Sisk starts work on £300m Children’s Cancer Centre

Grant Prior 10 hours ago
Share

Sisk has started on site to deliver the £300m Children’s Cancer Centre (CCC) at Great Ormond Street Hospital in central London.

The project will deliver a new 19,000 sq metre clinical building as well as a new front entrance and welcome area for entire hospital.

During the construction phase Sisk will employ over 500 people on site hiring 37 apprentices and creating over 20 work placements for local students.

Sisk has digitally built the project in 4D before beginning on site and the project is fully Building Safety Act (BSA) compliant – the first hospital in UK to go through the BSA process.

Construction is forecast to be complete in late 2028.

Ger Hayes, Managing Director, Sisk said: “It’s an incredible honour to be entrusted with building the new Children’s Cancer Centre at Great Ormond Street Hospital.

“We’re making significant progress in the healthcare sector both in Ireland and the UK and we fully appreciate that Great Ormond Street Hospital is one of the world’s leading children’s healthcare providers. As a family-owned business, we take immense pride in creating lasting legacies within the communities we serve and we are fully motivated to deliver a best-in-class cancer centre for GOSH and the families they support.”

Mat Shaw, Chief Executive of GOSH said: “I am delighted that we are now in contract with Sisk and building work on our fantastic new Children’s Cancer Centre is underway. Reflecting our ambition to put the child first and always, the CCC will help our staff be their best and enable children to play, learn and be with their families even while at hospital.”

GOSH and Sisk are working hard to limit the impacts of the development on the local community and families who are coming to the hospital.

Sisk is using a range of different methods to limit the transmission of dust, noise and vibrations. This includes wrapping the frontage building in sheeting and carefully dismantling it section by section, with waste materials contained before being removed from the site to be recycled or reused.

Latest news

CITB survives another review

Report published after two more years talking about skills crisis
1 hour ago

Plan for film studios switched to data centre cluster

Plans in for six data centre buildings in Buckinghamshire
1 hour ago

Over 800 high-rise resi jobs stalled by safety regulator

Building safety regulator project logjam hits Government growth plan
10 hours ago

McAlpine under fire after another panel comes loose from hotel

High winds cause more problems at recently completed Woking hotel
22 hours ago

McGee starts demolition for £500m South Bank scheme

Former ITV studios will be replaced by two office towers
10 hours ago

Four arrested after hospital construction site burglary

Damage and copper wiring stolen at Hinckley and District General Hospital new building
1 day ago

Caddick kicks off Digbeth regen plan with £43m flats job

First phase 211 flats job starts wider £260m Upper Trinity Street scheme
12 hours ago

Sisk starts work on £300m Children’s Cancer Centre

Great Ormond Street Hospital job will employ 500 on site and last three years
10 hours ago

McAlpine clinches £1.25bn Port Talbot low carbon steelworks job

Deal to build one of the largest electric arc furnaces in the world
2 days ago

McLaren to build top-down on £60m New Bond Street contract

Contractor working to tight technical guidelines on busy Mayfair site
1 day ago

Project delays dull Van Elle first-half results

Piling specialist upbeat about year ahead as order book up 24%
1 day ago

Aggregate Industries appoints new contracting chief

Kevin Murgatroyd promoted to new role
1 day ago

Bouygues wins Immingham £170m import jetty job

French civils firm to build bulk ammonia import facility for hydrogen economy
2 days ago

Plans in for latest phase of Leith port revamp

Construction to start this year on transforming waterfront
1 day ago

Avant Homes starts redundancy consultation

Jobs under threat at Central region
2 days ago

Plans in for Barnet leisure park and 1500 homes

Regal to redevelop Great North Leisure Park in Finchley
2 days ago

JRL wins shell and core for £400m London scheme

220 Blackfriars Road project will rise to 21 and 15 storeys
3 days ago

Robertson strengthens East Midlands leadership

Woodcock promoted to ops director and Brown joins from BAM as commercial director
2 days ago

Match-maker service for stalled S106 housing projects

Clearing website to release logjam of unbuilt developer affordable home commitments
2 days ago

Turnover flat as Glencar rethinks strategy

Industrial and logistics building specialist targets "the right type of work"
3 days ago

McLaren lures another director from McAlpine

Glen Harding to help grow recently launched construction management division
3 days ago

£200m Edinburgh Lloyds HQ redevelopment plan

Landmark Port Hamilton building revamp is Edinburgh's largest ever pre-let deals
2 days ago

Chinese super embassy plan edges closer to go-ahead

Met Police drop concerns about Royal Mint site next to Tower of London
3 days ago

GMI delivers just £1m profit after clearing legacy job

Revenue falls 29% to £232m after 'controlled consolidation'
3 days ago

Construction set for gradual two-year recovery

Construction Products Association says Government will need to deliver on pro-growth strategy
3 days ago

Costain order book swells to £5.4bn

HS2 tunnel fitout and power supply jobs help to lift orders by £1.5bn
3 days ago

Hill to start £450m Coventry City Centre South

Hoardings go up for building start this summer
3 days ago

Green light for next phase of Berkeley Fulham site

Go ahead for towers of 28 and 38 storeys and a podium building of seven-storeys
3 days ago

Nearly 40 solid wall insulation firms suspended

Botched work scandal rocks Government home insulation programme
6 days ago

Manchester 18-storey top-heavy tower approved

Office scheme oversails 19th-century buildings at street level
6 days ago

Contractor services