Taylor Wimpey wants bidders for £30m Battersea block

Grant Prior 4 years ago
Share

A Taylor Wimpey joint venture is looking for contractors to bid for a £30m commercial and residential job in south London.

The York Road and Winstanley Regeneration LLP is a joint venture between the London Borough of Wandsworth and Taylor Wimpey redeveloping the Winstanley and York Road Estates in Battersea.

The overall scheme comprises a number of community buildings, retail and amenity spaces and 2,290 mixed-tenure residential units.

The JV is seeking interest from suitably experienced and competent building contractors to undertake the design and construction of the existing RIBA Stage 4 design to build completion (end of RIBA Stage 6) for the second phase of the scheme (Block 5).

Work will include provision of commercial space and circa 132 residential units across three residential blocks and associated external works.

The forecast construction cost for Block 5 is £30m and the contract will be a JCT Design & Build 2016 with Employer’s amendments.

The JV LLP said: “We invite expressions of interest from suitably qualified, competent and experienced contractors.

“All respondents to this notice will receive a pre-qualification questionnaire to be subsequently completed and returned in order to be considered for the competitive tender process, on completion of which the construction works package will be awarded.”

Expressions of interest must be made before November 9 with prequal questionnaires due to be issued on November 20.

Questionnaires will have to be returned by December 4 with invitations to tender issued on January 11 2021 ahead of an April 1 return date and winner announced on June 14.

The JV LLP added: “The building contractors should be aware that both mid and post tender interviews will take place within the periods above.”

To express an interest please email [email protected] putting ‘Block 5 Construction Works’ in the subject bar.

Expressions of interest must be submitted by email by 12:00 noon on Monday 09 November 2020.

As a minimum, expressions of interest must contain the full company name and postal address, along with a contact name, email address and telephone number.

Any expression of interest received after 12pm on Monday 09 November 2020 or which does not comply with the above requirements will not be considered for the contract.

Latest news

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
15 hours ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
1 day ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
15 hours ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
15 hours ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
1 day ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
14 hours ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
2 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
2 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
2 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
2 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
2 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
2 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
3 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
3 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
3 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
3 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
3 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
3 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
4 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
4 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
4 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
4 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
4 days ago

Contractor confirmed for business park expansion

Roe Developments to start on next phase of Castle Donington scheme
4 days ago

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 week ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
1 week ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
1 week ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 week ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
1 week ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
1 week ago

Contractor services