5 days ago

Plans go in for £400m GRAHAM Manchester site

Demolition and enabling works underway with main construction set to start next year
5 days ago

Building safety levy rate set at up to £10,000 a home in London

Levy introduction pushed back a year to Autumn 2026 - list of new rates
6 days ago

BAM wins £100m revamp of Broadgate Tower in London

Front of tower 3-storey extension to use cross laminate time and re-used steel
6 days ago

Contractor services