Green light for £60m zero carbon homes development

Aaron Morby 10 years ago
Share

Cambridge City Council and house builder Hill have gained planning permission for a £60m zero carbon joint venture development in Cambridge.

The 208 dwellings represent the next phase of Great Kneighton in the Cambridge Southern Fringe and will be one of the largest zero carbon developments in the country.

Hill was selected as the preferred joint venture partner by Cambridge City Council after a competitive tender process two years ago.

Known as Virido, which means ‘to become green’ in Latin, the development will be split evenly between affordable homes, owned and managed by Cambridge City Council, and private properties sold through Hill.

The property sizes range from one bedroom apartments to four bedroom houses and each property will be built to Level 5 of the Code for Sustainable Homes.

Kevin Price, Executive Councillor for Housing, said: “The Council has always intended to demonstrate that we can lead quality new build housing projects that set standards in terms of energy efficiency and environmental sustainability.”

Rob Hall, Deputy Managing Director at Hill, said: “By pioneering new technological advances in residential development this site will become one of the largest and most sustainable sites in the country.”

Viridor design

Externally, the homes have been designed to provide a suitable thermal mass to even out extremes of temperature with mechanical ventilation heat recovery systems for night purging of warm air.

The building materials are sustainably sourced and will take into account their long-term maintenance and appearance.

Additional design features such as solar shading, deep window reveals, higher performance glass and interstitial blinds will ensure that living rooms do not exceed 28°C and bedrooms do not exceed 26°C for more than 1% of the occupied hours.

Internally there are water efficient appliances and fixtures, ‘technical rooms’ to accommodate all the necessary equipment, triple-glazed windows and extensive insulation.

The landscape design features extensive areas of green spaces, green roofs, ponds and trees.

There will also be a development-wide rainwater harvesting system for all dwellings.

Hill has recently finished the construction of a pair of concept houses. The concept homes will incorporate many of the sustainable features included in the larger site and Hill and Cambridge City Council will be trialling the zero carbon lifestyle with both end users.

The aim of this year long concept homes project is to undertake detailed research into which features actually work for a real family and which do not. A post-graduate student from Leeds Beckett University has been brought in to monitor their health and well-being, as well as assess how easy the technology is to use.

Latest news

Keltbray fine increased to £18m after failed bid rigging appeal

Contractor loses penalty discount for settling with competition authorities
12 hours ago

Luxury house builder goes under with 70 job losses

Octagon Developments in administration after 40 years in business
22 hours ago

Top Ten best read stories of 2024

The biggest headlines of an eventful year. Have a good one and here's to a successful 2025
1 day ago

BAM Nuttall fined £800,000 after concrete skip tragedy

Young labourer killed by falling bale arm
2 days ago

Keltbray infrastructure business reveals new name

AUREOS means "new dawn" after private equity acquisition
1 day ago

Stiffer fines for over-running street works from next Summer

Cash raised from lane rentals to be channeled into pothole repairs
1 day ago

£113m Basildon rental homes scheme seals build finance

Work expected to start early next year on Market Square project
1 day ago

Notting Hill Genesis seeks more tier 1 repairs contractors

London housing trust seeks eight firms for new £1.5bn repairs framework
1 day ago

Reclaimed steel oil rig columns worked into London office revamp

Curo will use reclaimed bricks and steel for Fitzrovia office overhaul
2 days ago

CITB delays levy approval consultation

Levy agreement talks pushed back by ongoing review into effectiveness of training body
2 days ago

Ofwat approves £104bn water industry spending plan

Household water bills to rise by 36% to fund quadrupling of investment
2 days ago

Costain/ Siemens JV clinches HS2 power supply job

£300m deal for HV power supply systems over the 225km route
2 days ago

Demolition team assembles on Multiplex London Wall site

Erith to start work next month at Deutsche Bank's former headquarters
3 days ago

Norwich Council acts to revive £300m Anglia Square scheme

Council uses Homes England funding to buy stalled site with planning for 1,100 homes
2 days ago

Go-ahead for 4,500-home Cambridgeshire new town

Waterbeach new town plan stalled three years ago after an Environment Agency objection
2 days ago

Henry Boot to take total control of Stonebridge Homes

Deal worth at least £30m
2 days ago

HS2 costs could hit £66bn

Government looking for next estimate to be lower
3 days ago

Mace to close construction logistics arm

Specialist business being wound down
3 days ago

National Grid to invest £35bn over next five years

Plan set out for record investment in electricity transmission infrastructure
3 days ago

Profits double at Barhale

Civils specialist sees order book top £1bn
3 days ago

Balfour wins 68km HV underground power cable deal

Main works to start next year on Eastern Green Link 2 job
3 days ago

Stunning site wrap unveiled on Sloane Street

Hoarding creates illusion of fully formed façade on £53m Galliford Try job
3 days ago

Heathrow Airport upgrade spend takes off again

Airport operator will spend £2.3bn over the next two years
3 days ago

Government buys back over 36,000 military homes

Public ownership deal to release wave of upgrade and new build work
4 days ago

Story Contracting staff braced for rail job losses

Work coming through slower than expected from Network Rail
4 days ago

Ballymore submits two plans for 3,700 East London homes

Construction could start in 2025 on Thames Road and Knights Road schemes
4 days ago

Blackpool council steps in on failed developer’s £300m scheme

Blackpool Central site clearance to start in the New Year as hunt starts for new developer
5 days ago

Brookfield submits retro-first London office plan

Milton Gate plan for Square Mile will hike space by nearly 50%
4 days ago

Bowmer + Kirkland gets start date for £100m Siemens site

Construction to begin early next year on Chippenham scheme
5 days ago

Torsion sells under-construction Leeds BTR scheme

Concrete frame due to start soon on 300-apartment complex
5 days ago

Contractor services