Bill for £22bn HS2 extension to Manchester goes to Parliament

Aaron Morby 3 years ago
Share

The Bill extending HS2 to Manchester is handed to Parliament today in a landmark move that paves the way for construction supporting 17,500 jobs.

At the same time, the Government produced a more detailed costing for the 52-mile route from Crewe to Manchester putting the spending envelope at £15bn-£22bn.

The Bill allows for new high speed stations and junctions to be built at Manchester Piccadilly and Manchester Airport future proofing services along the Western Leg.

Thousands more construction jobs are expected to be created as plans for new homes and commercial development around the new Piccadilly and Airport Stations spring into life.

It also facilitates Northern Powerhouse Rail to be built at a later date – which could include lines from Manchester to Liverpool and Leeds.

A new junction near Crewe will both improve future services on the route while giving Crewe the potential to be a Hub station in mid-Cheshire able to accommodate more trains.

Mark Thurston, CEO at HS2 said: “Construction of the first phase of HS2 is already supporting over 20,000 jobs and spearheading investment and growth in major population centres along the route. This Bill is a vote of confidence in HS2’s ability to help towns and cities in the North realise their economic potential.”

Today’s announcement was coupled with confirmation of the HS2’s Minister’s decision to include plans for a rolling stock depot north of Crewe and a smaller depot and train stabling facilities in Dumfries and Galloway in the scheme proposals.

The High Speed Rail (Crewe to Manchester) Bill forms part of the £96bn Integrated Rail Plan and the first of three new high speed lines pledged by Government at th end of last year when the Eastern leg of HS2 to Leeds was scrapped.

£96bn Integrated Rail Plan


  • HS2 from Crewe to Manchester
  • HS2 from the West Midlands to East Midlands Parkway, enabling HS2 trains to join existing lines to serve Nottingham and Derby city centres
  • A new high-speed line between Warrington, Manchester and Yorkshire, as part of Northern Powerhouse Rail
  • Electrify and/or upgrade 3 existing main lines including:

– the Transpennine Main Line between Manchester, Leeds and York

– the Midland Main Line between London St Pancras, the East Midlands, and Sheffield

– upgrading and improving line speeds on the East Coast Main Line

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
1 hour ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
2 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
2 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
1 hour ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
2 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
2 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
1 hour ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
19 hours ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
7 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services