Green light for 52-storey Isle of Dogs resi tower

Aaron Morby 55 mins ago
Share

Planners in the London Borough of Tower Hamlets have finally given the green light to a residential skyscraper on the Isle of Dogs in London Docklands.

Make designed 170m tall One East Point tower will have two staircases
Make designed 170m tall One East Point tower will have two staircases

Hong Kong private equity firm Gaw Capital and development manager City & Docklands plan to build a 52-storey tower with around 460-flats on the site of low-level office buildings at 4-5 Harbour Exchange Square.

Designed by Make Architects, the One East Point project is expected to support around 700 construction jobs a year during the 51-month demolition and construction period.

At 170m tall, the building will be the second tallest in the Millwall Inner Dock cluster, 15m shorter than the nearby Maddison building in the emerging residential zone.

The stepped, dual-core tower will create shared terrace areas.

The client team includes City & Docklands (development manager), WSP (structural engineer), Meinhardt (M&E Engineer) and Hoare Lea (Fire Engineer).

Simon Passer, MD of City & Docklands, said: “We are delighted with the positive outcome achieved at planning committee for One East Point, which will unlock underutilised office buildings to provide much-needed housing in this well-connected East London location.

“The project will bring significant improvements to the local community, including 120 affordable homes, a retail and leisure offering, and a much-enhanced public realm.”

 

Latest news

Concrete frame defects cost Bellway another £14m

Cost of repairing Greenwich scheme rises while £5.4m was spent on aborted Crest Nicholson chase
59 mins ago

Green light for 52-storey Isle of Dogs resi tower

460 flats One East Point project will be built at 3-4 Harbour Exchange
42 mins ago

Contractors urged to “hire now” as labour supply crunch looms

Vacancies rise and wages grow as fight for new workers intensifies
37 mins ago

Kier confirmed for £20m Yasa Motors Bicester HQ

Developer Bicester Motion advances future mobility business park
16 hours ago

Data centres and airport expansion to spur growth

Government hails £25bn data centre and £1.1bn Stansted Airport expansion plan
17 hours ago

Hinkley Point second reactor unit build up to 30% faster

Engineering team lifts last giant steel ring onto reactor 2 yesterday
45 mins ago

BAM reassures supply chain after winding-up petition

Firm's credit rating temporarily affected after dispute with supplier
1 day ago

Winvic secures Leeds build to rent scheme

Phase one of £500m Sweet Street South Bank regeneration starts
1 day ago

£60m turnover construction group sold to staff

Meldrum Construction Services Group becomes Employee Owned Trust
1 day ago

Starmer vows to “rip out” obstacles to investment

Prime Minister to make pledge at inaugural International Investment Summit
1 day ago

VolkerFitzpatrick starts prep-work for £210m M3 junction upgrade

Main works to begin in early 2025 on Winchester junction job
1 day ago

London super sewer turned on after eight years of construction

£4.5bn project starts protecting River Thames from pollution
1 day ago

Housing and office new work jump fuels output recovery

August new construction work rebounds 1.6% after early summer fall
4 days ago

£300m London City fringe office tower approved

Rocket's 27-storey One Fairchild Street job set for take-off
4 days ago

Consultants named for London Tube Bakerloo Line extension

Aecom and architect WW+P to work up designs for four new stations
4 days ago

15 giant bridge beams lifted into place at HS2 station

Balfour Beatty VINCI carries-out civils work for Solihull station: Video
5 days ago

Ballymore JV picked for £500m King’s Cross scheme

Camley Street scheme to consist of 350 homes and offices
5 days ago

Digger stolen from Dorset site recovered in Poland

Machine found after four month police hunt
4 days ago

Construction firms face claw back of R&D tax credits

HMRC estimates only 38% of construction claims are "wholly compliant"
5 days ago

Willmott Dixon bounces back into profit in first half

CEO predicts ISG demise will shift client mindsets from lowest bid to best quality
5 days ago

M&E specialist Integral UK suffers fifth year of losses

Building services and FM specialist plunges to £32m loss
5 days ago

Glenbrook plans 44-storey Manchester resi tower

Scheme next to Deansgate station will contain 360 flats
5 days ago

Downing submits 430-bed London student scheme

Two-10 storey towers planned at Wandsworth Gasholder Site
5 days ago

Mace construction head steps down

Andrew Jackson leaves top role after three months
6 days ago

Pre-pack saves 60 jobs at fit-out firm WFC Contractors

Aviation fit-out group swoops on up-market hospitality fit-out specialist
6 days ago

Multiplex in talks for ISG’s £70m London offices to labs job

Plan to restart Regent Quarter life science campus with ISG project team
6 days ago

M&E firm goes under after more than 70 years in business

HBS Group Southern employed 75 staff
7 days ago

Trio of big names win £600m biscuit factory revamp

Developer Greystar confirms deals for McLaren, McAleer & Rushe and Sisk
7 days ago

HS2 London tunnels chief joins Transpennine Route Upgrade

James Richardson will take up MD role at TRU in New Year
6 days ago

Transport minister signals HS2 will run to Euston

Decision expected in spending review and budget later this month
7 days ago

Contractor services