GMI starts £10m Leeds spec office scheme

Aaron Morby 4 years ago
Share

Regional contractor GMI Construction has started work on a central Leeds office scheme after securing the £10m building contract.

Fierra Real Estate and Opus North appointed the firm to undertake the renovation of the landmark Leeds City Centre office building at 12 King Street.

The project is being developed speculatively and supports growing signs of the commercial property market stirring back into life in UK cities.

Opus North said the building had been designed as a post-pandemic workplace with roof gardens and open terraces.

Once finished in Autumn 2021, the building will offer 54,500 sq ft of super prime office accommodation.

The building has been carefully designed by DLA Design to take into consideration the rapidly evolving office market and with tomorrow’s occupier in mind, boasting cutting-edge ‘smart’ building technology alongside market leading sustainability and well-being features credentials.

The transformation designed by DLA Design includes a  new façade and two new floors boasting a communal sky lounge with extensive roof terraces.

New seventh floor roof terrace

The professional team includes M&E consultant Hydrock MRB, structural engineer Curtins and Gardiner & Theobald as PM and cost conulstant.

Andrew Duncan, Managing Director of Opus North said: “We are creating the post Covid-19 contemporary workspace in the heart of Leeds, where technology, open spaces, roof gardens, fresh air, air-conditioning, combined with an exemplary approach to customer service, ensure we are the best-in-class office product in the city.

“We have challenged our design team of market-leading consultants to innovate and think outside to box to ensure we’re not just ploughing the same old furrow and doing what’s been done before.

“We have embraced the current climate, rolled with the changes and now we are close to launching the future of the post-pandemic workplace. Watch this space. “

Lee Powell, GMI Divisional Managing Director said: 12 King Street serves as one of the most-high profile and iconic developments within Leeds Central Business District and this landmark redevelopment project is drawing a lot of interest.

“Having undertaken the extensive refurbishment and redevelopment of the award-winning ‘33 Wellington Street’ in Leeds for Walker Morris’ new office, it feels befitting that we have now been entrusted to embark on breathing life into Walker Morris’ previous office in the heart of the city centre and we’re planning on this project being just as successful

“We are extremely happy and proud to be awarded this contract and entrusted by both Opus North and FRE UK to deliver the renaissance of this specular building.”

Latest project news

Galliford Try to upgrade Red Arrows base

Contractor seals quartet of RAF base upgrades
12 months ago

Galliford Try bags £87m Brent Cross build to rent job

Firm picks up another three blocks at Argent's North London £8bn regeneration scheme
1 year ago

Balfour starts £67m Edinburgh school campus

Passivhaus certified campus buildings will replace Liberton High School
1 year ago

Red wins Bristol retirement village £14m expansion

44 extra care flats to be built at former Frys chocolate factory
1 year ago

Caddick bags UK’s largest fertiliser plant job

Yorkshire contractor seals £28m contract for new plant in Yorkshire
1 year ago

Mace wins concrete bunkers for world’s most powerful laser

Firm will build two 7m tall bunkers with 2m thick radiation resistant concrete walls
1 year ago

Robertson to deliver £20m Alloa Wellbeing Hub and school

Design work will now start on Wellbeing Hub and Lochies primary school
1 year ago

Green light for Canada Water next phase of 380 homes

Zone G plan includes major resi tower, supermarket and park
1 year ago

Mace to start £230m Landsec London office job

Timber Square project will pioneer a hybrid cross laminate timber and steel superstructure
1 year ago

British Land multi-storey logistics hub approved

London urban last-mile logistics hub pipeline hits £1.3bn
1 year ago

£350m Birmingham triple tower scheme approved

Vast curving Ringway Centre to be demolished for 1,750 flats development
1 year ago

Midgard lands £245m Tottenham Hale towers

Three towers of up to 38 storeys complete north London regeneration scheme
1 year ago

Go-ahead for Wates £35m Hartlepool leisure centre job

Work on the Highlight waterfront centre to start in November
1 year ago

Green light for 690-home Birmingham Smithfield scheme

Prosperity Group plans to start work in Autumn next year on major Smithfield scheme
1 year ago

Go-ahead for 289 homes next to Saltaire World Heritage site

Ambitious plan to demolish a vacant Bradford office complex for new residential quarter
1 year ago

Plans in for 800-bed Leeds student and retail scheme

Major scheme will replace The Core shopping centre in the city
1 year ago

McAleer & Rushe awarded £60m Barking flats job

Work to start in November on near 200 rental homes project
1 year ago

ISG clinches £155m Cat D prison expansion

Firm to deliver 780 new places at three existing prison locations
1 year ago

27-storey Salford student tower approved

540-bed student block to be built on former site of McDonalds' regional HQ
1 year ago

Morgan Sindall £48m Dumfries school job approved

Building work to start before the end of 2023
1 year ago

Bouygues/Murphy JV tipped for £2.3bn Thames tunnel job

Frontrunner emerges for Lower Thames Crossing 4.2km tunnel job
1 year ago

Vinci/McAlpine JV to start £105m NHS rehabilitation centre

Treasury clears New Hospital Programme job to start main construction
1 year ago

Three giant lab buildings approved at £700m Oxford R&D district

Phase 2 Oxford North office and lab buildings to deliver 460,000 sq ft of space
1 year ago

RG Group to build tallest student block in the world

Contractor confirmed on 45-storey tower in Leeds
1 year ago

Vinci wins major St Helens town centre revamp

£90m first phase includes new market hall, 120-bed hotel and over 60 flats
1 year ago

Work to start this year on Manchester £250m spa resort

Developer Therme gets green light for re-engineered 28-acre Trafford complex
1 year ago

Barhale JV sign-off for £18m Dewsbury sewage works upgrade

Project forms part of Yorkshire Water’s £500m investment in Phosphorous removal
1 year ago

Murphy seals main build on £124m Essex station

Contractor lands main contract after successful start on enabling works package
1 year ago

GMI lands latest £42m phase of lab cluster

Citylabs life sciences complex in Manchester continues to grow
1 year ago

Green light for Canada Water commercial scheme

Twin-tower scheme will offer "a new type of office for London"
1 year ago

Contractor services