Balfour Beatty wins Edinburgh Gateway station

Aaron Morby 10 years ago
Share

Balfour Beatty has won the job to deliver the new Edinburgh Gateway station with a £25.6m bid.

The new rail/tram interchange will be built next to the A8 at Gogar. It will improve access to Edinburgh airport for people from the North East of Scotland and Fife.

Balfour’s civil engineering division will build a two storey station building, with two 260m long platforms, an overbridge and pedestrian subway under the A8 from the Gyle Shopping Centre.

Station Cogar

Detailed scope of works

Gogar

Platforms: 260 m long flank platforms with 3.9 m clear headroom to canopies and 4.0 m clear width.

Station Buildings: Two-storey main buildings (on northbound platform, south of the railway) incorporating a 302.5 m² concourse, with 3m wide by 3.2m high footbridge, that also connects to the existing 2-storey Edinburgh Tram building via a tapered footbridge over the tram tracks.

Retaining Wall: Approximately 130 m long, 7.5 to 8 m maximum height, 30-35 m of which acts as a bridge abutment for the pedestrian footbridge/concourse.

Underpass below the A8: Connects the new Edinburgh Gateway Station to the Gyle Centre car park. 5.5 m wide by 2.75 m high (at crown), approximately 45.5 m in length. Automatic sliding lockable doors are incorporated at either end of the underpass, and the underpass is lit with CCTV security provision.

Covered Walkway: A covered walkway is included connecting the station with the underpass.

Car Park and Highways Alterations: 7.3 m wide single carriageway road running from a new priority junction with the proposed link road to the A8 grade separated roundabout. Taxi drop off/pick up with dedicated disabled parking bays outside of the main station entrance. Bus services are catered for with the provision of two dedicated bus stands.

Access: Three lifts allowing step free access to all areas and 6 escalators with adjacent stair cases allowing access to northbound and southbound platforms and the Edinburgh Tram stop.

Telecoms: CCTV and Customer Information Systems. A structured cabling system will be provided for end-to-end connectivity of the communications equipment and will also be provided for the platform and ticket office ticketing systems.

Utilities: Several utilities will require to be diverted as a result of the proposals.
Gogar

 

Latest news

Deck falls off huge scissor lift at Winvic site

Two men seriously injured as platform plunges to the ground
1 day ago

Bouygues seals deal for £119m Cardiff college campus

Construction to start in June on two new buildings
1 day ago

Bid race starts for £15bn schools framework refresh

DfE throws framework open to more contractors
1 day ago

Berkeley’s £600m Borough Triangle project approved

Controversial scheme features two towers of 38 and 44-storeys
2 days ago

London Mayor calls in blocked 600-bed student scheme

Refused 20-storey London PBSA block may still be built
1 day ago

HG to build 500-bed London Stratford student scheme

Work will start later this year subject to gateway 2 safety approval
2 days ago

Arrest after pedestrian death on construction site

Tragedy during site preparation works for new Wigan car park
1 day ago

British Steel threatens closure of Scunthorpe blast furnaces

Chinese owners say sectional steel and rail supplies will be maintained
2 days ago

Planning green light for Sheffield warehouse site

Existing factories to be demolished in new scheme for Rula Developments
1 day ago

New rail property company to unlock land for 40,000 homes

First four sites released in Newcastle, Cambridge, Manchester, and Nottingham
2 days ago

Drainage specialist Subscan files administration notice

Specialist employing 131 people files court notice
2 days ago

Four win Network Rail £300m engineering design deal

Eastern region deal will include design for Northern Powerhouse Rail
2 days ago

Funding go-ahead for Banwell bypass after fresh cost hike

Galliford Try contract rises £14m to £64m after final design change
3 days ago

Graham wins Southport £75m Marine Lakes Centre

Firm replaces Kier which parted ways with backer Sefton Council
3 days ago

Chancellor unveils extra £2bn capital spend a year

Construction promised a defence dividend in military base and homes upgrade work
3 days ago

McLaren confirms subcontractor team on £135m warehouse job

Work starts on TN2 Gateway site in Kent.
3 days ago

Vistry profits slump after site costs reporting debacle

House builder launches internal whistle-blowing service in business culture review
3 days ago

Severfield chief to step down

Alan Dunsmore to leave structural steel group by end of June
3 days ago

Funding hurdle remains as Lower Thames Crossing gains consent

Government claims £9bn project may start in 2026 as private finance options explored
4 days ago

Mace wins £600m Euston Tower overhaul

1970s tower's foundations and core to be retained as floor plates extended
4 days ago

Summer start for main works on London green tower

Axa sanctions start at 50 Fenchurch Street 36-storey office block
3 days ago

Japan’s leading flats builder JVs with L&G for UK push

Partners plan to build over 1,000 rental homes in London
3 days ago

Wates submits plan for 1,000 homes Harrow council scheme

Former civic centre Poets' Corner site kicks off housing partnership
4 days ago

Morgan Sindall upgrades forecast for next 12 months

Overbury fit-out arm gets off to a flying start in 2025
4 days ago

Restructure underway at Henry Boot Construction

New management team restructures business after drop in turnover
4 days ago

Government pledges £2bn stop-gap funding for 18,000 homes

Funding avoids cliff-edge in social housing delivery before new grant programme agreed
4 days ago

Just two major new roads schemes to start this year

National Highways sets out one-year interim spending plan after RIS3 delay
4 days ago

Plans go in for £400m GRAHAM Manchester site

Demolition and enabling works underway with main construction set to start next year
4 days ago

Building safety levy rate set at up to £10,000 a home in London

Levy introduction pushed back a year to Autumn 2026 - list of new rates
5 days ago

BAM wins £100m revamp of Broadgate Tower in London

Front of tower 3-storey extension to use cross laminate time and re-used steel
5 days ago

Contractor services