Value-engineered HS2 Euston station design revealed

Aaron Morby 3 years ago
Share

HS2 has revealed fresh concept designs for the Euston terminus based on a less complex, more efficient, 10-platform station that can now be built in a single stage.

Arched station roof swapped for easier to build geometric design
Arched station roof swapped for easier to build geometric design

Mace Dragados JV, HS2’s station construction partner, has worked with the design consortium of Arup, WSP and Grimshaw Architects to refine and value engineer the design to reduce costs.

Original concept HS2 Euston station design.

The original arched station roof has been swapped for an easier-to-build geometric roof design that allows natural light to flood into the 300m long station concourse below.

Elements of the new roof design can be prefabricated off-site, and installed using modular construction techniques, reducing costs, carbon emissions and local disruption.

The HS2 station will be set across three levels, with 10 subsurface platforms that are 450m long.

The 300m long ground-level concourse will open out onto new public spaces at the north and south entrances.

The station hall – 20% larger than Trafalgar Square – will become the largest station concourse in the UK.

Retail and station facilities will be available on the ground and first floor, underneath the top-lit station roof.

Construction of the HS2 station will also support 3,000 jobs at peak and will offer hundreds of contract opportunities through the supply chain.

MDJV recently began a multi-year procurement of packages worth £500m for work on the HS2 station and the London Underground at Euston and Euston Square which will provide improved connections for passengers.

Taking account of the recommendations of the independent Oakervee review, the design integrates the HS2 station with the existing Network Rail station and emerging plans for over site development, led by Lendlease.

Lendlease, the Government’s appointed Master Development Partner at Euston, has started an 18-month long public consultation to seek the views of the local community about what would be of value to them in the development.

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
1 hour ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
2 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
2 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
1 hour ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
2 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
2 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
1 hour ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
19 hours ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
7 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services