£300m Norwich Anglia Square scheme finally approved

Aaron Morby 2 years ago
Share

Developer Weston Homes has finally gained planning for its controversial 1,100-home Anglia Square scheme in Norwich after seven years of work on the plans.

The firm was forced back to the drawing board to completely overhaul its original proposal after the Secretary of State intervened over-turning the City Council’s previous planning approval decision to redevelop the 11.5 acre site.

Resolution to approve Weston Homes’ latest scaled-down hybrid planning application allows the developer to take over ownership of the Anglia Square site from current landowner Columbia Threadneedle.

Although there are several hurdles to be finalised, Weston Homes anticipates that now it will start the phased redevelopment within the next few months.

The £300m development will reinstate the historic street pattern that existed during the Victorian era, to deliver a new neighbourhood in the place of the old shopping centre for Norwich.

Costings


The project is expected to cost around £220m to build over four phases lasting nearly nine years

Estimated demolition costs are £14.5m, split between £5.4m between the area for the detailed planning application plus a further £9.1m for the remainder of the area in later phases .

(l-r) Existing shopping centre site in the north of the city centre and the planned housing-led redevelopment

During the construction, the development will create over 2,200 jobs.

The project will see 14 new building blocks ranging in height from 3 to 8 storeys, which are designed around inner courtyards, a public square and a network of pedestrian streets.

The new plans represent a 35% reduction in the overall floorspace, with the original 20-storey tower plan axed, and 52% of the residential dwellings now dual aspect, compared to 30% previously.

Plans for Anglia Square designed by architect Broadway Malyan

The scheme will also include 8,000 sq m of non-residential floorspace in addition to a community hub, community hall and new employment floorspace.

There will be up to 450 car parking spaces, 1,888 new cycle bays, a North/South cycle path through the site, and 200 trees planted. A further 1.2km of new hedging and ecological features contributing to an +85% biodiversity net gain.

The new scheme will deliver buildings with contrasting red, white and flint grey brick. Features will include cantilevered and ornamental balconies, pitched roofs and dormer windows.

The residential element will deliver one, two and three bedroom homes of mixed tenure, the initial phase comprised of 279 market sale, 58 social rent and 16 shared ownership properties.

A further 747 homes are included in the plans, with the final residential mix to be determined through subsequent Reserved Matters applications.

Bob Weston, Chairman of Weston Homes, said: “Weston Homes is delighted by the Resolution to Grant Planning which underlines the creation of a local ‘Grounded in Norwich’ scheme, designed by the local community of Norwich.

“We have learnt so much from this project, through going back to the drawing board, consulting locally and designing a domestic scale scheme with features led by the aspirations of the people of Norwich rather than Weston Homes.

“We are looking forward to beginning the delivery of this fantastic new development for the people of Norwich.”

Latest news

Morgan Sindall lands £20m Brunswick Wharf scheme in Bideford

North Devon waterside project will provide 100 flats
7 hours ago

New BAM leisure centre pool springs a leak

Contractor investigating "technical issues" delaying new £36m green leisure centre
10 hours ago

Green light for £150m West End office revamp

Shaftesbury Avenue office retrofit retains 75% of original building
15 hours ago

Former Keltbray managers jailed after corruption trial

Jail sentences following bribery probe on jobs including Battersea Power Station
1 day ago

Lidl pumps £500m into store and logistics expansion

Discounter plans 40 new stores this year as expansion ramps up
16 hours ago

JJ Rhatigan UK profit jumps as turnover tops £150m

Irish contractor's expansion in England gathers pace
16 hours ago

Driverless digger to be used on Taylor Woodrow site

Autonomous excavator to work at Manchester Airport after successful trial
16 hours ago

MCS Build lands Basingstoke warehouse scheme

Construction starts this month after £26m funding deal
16 hours ago

Leeds United unveil stadium revamp design

Club has still to set a timeframe for staged Elland Road upgrade
1 day ago

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
2 days ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
2 days ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
2 days ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
2 days ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
2 days ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
2 days ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
2 days ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
5 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
6 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
5 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
5 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
5 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
5 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
6 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
6 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
6 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
6 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
6 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
6 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
7 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
7 days ago

Contractor services