Works are underway with tree surveys and bore holes taking place before, demolition of the old buildings due in mid-April, and ground works scheduled to begin this summer.
The leisure centre will house a 25m swimming pool, training pool, splash-zone, gym and health suite, soft play, climbing wall, youth zone, a café and terrace, and even a rooftop 3G turf football pitch.
Yiewslet & West Drayton leisure centre has been designed by architect Hunters, with Buro Happold providing structural engineering and QODA Consulting mechanical and electrical services design.