Balfour Beatty bags £17m Kincardine Bridge upgrade

Aaron Morby 2 years ago
Share

Transport Scotland has awarded the £17m contract to replace an 80m section of the Kincardine Bridge near Fife to Balfour Beatty.

The project, with main works on site expected to get underway from early summer, will involve demolishing the Kincardine Bridge’s southern piled viaduct and replacing it with a completely new reinforced concrete structure.

Construction is expected to take two years.

The southern piled viaduct has been supported by a steel propping system since 1992.

Disruption to road users will be minimised during the project by diverting traffic along a temporary two-lane bridge, to be constructed alongside the old viaduct. This temporary bridge will also provide access for pedestrians.

Once complete, the new viaduct will be similar in appearance to adjacent spans on the original bridge, with lamp posts and parapets from the demolished viaduct reinstated on the new structure.

Transport Scotland’s operating company for the South East of Scotland, BEAR Scotland is managing the project. Detailed design has been carried out by Jacobs.

Graeme Dickie, director of operations at Balfour Beatty said: “The replacement of the Kincardine Bridge southern piled viaduct is an important project, one which will ensure the long-term future use of the bridge.

“Throughout our works, we will remain focused on reducing our impact on the environment by reusing materials from the existing structure wherever possible, whilst also minimising disruption to the travelling public and local communities.”

Latest news

Deal to start £1.1bn British Library extension

Japanese developer takes control with aim to start construction next year
21 hours ago

Fraud warning over bogus site supplies orders

Site temporary protection specialist sounds alarm after foiling scammers
5 hours ago

United Living buys street lighting contractor

North West's Jones acquisition also strengthens power distribution offer
6 hours ago

Plan for world’s tallest energy-positive tower in Birmingham

£60m solar clad 29-storey tower will produce more energy than it consumes
4 hours ago

Costain to lead on nuclear fuel site upgrade

Programme delivery partner role for upgrade to infrastructure at Capenhurst site
5 hours ago

Willmott Dixon wins £32m Doncaster digital tech hub

Construction to start next month on Gateway One scheme
5 hours ago

Pickstock to build Stratford resi tower

Construction set to start next year by modular builder owner
5 hours ago

ISG accountants face investigation over audit

Watchdog launches probe into final accounts for collapsed contractor
1 day ago

Developer given suspended jail sentence for fire safety breaches

Director wrongly allowed residents to move into block before getting fire safety sign-off
1 day ago

Muse submits 1,600-home regen plan for Solihull town centre

Work to start early next year on Mell Square shopping centre redevelopment
1 day ago

Plans to be submitted for £140m Cardiff Central revamp

Enabling works to start this year to pave the way for construction
1 day ago

Developer fined after site hit with nine safety notices

Company "showed a total disregard to keeping its workers safe"
2 days ago

Ringway retains Hertfordshire highways after 12 years

Contract worth £55m a year and could be extended to 21 years
2 days ago

Driver pulls knife on Balfour Beatty road worker

East Sussex incident highlights dangers faced by highways staff
2 days ago

Wates starts £300m Suffolk prison expansion

Firm to build three house blocks at HMP Highpoint
2 days ago

Southern Housing seeks 10 firms for £1.7bn upgrade deal

South east fire safety and housing upgrade framework out to bid
2 days ago

Pothole patch-up policy fails as roads repair backlog hits £17bn

Industry calls for urgent mindset change on funding and maintaining local roads
2 days ago

Green light for 2,100 homes at old East London gasworks

St William secures S106 deal for world’s largest Victorian gasworks regen scheme
3 days ago

Lifting regs review bagged up with ‘bat and newt’ red tape purge

Government calls in regulators and tells Ofwat to speed up 30 major water projects
3 days ago

House builders call for rethink on Building Safety Levy

Developers call for spotlight to be turned on product manufacturers
3 days ago

Costain raids Balfour Beatty for new head of rail

Alistair Geddes joins as rail director
3 days ago

Plans in for nearly 900 homes at Manchester Mayfield

First homes at £1.4bn regeneration site will be built over four blocks
3 days ago

Problem contracts send Robertson into the red

Contractor confident of return to profit this year after review of jobs
3 days ago

National Grid names key suppliers for £59bn HVDC deal

Cable and converter station supply chain firms named
3 days ago

Contractors wanted for £215m care home framework

Firms invited to express their interest in projects across South West
3 days ago

Muse hires London Crown Estate MD

Simon Harding-Roots will lead regeneration specialist's south office
3 days ago

Pellikaan wins £25m Wiltshire leisure centre job

Work to start next month on Trowbridge swimming pool and gym
3 days ago

Cat deal sees Flannery plant investment top £100m this year

Leading plant hirer continues to invest in fleet
6 days ago

Fall in office and housing activity dents industry output

Confidence fragile after 0.2% dip in output for second month
6 days ago

Lendlease OK’d to start Birmingham’s £1.9bn Smithfield scheme

First phase of 400 build to rent homes at Manor Square approved
6 days ago

Contractor services