Plan for major Leeds high-rise student and events scheme

Aaron Morby 4 years ago
Share

Developer Downing will submit ambitious plans in the autumn for a major student accommodation and events scheme in Leeds city centre, adjacent to the Leeds First Direct Arena.

New buildings will be clustered around the Leeds Arena building
New buildings will be clustered around the Leeds Arena building

It will seek detailed planning consent for purpose-built student accommodation across two separate but adjacent plots, and outline planning to develop a multi-purpose events space, which would be taken forward at a future date by Leeds City Council.

A 38-storey purpose-built student tower is planned for Merrion Way featuring 728 student bedrooms in a mix of six-bedroom and 296 studios.

High-rise building proposed for site fronting Clay Pit Lane, Merrion Way and Brunswick Terrace, with nearby events centre plan still at outline stage

Meanwhile, the existing Yorkshire Bank office building would be demolished to make way for the second phase, comprising a stepped building rising to 18 storeys, featuring 543 student bedrooms in a mix of five and six-bedroom clusters and 216 studios.

Second student accommodation building proposal for site located between Clay Pit Lane and Elmwood Close

If approved, the plans will pave the way for 1,200 flats and the creation of a 110,000 sq ft facility including an 800-900 capacity auditorium at the centre of the Leeds Arena Quarter, designed to attract additional corporate, cultural and live events.

The sustainable development will incorporate photovoltaic panels and air source heat pumps.

Each element of the plan promises to regenerate unused space in part of the city that will benefit economically from additional footfall. The proposals also have the potential to create approximately 390 jobs in the construction phase.

George Tyson, projects director at Downing, said: “It has long been recognised that Leeds is in need of an additional, flexible events space capable of hosting corporate banqueting, awards ceremonies and live entertainment. With 2,000 square metre flat floor space, this scheme has the potential to host conferences and exhibitions which can’t be facilitated at the Arena or other venues in the city centre, allowing Leeds to secure business that may otherwise be lost to other cities and regions.”

He added: “Attracting and retaining graduate talent is vital to the health of the regional economy and this relies on being able to offer attractive student accommodation. Our proposals will provide students with brand new, first-class living space in a dynamic part of the city, with fast access to university buildings and facilities.”

 

 

 

Latest news

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
2 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
3 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
2 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
2 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
3 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
2 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
3 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
3 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
3 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
4 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
3 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
4 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
4 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
4 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
4 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
4 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
5 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
5 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
5 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
5 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
5 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
5 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
5 days ago

Contractor confirmed for business park expansion

Roe Developments to start on next phase of Castle Donington scheme
5 days ago

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 week ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
2 weeks ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
1 week ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 week ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
2 weeks ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
1 week ago

Contractor services