HS2’s giant bridge building machine swings into action – video

Aaron Morby 3 years ago
Share

Construction has started on the Colne Valley Viaduct as a 160m-long enormous bridge-building machine launched the first deck segment on the HS2 site.

A 7,000t launching girder will install 1,000 individual segments across the 3.4km long viaduct route across a series of lakes and waterways between Hillingdon and the M25.

Originally built in 2004, the launching girder was first used during the construction of the Hong Kong East Tsing Yi Viaduct.

Specially designed to handle complex viaduct construction, the machine is named ‘Dominique’ in memory of Bouygues engineer Dominique Droniou who played a leading role in its design and development.

It will carry and place each unique viaduct segment weighing up to 140 tonnes. Once each section is complete, the machine will inch itself forward into position to build the next stage.

Some 56 piers each weighing around 370 tonnes are being constructed along the Colne Valley route ahead of the girder, with the girder crawling from one pier to the next, installing the deck segments as it goes.

One segment is put in place each side of the central pier, using a cantilever approach to balance the structure, as two half-arches either side of each pier are constructed simultaneously. Steel tensioning cables will be threaded through the segments to strengthen the bridge.

To allow for the gentle curves of the viaduct as it crosses the valley, all the segments are slightly different shapes and made on site at a purpose-built temporary factory close to the north abutment.

The huge viaduct project is being led by HS2’s main works contractor Align JV – a team made up of Bouygues Travaux Publics, Sir Robert McAlpine and VolkerFitzpatrick.

Align Project Director, Daniel Altier said: “The start of the erection of the deck segments marks the latest important milestone for Align, relating to the construction of the Colne Valley Viaduct.

“There has been a lot of hard work involved to get us to this point, and the achievements so far are a great example of what collaboration and excellent teamwork can deliver. I would specifically like to acknowledge the contribution from our supply chain partners – VSL, Kilnbridge, KVJV, VolkerStevin, Tarmac, Sendin and Vaughan Plant Haulage.”

Colne Valley bridge launching girder is 160m long

The design of the Colne Valley Viaduct was inspired by the flight of a stone skipping across the water, with a series of elegant spans, some up to 80m long, carrying the railway around 10m above the surface of the lakes, River Colne and Grand Union Canal.

In another visible sign of progress on the project, the team have also completed the construction of three of four jetties across the lakes to get equipment into position to support the construction and help take construction vehicles off local roads.

Latest news

Cannabis farm gang posed as utilities contractor

Gang jailed for 28 years after diverting power to more than 100 cannabis farms
1 day ago

Former Liverpool mayor charged in building contracts probe

Construction bosses also charged as part of Operation Aloft
2 days ago

Bidding to start for £700m Irish sea interconnector work

Work includes converter stations at Hunterston and Kilroot near Belfast
2 days ago

Muse to redevelop Durham County Hall HQ site

Morgan Sindall regen specialist seals another major development deal
2 days ago

Mace to transform Imperial College Great Hall

Work to start next month on ambitious refit
2 days ago

£100m plan to regenerate former Digbeth ironworks

Hartwell unveils 260,000 sq ft office and 240 homs plan
2 days ago

Legendre UK wins £21m London homes job for Clarion

Tower Hamlets building to be replaced due to building and fire safety issues
2 days ago

Construction buyers report fastest downturn since 2020

Double whammy of decreasing new orders and delayed projects
3 days ago

Bidders day for £15bn schools alliance framework

Online event to set out details of DfE alliancing framework procurement plan
3 days ago

MPs told safety regulator delays forcing industry job cuts

Industry chief warns housing select committee that BSR is now a main block on meeting housing targets
3 days ago

£600m delivery partner named for new hospital programme

Mace/T&T JV named programme delivery partner for £37bn new hospital plan
3 days ago

£230m Southampton waterfront scheme approved

Town Quay includes trio of 25 storey towers around new marina
3 days ago

Planning green light for £10bn Northumberland data centre

Blackstone-backed project will create 1,200 construction jobs
3 days ago

Bauhaus block above Southwark Station gets green light

Student accommodation and affordable housing scheme replaces original office plan
3 days ago

Police arrest plant hire fraud gang

Nine arrests after kit hired "with no intent of ever returning the machines"
4 days ago

Balfour Beatty boss Leo Quinn to step down

Group Chief Executive to be replaced by consultant AtkinsRéalis chief Philip Hoare
4 days ago

Galliford Try upgrades target as half-year profits jump 54%

Firm closes in on deal to take on ISG custodial work
4 days ago

Trespasser dies in crane fall at Willmott Dixon site

Tragedy after man breaks into £60m Manchester science park site
4 days ago

Ibstock pulls out of GRC cladding market

Materials giant blames subcontractor failures and low margins
4 days ago

Green light for 1,000-home Wolverhampton city centre regen

Phase one of ECF Smithgate scheme to start this year
4 days ago

Oval revises Manchester scheme with trio of towers

Flats doubled to 800 at reworked Albert Bridge House project
4 days ago

More repair work needed at McAlpine problem panel hotel

Contractor looking for long-term solution to loose panels
4 days ago

Redesign delays hit giant McAlpine car battery factory

Size of first building reduced and steelwork start pushed back
5 days ago

‘Affordable’ HS2 Crewe to Euston plan submitted to Treasury

Industry presses for scaled back Euston terminus and connection to Crewe
5 days ago

Regal submits plan to revive stalled London resi tower

Swiss Cottage project redesigned with second staircase and 237 flats
5 days ago

Construction boss jailed for siphoning off cash for casino

Money removed from contracting firms before they went under
5 days ago

Muse signs up to £3.2bn Solihull health campus district

Ambitious Arden Cross scheme next to HS2 Interchange advances
5 days ago

Drees & Sommer acquires RSP Consulting Engineers

Expanding consultant sees UK workforce grow to 300
5 days ago

Watkin Jones wins over £50m student digs campus upgrade

Work to start next month on phase 714-bed south London campus
6 days ago

Severfield warns on profits blaming major project delays

Steelwork firm cancels share buyback and steps up cost cutting programme
6 days ago

Contractor services