Plans in for 289 homes next to Saltaire World Heritage Site

Aaron Morby 2 years ago
Share

Major plans have gone in for a 290-home scheme next to the Salts Mill World Heritage Site in Saltaire on the outskirts of Bradford.

The mixed housing scheme will include extensive underground parking allowing for pedestrian walkways through the residential quarter
The mixed housing scheme will include extensive underground parking allowing for pedestrian walkways through the residential quarter

Leeds-based developer Artisan Real Estate aims to build the Saltaire Village on an 11-acre site, sandwiched between the River Aire and the Leeds & Liverpool Canal, which was formerly home to an HMRC office complex which closed in October 2021.

As well as homes it will also build more than 5,000 sq. ft. of small commercial office space designed for flexible working and a café facing on to a new ‘pocket’ park and piazza.

Yorkshire-based architects Axis Architecture has drawn up the riverside scheme

A sizeable riverside park will link the development to the River Aire, providing woodland, grasslands and lawns to act as a natural flood water storage area.

The proposal will first require demolition of the existing five-storey HMRC building which consists of two large hexagonal office blocks.

Fomrer HMRC building complex to be demolished

Dependent on planning this could start by autumn next year.

James Bulmer, development director for Artisan North, said: “Our proposals for Saltire Riverside herald another significant addition to Artisan’s enviable list of transformational regeneration projects in highly desirable regional locations across the UK.

“Progressing such a large development on the very edge of a UNESCO World Heritage site brings its own set of challenges and responsibilities, and we have taken time to understand and reflect the unique historical contexts of the Salts Mill location.

He added: “We want this to be a modern interpretation of neighbouring Saltaire, bringing much needed sustainable family housing in an accessible, well connected and environmentally responsible setting – with the added advantage of low energy costs and exemplarily green credentials.

“This is a hugely exciting development that will spectacularly open up a large riverside area that has effectively been closed to the public since the 1970s when the HMRC complex was built.”

 

 

Latest news

Keltbray fine increased to £18m after failed bid rigging appeal

Contractor loses penalty discount for settling with competition authorities
12 hours ago

Luxury house builder goes under with 70 job losses

Octagon Developments in administration after 40 years in business
22 hours ago

Top Ten best read stories of 2024

The biggest headlines of an eventful year. Have a good one and here's to a successful 2025
1 day ago

BAM Nuttall fined £800,000 after concrete skip tragedy

Young labourer killed by falling bale arm
2 days ago

Keltbray infrastructure business reveals new name

AUREOS means "new dawn" after private equity acquisition
1 day ago

Stiffer fines for over-running street works from next Summer

Cash raised from lane rentals to be channeled into pothole repairs
1 day ago

£113m Basildon rental homes scheme seals build finance

Work expected to start early next year on Market Square project
1 day ago

Notting Hill Genesis seeks more tier 1 repairs contractors

London housing trust seeks eight firms for new £1.5bn repairs framework
1 day ago

Reclaimed steel oil rig columns worked into London office revamp

Curo will use reclaimed bricks and steel for Fitzrovia office overhaul
2 days ago

CITB delays levy approval consultation

Levy agreement talks pushed back by ongoing review into effectiveness of training body
2 days ago

Ofwat approves £104bn water industry spending plan

Household water bills to rise by 36% to fund quadrupling of investment
2 days ago

Costain/ Siemens JV clinches HS2 power supply job

£300m deal for HV power supply systems over the 225km route
2 days ago

Demolition team assembles on Multiplex London Wall site

Erith to start work next month at Deutsche Bank's former headquarters
3 days ago

Norwich Council acts to revive £300m Anglia Square scheme

Council uses Homes England funding to buy stalled site with planning for 1,100 homes
2 days ago

Go-ahead for 4,500-home Cambridgeshire new town

Waterbeach new town plan stalled three years ago after an Environment Agency objection
2 days ago

Henry Boot to take total control of Stonebridge Homes

Deal worth at least £30m
2 days ago

HS2 costs could hit £66bn

Government looking for next estimate to be lower
3 days ago

Mace to close construction logistics arm

Specialist business being wound down
3 days ago

National Grid to invest £35bn over next five years

Plan set out for record investment in electricity transmission infrastructure
3 days ago

Profits double at Barhale

Civils specialist sees order book top £1bn
3 days ago

Balfour wins 68km HV underground power cable deal

Main works to start next year on Eastern Green Link 2 job
3 days ago

Stunning site wrap unveiled on Sloane Street

Hoarding creates illusion of fully formed façade on £53m Galliford Try job
3 days ago

Heathrow Airport upgrade spend takes off again

Airport operator will spend £2.3bn over the next two years
3 days ago

Government buys back over 36,000 military homes

Public ownership deal to release wave of upgrade and new build work
4 days ago

Story Contracting staff braced for rail job losses

Work coming through slower than expected from Network Rail
4 days ago

Ballymore submits two plans for 3,700 East London homes

Construction could start in 2025 on Thames Road and Knights Road schemes
4 days ago

Blackpool council steps in on failed developer’s £300m scheme

Blackpool Central site clearance to start in the New Year as hunt starts for new developer
5 days ago

Brookfield submits retro-first London office plan

Milton Gate plan for Square Mile will hike space by nearly 50%
4 days ago

Bowmer + Kirkland gets start date for £100m Siemens site

Construction to begin early next year on Chippenham scheme
5 days ago

Torsion sells under-construction Leeds BTR scheme

Concrete frame due to start soon on 300-apartment complex
5 days ago

Contractor services