Robertson gets green light for £150m Cardiff arena

Aaron Morby 3 years ago
Share

A Robertson-led consortium has gained full planning for a 17,000-capacity arena, hotel and associated parking at Atlantic Wharf in Cardiff.

17,000 sesat arena will form first phase of wider Atlantic Wharf regeneration scheme
17,000 sesat arena will form first phase of wider Atlantic Wharf regeneration scheme

The consortium, which is the city council’s chosen delivery partner, will now start work in the autumn on phase one of the wider Butetown regeneration scheme.

Outline plans for the broader masterplan were also approved allowing detailed applications to be submitted for up to 890 homes; 1090 hotel bed spaces; 19,500 sq m of offices; 27,500 sq m of leisure floorspace and 12,310 sq m of retail.

Cardiff cabinet member for Investment and Development, Russell Goodway, said: “The new indoor arena will be a top UK visitor attraction and act as a catalyst for further investment in Cardiff Bay.

“The financial benefits that it will bring to Butetown and the wider area will be significant with up to 2,000 jobs needed during the construction phase and a further 1,000 jobs created once the Atlantic Wharf masterplan is delivered.

“The Atlantic Wharf masterplan will see significant improvements made to the public realm and to public transport links to the Bay. The importance of the new arena cannot be understated, it will kick-start the next phase of regeneration in Cardiff Bay.”

With Robertson Group as developers and Live Nation and Oak View Group as joint operators, the arena will offer Cardiff the opportunity to host some of the biggest names in the entertainment industry whilst attracting millions of visitors to the city and generating wider local economic activity for hotels, restaurants, and bars.

Atlantic Wharf plan


Phase 1: Construction starts on the arena and hotel in spring 2022, with completion in time for doors opening in 2025. This phase also includes building a multi-storey car park to replace the lost surface parking.

Phase 2: Businesses in the Red Dragon Centre will be relocated so works can start on a purpose-built facility to accommodate leisure, food and drink amenities. Plans include a new cultural centre incorporating the Wales Millennium Centre production space, potentially a National Art Gallery, and a ‘This is Wales’ fly-through visitor attraction.

Phase 3: A new 150,000 m2 office space delivered along with a 150-bed, four-star hotel.

Phase 4: A new neighbourhood delivering new homes and potential for retail and office space – this phase is dependent on relocation of the County Hall to a new, purpose-built building.

Latest news

Network Rail fined £3.75m after double track worker death

Michael Lewis and Gareth Delbridge were killed while working on rail line in Wales
6 hours ago

Local contractor Castle lands £60m South Shields campus

Work to start this summer on new home for South Tyneside College and South Shields Marine School
11 hours ago

GRAHAM wins £100m deal after safety regulator approval

Dyecoats scheme in Leeds becomes one of first to receive Building Safety Act Gateway 2 green light
1 day ago

London Super Sewer now fully connected

10-year construction programme draws to a close
19 hours ago

McLaren signs off £125m London Bank over-station job

Developer Helical secures funding deal for 8-storey office job
18 hours ago

Work on Labour’s new towns to start by 2029

More than 100 sites put forward for a dozen new town locations
1 day ago

Unite hails 12 years without a site accident at Battersea

More than 4,000 union members have worked on the redevelopment without a single serious accident
18 hours ago

Housing orders surge offers hope after 5.2% new work fall last year

Housing orders surged 24% in final quarter of 2024 as developers release schemes
2 days ago

McLaren Property gets new Construction Director

Jon Mangham joins from Equans
1 day ago

BAM Construction suffers £40m loss after Co-op Live setback

Civils business profit surges 24% to £80m
2 days ago

Over 150 jobs axed as J S Wright goes under

Insolvency specialist FRP Advisory goes in at Birmingham M&E specialist
2 days ago

Extra cash found to speed-up safety regulator

Government to spend extra £2m to clear backlog of high rise approvals
2 days ago

Galliford Try lands £63m RAF accommodation deal

Work to start within months at RAF Digby in Lincolnshire
2 days ago

Balfour Beatty wins Trent arched bridge job

Briton Fabricators will build the £13m bridge from prefabricated sections
2 days ago

Goldbeck to build new £50m Cardiff County Hall

German-owned contractor vowing to be a "disrupter in the UK market"
2 days ago

Laing O’Rourke chairman to step down

Ray O'Rourke to take over chair from Sir John Parker
3 days ago

Farrans lands Leeds Bradford Airport phase 2 upgrade

Contractor takes follow-on refurb job after terminal extension
2 days ago

ISG built Bristol housing block to be torn down

Contractor's collapse sinks Bristol flats remediation claim
3 days ago

RSK revenue nears £2bn as losses soar to £132m

Refinancing last summer puts group on course for more growth this year
3 days ago

Bridge design wind error adds £20m to construction costs

Completion of £148m Grantham Southern Relief Road delayed by a year
3 days ago

Rayner pledges extra £350m for social house building

More than 3,000 homes could be built with cash injection
3 days ago

City’s biggest retrofit tower scheme approved

Triple-fronted 70 Gracechurch Street building will rise to 33 storeys
3 days ago

Defibrillator saves worker’s life on Wates site

Machine operator saved after "dying" for 16 minutes on prison job
4 days ago

Funding deal for £125m Camden Roundhouse scheme

Developer Regal set to start 264-bed student scheme
4 days ago

Balfour leadership rejig to focus on three key growth sectors

Divisional CEO trio take lead roles for energy, defence and transport expansion
4 days ago

ABP bidders day for £150m Humber ports pipeline

Nine projects in the pipeline to support automotive and energy transition schemes
4 days ago

Hinkley Point C to create 3,000 jobs as work ramps up

Fitout surge to swell workforce to 15,000 in next 18 months
4 days ago

Hercules sells suction excavator division for £2.4m

Loss making arm sold by labour hire specialist
4 days ago

Foundations complete at HS2 Old Oak Common station

Station base completed using 76,000 cubic metres of concrete and 17,000 tonnes of reinforced steel
4 days ago

Bids invited for £175m consultancy framework

Fusion21 inviting consultants to join latest four-year deal
4 days ago

Contractor services