Subcontractor prices fall for first time in over three years

Aaron Morby 1 year ago
Share

Construction buyers have seen the first fall in subcontractor prices in just over three years as output fell again sharply in October.

The steep fall in house building is continuing to weigh heavily on overall construction activity. Also fragile client confidence and elevated borrowing costs were blamed for the fall in new work for the third month running

The bellwether S&P Global/CIPS UK Construction Purchasing Managers’ Index registered 45.6 in October, up slightly from 45.0 in September, but still the second-lowest reading since May 2020.

House building decreased for the eleventh successive month in October and at a much steeper pace than elsewhere in the construction sector (index at 38.5).

Civil engineering activity also decreased sharply (index at 43.7) and the rate of decline was the fastest since July 2022.

But there were some signs of stabilisation in commercial building, with activity falling only marginally and at a slower pace than in September (index at 49.5).

Softer demand for construction products and materials resulted in pressure on suppliers for price discounts.

The latest survey indicated that overall purchasing prices decreased at the fastest pace for over 14 years as lower timber, steel and transportation costs were passed on by vendors.

Tim Moore, Economics Director at S&P Global Market Intelligence, which compiles the survey said: “October data highlighted another solid reduction in UK construction output as elevated borrowing costs and a wait-and-see approach to new projects weighed on activity.

“Competitive pressure on suppliers to pass on lower commodity prices resulted in the fastest decline in input costs since August 2009.

“Subcontractors meanwhile cut their charges for the first time in more than three years in response to a further downturn in workloads during October.”

Dr John Glen, Chief Economist at the Chartered Institute of Procurement & Supply (CIPS), said: “There is no doubt that UK construction is in a difficult period and there will likely be further challenging months to come.

“Despite commercial building activity continuing to fall there were signs of stabilisation within this subsegment, and this may provide a glimmer of hope which the wider construction sector will keep a close eye on as we move into next year.”

 

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
1 hour ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
2 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
2 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
1 hour ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
2 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
2 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
1 hour ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
19 hours ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
7 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services