Balfour Beatty gets strike vote overturned

Grant Prior 13 years ago
Share

Balfour Beatty Engineering Services has forced a re-run of a vote by Unite electricians at the firm to take strike action.

Balfour challenged the way the vote was conducted after 441 of the firm’s 1,650 workers were balloted.

Unite members voted 360 to 81 for a strike but the result is now void.

The union is vowing to re-ballot members along with workers at NG Bailey and Crown House as the row over reform of the JIB pay and conditions deal rumbles on.

Unite national officer, Bernard McAulay said: “BBES is aware that over 80 per cent of Unite members who returned their ballot papers, voted in favour of strike action.

“But rather than listen and return to the negotiating table, BBES have chosen to hide behind draconian ballot laws and challenge the democratic voice of BBES employees by quoting concerns, as to whether they have been advised of the correct name of workplaces and concerns, as to whether a handful of staff employees received ballot papers.”

A Balfour statement said the firm was “pleased that Unite has re-considered its position on strike action arising from the recent ballot, following a number of very significant deficiencies in the ballot identified by BBES and drawn to Unite’s attention prior to the announced result.

“We are keen to talk to Unite about moving forward with the BESNA, and for Unite to recognise the importance of implementing a new more modern agreement better designed to suit the needs of the industry and our customers.”

Latest news

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
7 hours ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
7 hours ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
6 hours ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
6 hours ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
7 hours ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
7 hours ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
7 hours ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
3 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
4 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
3 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
3 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
4 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
3 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
4 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
4 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
4 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
5 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
4 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
5 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
5 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
5 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
5 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
5 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
6 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
6 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
6 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
6 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
6 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
6 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
6 days ago

Contractor services