Major London offices to student rooms scheme approved

Aaron Morby 2 months ago
Share

Joint venture developers Dominus and Cheyne Capital have got the planning green light to convert offices in the Square Mile into a large student accommodation building containing over 850-beds.

Extra floors will be added to the building which will retain the facade fronting on to Fleet Street
Extra floors will be added to the building which will retain the facade fronting on to Fleet Street

The underused office building at 65 Fleet Street, which were the former offices of law firm Freshfields Bruckhaus Deringe, will be retrofitted and transformed to achieve a BREEAM rating of ‘Excellent’.

The vast majority of the main structure will be reused and retained, while making the building far more energy efficient.

Public realm improvements as part of the proposals also extend to the continued refurbishment and extension of London’s oldest Irish drinking establishment, the Grade II listed Tipperary pub.

Public realm with access to St Bride Foundation’s collection of materials, celebrating the history of print, graphic design and typography.

The proposals include new public access routes and public realm improvements around the local Whitefriars Crypt which is, at present, largely hidden to the public and only accessible via appointment with the building management.

It is all that remains of the 13th-century Whitefriars Monastery, once home to the Carmelite Order of the White Friars, who used to own a large stretch of land between Fleet Street and the river Thames.

Whitefriars Crypt will be opened to the public

Preet Ahluwalia, principal director at Dominus, said: “Our expert team has a robust track record of delivering exemplary schemes that create real value for local communities and economies – 65 Fleet Street will be no different.

“By working with the existing building and with an ambitious design team, we intend to minimise our environmental impact, positively contribute to the City of London’s Destination City Plan and create a place that truly serves the district and its people.”

Chairman of the City of London Corporation planning committee, Shravan Joshi, said: “Once completed, the refurbished building at 65 Fleet Street will boast some of the highest sustainability credentials in the City, while accommodating the world’s best and brightest students and opening up a new cultural space.

“A planning approach that favours retrofitting not only enables us to attract new demographics to recently restored, characterful buildings, but it also maximises the productivity of the Square Mile’s limited space and does so in a way that retains embodied carbon, improves operational efficiency and celebrates our old buildings.”

 

Latest news

Keltbray fine increased to £18m after failed bid rigging appeal

Contractor loses penalty discount for settling with competition authorities
1 day ago

Luxury house builder goes under with 70 job losses

Octagon Developments in administration after 40 years in business
2 days ago

Top Ten best read stories of 2024

The biggest headlines of an eventful year. Have a good one and here's to a successful 2025
2 days ago

BAM Nuttall fined £800,000 after concrete skip tragedy

Young labourer killed by falling bale arm
3 days ago

Keltbray infrastructure business reveals new name

AUREOS means "new dawn" after private equity acquisition
2 days ago

Stiffer fines for over-running street works from next Summer

Cash raised from lane rentals to be channeled into pothole repairs
2 days ago

£113m Basildon rental homes scheme seals build finance

Work expected to start early next year on Market Square project
2 days ago

Notting Hill Genesis seeks more tier 1 repairs contractors

London housing trust seeks eight firms for new £1.5bn repairs framework
2 days ago

Reclaimed steel oil rig columns worked into London office revamp

Curo will use reclaimed bricks and steel for Fitzrovia office overhaul
2 days ago

CITB delays levy approval consultation

Levy agreement talks pushed back by ongoing review into effectiveness of training body
3 days ago

Ofwat approves £104bn water industry spending plan

Household water bills to rise by 36% to fund quadrupling of investment
3 days ago

Costain/ Siemens JV clinches HS2 power supply job

£300m deal for HV power supply systems over the 225km route
3 days ago

Demolition team assembles on Multiplex London Wall site

Erith to start work next month at Deutsche Bank's former headquarters
4 days ago

Norwich Council acts to revive £300m Anglia Square scheme

Council uses Homes England funding to buy stalled site with planning for 1,100 homes
3 days ago

Go-ahead for 4,500-home Cambridgeshire new town

Waterbeach new town plan stalled three years ago after an Environment Agency objection
3 days ago

Henry Boot to take total control of Stonebridge Homes

Deal worth at least £30m
3 days ago

HS2 costs could hit £66bn

Government looking for next estimate to be lower
4 days ago

Mace to close construction logistics arm

Specialist business being wound down
4 days ago

National Grid to invest £35bn over next five years

Plan set out for record investment in electricity transmission infrastructure
4 days ago

Profits double at Barhale

Civils specialist sees order book top £1bn
4 days ago

Balfour wins 68km HV underground power cable deal

Main works to start next year on Eastern Green Link 2 job
4 days ago

Stunning site wrap unveiled on Sloane Street

Hoarding creates illusion of fully formed façade on £53m Galliford Try job
4 days ago

Heathrow Airport upgrade spend takes off again

Airport operator will spend £2.3bn over the next two years
4 days ago

Government buys back over 36,000 military homes

Public ownership deal to release wave of upgrade and new build work
5 days ago

Story Contracting staff braced for rail job losses

Work coming through slower than expected from Network Rail
5 days ago

Ballymore submits two plans for 3,700 East London homes

Construction could start in 2025 on Thames Road and Knights Road schemes
5 days ago

Blackpool council steps in on failed developer’s £300m scheme

Blackpool Central site clearance to start in the New Year as hunt starts for new developer
5 days ago

Brookfield submits retro-first London office plan

Milton Gate plan for Square Mile will hike space by nearly 50%
5 days ago

Bowmer + Kirkland gets start date for £100m Siemens site

Construction to begin early next year on Chippenham scheme
6 days ago

Torsion sells under-construction Leeds BTR scheme

Concrete frame due to start soon on 300-apartment complex
6 days ago

Contractor services