Big Carl’s biggest lift ends 2020 at Hinkley Point C

Aaron Morby 4 years ago
Share

Super-crane Big Carl has just completed its biggest ever lift at Hinkley Point C.

The 17m tall ring with a diameter of 47m – was lifted out of a bunker where it was constructed in factory conditions.
The 17m tall ring with a diameter of 47m – was lifted out of a bunker where it was constructed in factory conditions.

The world’s largest crane lifted a total weight of 575 tonnes to install the first of three massive prefabricated steel rings which form the reinforced cylinder around the nuclear reactor.

Big Carl reached out 160m to put it in place during a night lift  – timed to take advantage of lighter winds during a four-day operation.

Despite the challenge of operating under Coronavirus restrictions, the final big lift of the year was one of many significant milestones achieved in 2020.

These include the completion of the first 3.5km cooling water tunnels and the reactor base of unit two. The power station will help Britain reach Net Zero by producing reliable low carbon electricity for more than 6m homes.

Lift facts

  • The first steel containment ring weighs 382 tonnes – around the weight of a 747 Jumbo jet – lifting gear took the total lift weight to 575 tonnes.
  • The liner ring is the second of five pieces that make up the steel containment for each reactor, including the base and the dome.
  • Big Carl is 250m tall, moves on rail tracks and will eventually lift pieces weighing more than 1,000 tonnes
  • The ring was gently placed on 96 hydraulic jacks which lowered the ring into its exact position

Hinkley Point C Managing Director Stuart Crooks said: “This spectacular lift is a remarkable achievement in a year when everyone has had to make extraordinary efforts to keep the site and community safe from infection.

“The precision involved is like watch-making on an industrial scale.

“Our ability to maintain progress in such tough circumstances is a testament to the commitment of the workforce and our suppliers across Britain and the world.

“Construction of Hinkley Point C’s two reactors continues to provide evidence that repeating an identical design improves quality and efficiency – something that will bring big benefits to Sizewell C in Suffolk.”

The liner ring is the second of five pieces that make up the steel containment for each reactor, including the base and the dome.

Latest news

Keltbray fine increased to £18m after failed bid rigging appeal

Contractor loses penalty discount for settling with competition authorities
1 day ago

Luxury house builder goes under with 70 job losses

Octagon Developments in administration after 40 years in business
2 days ago

Top Ten best read stories of 2024

The biggest headlines of an eventful year. Have a good one and here's to a successful 2025
2 days ago

BAM Nuttall fined £800,000 after concrete skip tragedy

Young labourer killed by falling bale arm
3 days ago

Keltbray infrastructure business reveals new name

AUREOS means "new dawn" after private equity acquisition
2 days ago

Stiffer fines for over-running street works from next Summer

Cash raised from lane rentals to be channeled into pothole repairs
2 days ago

£113m Basildon rental homes scheme seals build finance

Work expected to start early next year on Market Square project
2 days ago

Notting Hill Genesis seeks more tier 1 repairs contractors

London housing trust seeks eight firms for new £1.5bn repairs framework
2 days ago

Reclaimed steel oil rig columns worked into London office revamp

Curo will use reclaimed bricks and steel for Fitzrovia office overhaul
3 days ago

CITB delays levy approval consultation

Levy agreement talks pushed back by ongoing review into effectiveness of training body
3 days ago

Ofwat approves £104bn water industry spending plan

Household water bills to rise by 36% to fund quadrupling of investment
3 days ago

Costain/ Siemens JV clinches HS2 power supply job

£300m deal for HV power supply systems over the 225km route
3 days ago

Demolition team assembles on Multiplex London Wall site

Erith to start work next month at Deutsche Bank's former headquarters
4 days ago

Norwich Council acts to revive £300m Anglia Square scheme

Council uses Homes England funding to buy stalled site with planning for 1,100 homes
3 days ago

Go-ahead for 4,500-home Cambridgeshire new town

Waterbeach new town plan stalled three years ago after an Environment Agency objection
3 days ago

Henry Boot to take total control of Stonebridge Homes

Deal worth at least £30m
3 days ago

HS2 costs could hit £66bn

Government looking for next estimate to be lower
4 days ago

Mace to close construction logistics arm

Specialist business being wound down
4 days ago

National Grid to invest £35bn over next five years

Plan set out for record investment in electricity transmission infrastructure
4 days ago

Profits double at Barhale

Civils specialist sees order book top £1bn
4 days ago

Balfour wins 68km HV underground power cable deal

Main works to start next year on Eastern Green Link 2 job
4 days ago

Stunning site wrap unveiled on Sloane Street

Hoarding creates illusion of fully formed façade on £53m Galliford Try job
4 days ago

Heathrow Airport upgrade spend takes off again

Airport operator will spend £2.3bn over the next two years
4 days ago

Government buys back over 36,000 military homes

Public ownership deal to release wave of upgrade and new build work
5 days ago

Story Contracting staff braced for rail job losses

Work coming through slower than expected from Network Rail
5 days ago

Ballymore submits two plans for 3,700 East London homes

Construction could start in 2025 on Thames Road and Knights Road schemes
5 days ago

Blackpool council steps in on failed developer’s £300m scheme

Blackpool Central site clearance to start in the New Year as hunt starts for new developer
6 days ago

Brookfield submits retro-first London office plan

Milton Gate plan for Square Mile will hike space by nearly 50%
5 days ago

Bowmer + Kirkland gets start date for £100m Siemens site

Construction to begin early next year on Chippenham scheme
6 days ago

Torsion sells under-construction Leeds BTR scheme

Concrete frame due to start soon on 300-apartment complex
6 days ago

Contractor services