Tarmac fined £1.275m after quarry death

Grant Prior 1 year ago
Share

Tarmac Aggregates Limited has been fined £1,275,000 after a 26-year-old man was crushed to death during maintenance work at Mountsorrel Quarry in Leicestershire.

Luke and his girlfriend Sarah
Luke and his girlfriend Sarah

Luke Branston, from Leicester, died in the early hours of 21 June 2017 after becoming trapped between a conveyor and a feed hopper.

The contractor, working on behalf of Branston Site Services Limited, was part of a nightshift maintenance team repairing a feed hopper at the Loughborough quarry, operated by Tarmac Aggregates Limited.

He had been stood on a conveyor under the feed hopper which had not been effectively isolated – through cutting the power – before the repair work started.

The conveyor was then inadvertently switched on, trapping Branston against the feed hopper, fatally crushing the 26-year-old.

An HSE investigation found Tarmac Aggregates Limited had failed to ensure the feed hopper was properly isolated before the repair work commenced. The test button on the conveyor electrical panel was not connected to the test circuit and was therefore inoperative.

This issue appears to have existed for many years before the incident, meaning Tarmac Aggregates Limited failed to ensure critical defects were recorded and rectified in a timely manner. The company should have also provided a visual and audible pre-start alarm for the conveyor.

The feed hopper and conveyor at Mountsorrel Quarry

Michael Branston, Luke’s brother, said: “Luke wasn’t just my brother, he was my best friend, there with me every step of the way, so the loss was massive for me.”

Sharon Branston, Luke’s mum, said: “I feel this has made us an emotional family, having guilty feelings for being happy. We are still here and he is not. Six years on, I still have hard days and cry over silly things. I still have Luke’s ashes at home as I can’t bear the thought of leaving him.

“Every day I think about Luke and wish he was here still, but I only have memories and photos, that’s all we have left.”

Kevin Branston, Luke’s dad, said: “Sometimes I feel guilty for still being here when Luke’s not. I miss him all the time.”

Tarmac Aggregates Limited, of Birmingham, pleaded guilty to safety breaches and was fined £1,275,000 and ordered to pay £200,000 in costs at Leicester Crown Court yesterday.

A spokesperson for Tarmac said: “We acknowledge the impact of the tragic incident which occurred at Mountsorrel Quarry in 2017 and we extend our heartfelt condolences to the family and loved ones of Luke Branston. 

“The safety of everyone at our sites is of the highest importance to Tarmac and is the primary focus at our operations every day. We have fully cooperated with the Health and Safety Executive throughout the investigation and have implemented a number of actions to prevent reoccurrence.” 

HSE inspector Adrian Jurg said: “This is a devastating tragedy that claimed the life of a young man. Luke’s family have made clear the impact his passing has had on their lives and our thoughts remain with them.

“When a company like Tarmac profit from the hard work of contractors like Luke then the very least they owe him and his family is a duty to ensure he gets home safe at the end of his shift.”

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
1 hour ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
2 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
2 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
1 hour ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
2 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
2 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
1 hour ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
19 hours ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
7 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services