Plans lodged for vast British Library extension

Aaron Morby 3 years ago
Share

Joint venture developers Stanhope and Mitsui Fudosan UK have submitted plans for an 800,000 sq ft extension to the British Library site near St Pancras in London.

The extension comprises of two 12 storey blocks, both running from east-to-west
The extension comprises of two 12 storey blocks, both running from east-to-west

Architects Rogers Stirk Harbour + Partners have drawn up the scheme for the site at the rear of the existing building. Engineer Arup has also been appointed to the project.

The project will include around 100,000 sq ft of new space for the British Library itself, and the station works infrastructure for Crossrail 2 beneath the site should it proceed.

The first three floors of the proposed extension will consist predominantly of the new British Library space, as well as retail and the entrances to the commercial space.

This would be funded by a further 600,000 sq ft of space available for commercial let targeting the bioscience and knowledge quarter tenants.

Project timeline


Proposed British Library extension is located to the north of the existing Library building

  • Autumn 2022: Planning committee held
  • 2023–2025: We prepare the site for construction
  • 2025–2029: Building begins and spaces are fitted out
  • 2029: Our new spaces open to everyone

Cutaway of the proposed site showing the spaces dedicated to office and lab-enabled in relation to the existing British Library space

The proposed extension will open up public access to the library with new routes between Euston Road to the south and a new entrance beside Dangoor Walk to the north.

The foyer space will run through the middle of the two blocks and will be 8 storeys high, with bridges linking the two blocks together.

 

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
29 mins ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
35 mins ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
35 mins ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
22 mins ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
1 hour ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
1 hour ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
7 mins ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
18 hours ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
7 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services