Go-ahead to build £252m Avonmouth waste plant

Aaron Morby 8 years ago
Share

Waste specialist Viridor has got the financial green light to spend £252m on a major energy from waste scheme in Avonmouth.

The flagship energy facility will boost the recovery options available to local authorities and business by transforming 320,000 tonnes of non-recyclable residual waste annually into renewable energy.

With procurement of engineering, design and construction partners in advanced stages, construction is due to start in early 2017.

Once operational in 2020, the facility will generate 33MW of energy, supplying the National Grid with enough electricity to power over 30,000 homes.

Phil Piddington, Managing Director of Viridor said: “The announcement of the go-ahead to invest £252m in a new energy from waste plant is great news for the UK waste sector and for energy resilience.  It is an integral part of our £1.5bn UK investment programme which adds to the 1.5% contribution energy from waste makes to UK power generation.

“Not only will the development boost the sustainability of waste management across Bristol and the West of England, but it is another significant infrastructure investment in the region.

“We look forward to announcing our supply chain partners in the coming months and to working with all our other stakeholders to deliver a world class project.”

Latest news

Four jailed after Keltbray corruption trial

Jail sentences following probe into jobs including Battersea Power Station
8 hours ago

Leeds United unveil stadium revamp design

Club has still to set a timeframe for staged Elland Road upgrade
6 hours ago

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
22 hours ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
21 hours ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
21 hours ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
21 hours ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
22 hours ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
22 hours ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
22 hours ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
4 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
5 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
4 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
4 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
5 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
4 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
5 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
5 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
5 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
6 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
5 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
6 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
6 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
6 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
6 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
6 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
7 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
7 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
7 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
7 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
7 days ago

Contractor services