£340m railway upgrade planned for Liverpool

Aaron Morby 9 years ago
Share

A huge revamp of Liverpool’s Lime Street Station will be at the heart of a £340m spend upgrading the region’s rail network over the next three years.

Building work will start next year building two new platforms at Lime Street Station
Building work will start next year building two new platforms at Lime Street Station

The project will include the creation of two new platforms between the existing platforms seven and eight.

Spending is being brought forward as part of a new partnership between Network Rail, which will plough in £229m, and the Liverpool City Region, putting in £111m – much through Government’s Growth Deal funding.

Other projects include the completion of the final phase of the Merseyrail loop, construction of an an extra section of track between Huyton and Roby to separate slower local services from faster trains, a new station at Maghull North and upgrading the Halton Curve to support new services between Liverpool and Chester.

Martin Frobisher, route managing director for Network Rail, said: “Our aim over the next three years is to give the people of Liverpool the high-quality rail services they deserve. With demand for rail travel expected to rise by 100% over the coming years, these improvements are vital for the future growth and prosperity of this great city region.”

Merseytravel is the strategic transport advisor to the Liverpool City Region Combined Authority and project lead for a number of the schemes.

Liverpool railway improvements

Investment projects detail

Liverpool Lime Street

At Liverpool Lime Street station, track, signalling and platform upgrades will enable longer trains and more frequent services. Lime Street station is expected to close for a period in autumn 2017 and again in 2018, where alternative transport will be provided to passengers.

Liverpool underground upgrade

The final phase the on-going renewal of the riverbed and loop line ‘slab track’ – the railway track on the Wirral line and underground loop section of the Merseyrail network will take place between January and June 2017. This will improve the safety and reliability of services using the underground, which was built in the 1970s. Where previously this work has been undertaken piecemeal Network Rail are grouping the remaining elements together to reduce disruption and complete the works sooner.

Huyton to Roby upgrade

To enable faster services between Liverpool and the east, extra track will be built between Huyton and Roby stations to allow faster services to overtake local stopping services.  This work completes the work already undertaken at Huyton in 2014.

New Liverpool to Chester service – the re-opening of the Halton Curve

The full business case for the scheme will be considered by the Liverpool City Region Combined Authority in April. If approved, work is expected to begin in June 2017 and be completed by May 2018.

A new service between Liverpool and Chester, serving Liverpool Lime Street, Liverpool John Lennon Airport, Runcorn, Frodsham and Helsby will be created through the re-signalling and upgrading of existing single direction track on the Halton Curve. The existing line will be upgraded to provide a two-way hourly service with connections to North Wales in the future.

Weaver to Wavertree re-signalling

Re-signalling work on 16 miles of track between Edge Hill Station in the north and Winsford in the south will get underway this summer, with work starting in full in 2017. 

Newton le Willows station

Newton le Willows station will be transformed, with improvements including a new bus interchange and extended car park facilities and a new booking hall on the south side of the station.

Maghull North (new station)

A new station is to be created between Maghull and Town Green Stations on the Liverpool Central to Ormskirk branch of the Merseyrail network Northern Line to support increasing demand and extensive new housing and employment developments expected in the area. Work will include the creation of a new ticket office, provision of park and ride facilities and lifts and a footbridge to platforms.

Latest news

Redrow chief steps down after Barratt merger

Matthew Pratt leaving after 22 years
16 hours ago

Builder gets suspended sentence for Covid loan fraud

M&E specialist inflated turnover to claim maximum loan
53 minutes ago

Caddick Construction targets £400m turnover

Regional shake-up pays off at contracting arm
19 hours ago

Scores of M&E firms win places on £400m CHIC framework

Axis Europe and Seddon secured spots on social housing deal
1 day ago

Coroner hears how worker was crushed under digger

Inquest opens into tragedy at Rose Builders site
1 day ago

Billington lowers 2025 forecast amid pricing pressure

Tender prices under pressure due to project delays and cancellations
21 hours ago

Willmott Dixon lands Dover town centre revamp

Alliance agreed to regenerate several key council sites
2 days ago

Go-ahead for London City office-to-flats scheme

Hub's 150 Minories job in Aldgate to create 280 co-living homes
2 days ago

Wates mobilises as £200m Middlesbrough scheme approved

Gresham Street scheme includes a hotel, 240 flats and over 400 student rooms
2 days ago

Crashed M&E contractor TNA owed supply chain £7m

Sister company buys assets including company vans
2 days ago

Renaker eyes bumper 2025 despite Gateway 2 concern

Strong construction pipeline to support another record year
2 days ago

Wessex Water picks civils firms for £65m framework

Over 40 smaller firms will support AMP8 civils spending programme
2 days ago

Green light for nearly 400 flats at Leeds scheme

Three blocks up to 18 storeys approved at Armley Road
2 days ago

Subcontractors wanted across South London

Work up for grabs from main contractors and clients: Register now for Constructionline event
2 days ago

Heavy lorry ban on Severn Bridge as cables deteriorate

Crossing "not designed and built for today’s levels or weight of traffic"
2 days ago

Muse submits Oldham town centre regeneration plan

Plan advances for six sites to deliver 2000 homes, an hotel and office space
5 days ago

Construction returns to growth after two tough months

Concern grows Trump turmoil is spooking property investors
5 days ago

Skanska wins £43m Clifton Bridge deal

Contractors says scheme is a "complex project that will be delivered to tight timescales"
5 days ago

Green light for 44-storey Manchester resi tower

Developer Glenbrook to start hunt for main contractor
6 days ago

Ten win £670m Network Rail eastern region small works deal

CK Rail, QTS, Colt and Construction Marine pick up two lots
6 days ago

Mears aims to dominate in compliance and housing upkeep

Firm hails 100% rebid success on a slew of major contract renewals
6 days ago

Investigation after two track workers hit by wagon

Accident in Glasgow during engineering possession
5 days ago

Durkan finance chief joins house builder Thakeham

Paul Kimber confirmed as new Chief Financial Officer
5 days ago

Water win sees Mott MacDonald Bentley hunt for new staff

Recruitment event for the South of England: Register now
6 days ago

Labour master VAT fraudsters target subcontractors

Tax authorities looking to clamp down on payroll fraud
6 days ago

Domis to start this year on £350m Nobu towers

Developer Salboy gains planning for Viadux second phase in Manchester
5 days ago

Phoenix ME rides out ISG collapse with record 74% turnover surge

Pre-tax profit up after Phoenix re-engaged on all former ISG jobs
6 days ago

£200m Viking onshore pipeline project approved

55km underground pipeline to be built from Immingham to Theddlethorpe
6 days ago

Plans in for Bristol Brabazon over-station office block

YTL Construction UK to build 8-storey office block
6 days ago

Mace confirmed for £200m London City office retrofit

Four upper floors to be added to 65 Gresham Street
6 days ago

Contractor services