Green light for London’s 22 Bishopsgate tower

Aaron Morby 9 years ago
Share

London’s city planners have backed plans for a 62-storey tower to rise from the stump of the abandoned Pinnacle scheme at 22 Bishopsgate.

The 1.3m sq ft skyscraper, which is to be built by Brookfield Multiplex, will fill an obvious gap at the centre of the City’s cluster of tall buildings.

Other firms being teed-up for key packages on the £500m construction job include steelwork contractor William Hare, and Carey’s for key concrete packages.

Under the submitted programme concrete core work will resume in March next year after the existing core stump has been removed.

Work stopped in 2012 on the previous Pinnacle building scheme with only the foundations, basements and the lift core up to level nine having been completed.

Of the existing structure, the foundations and basements will be retained, helping minimise the disruption from the new proposal, although new piles will be drilled to support the new building layout.

Construction will involve an off-site consolidated delivery centre to minimise vehicle movements to the site – reducing pollution, improving security and diminishing the number of cyclist accidents with HGVs.

Supplies to and waste from the building will be delivered to a consolidation centre outside central London and energy efficient vehicles will then make far fewer deliveries to the site outside peak pedestrian movement and rush hour times.

22 Bishopsgate

View of City’s future skyline topped out with 22 Bishopsgate skyscraper and several new towers now under construction.

Developers AXA Real Estate and Lipton Rogers are behind the plans drawn up by architect PLP for the 278m building – 10m lower than the previously approved consent.

22 Bishopsgate construction team

Access: Peter Connell Associates
Architect: PLP Architecture
CDM: PLP Architecture
Construction advice: Brookfield Multiplex
Concrete: Careys
Cost Management, Areas, BBD: Alinea
District Surveyor: City of London
Employer’s Representative/ Employer’s Agent: Aecom
Façade Access and Maintenance: WSP Parsons Brinckerhoff
Façade Engineers: Emmer Pfenninger Partners AG
Façade Advice: Josef Gartner
Fire: WSP Parsons Brinckerhoff
Logistics: Wilson James
MEP: WSP Parsons Brinckerhoff
Steelwork: William Hare
Structure: WSP Parsons Brinckerhoff
Sustainability: WSP Parsons Brinckerhoff
Transport: WSP Parsons Brinckerhoff
Vertical Transportation: VT Studio
Well (Delos): Arup

At the top of the building will be a double-height public viewing gallery, which will have dedicated lifts, be free to the public and sit alongside a two-storey public restaurant and bar.

22 Bishopsgate

It will be the first building in London to adopt the new Delos WELL Building Standard.  The Delos standard is the world’s first building standard focused exclusively on human health and wellness and assesses people using the building to measure, certify and monitor features that impact health and wellbeing.

The plans include a conference centre, cafés, food outlets, medical centre, library, wellness suite, and specialised sports facilities.

22 Bishopsgate is designed to achieve a BREEAM Excellent rating and a 25% carbon saving compared to the previous scheme, partly due to the triple glazed ultra-efficient façade.

Latest news

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
31 mins ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
10 hours ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
10 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
10 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
10 hours ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
11 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
11 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
10 hours ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
1 day ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
1 week ago

Contractor services