London’s first timber skyscraper plan put to Mayor

Aaron Morby 9 years ago
Share

London’s first timber skyscraper came a step closer to reality this week after researchers presented Mayor of London Boris Johnson with conceptual plans for an 80-storey building.

Slender "tooth-pick" like structure could rise to 80-storeys say engineers
Slender "tooth-pick" like structure could rise to 80-storeys say engineers

Researchers from Cambridge University have teamed up with engineers and architects to work up plans for a 300m high wooden building integrated within the Barbican.

At present, the world’s tallest timber building is a 14-storey apartment block in Bergen, Norway.

The proposal presented to the Mayor by Cambridge University working with PLP Architecture and engineers Smith and Wallwork pushes the boundaries to envisage a structure that could be the second tallest building in London after The Shard.

Simon Smith of Smith and Wallwork engineers said: “Timber is our only renewable construction material and in its modern engineered form it can work alongside steel and concrete to extend and regenerate our cities. It is only a matter of time until the first timber skyscraper is built”.

Dr Michael Ramage, Director of Cambridge’s Centre for Natural Material Innovation, said: “We’ve designed the architecture and engineering and demonstrated it will stand, but this is at a scale no one has attempted to build before.

“We are developing a new understanding of primary challenges in structure and construction. There is a lot of work ahead, but we are confident of meeting all the challenges before us.”

 The biggest concern for a timber frame building of such scale is fire, but the team said the proposed building would eventually meet or exceed every existing fire regulation currently in place for steel and concrete buildings.

The research team point to potential benefits, such as reduced costs and improved construction timescales and significant reduction in the overall weight of buildings.

The conceptual proposals currently being developed would create over 1,000 new residential units in a 1 million sq ft mixed-use tower and mid-rise terraces in central London, integrated within the Barbican.

Dr Ramage said: “The Barbican was designed in the middle of the last century to bring residential living into the city of London – and it was successful.

“We’ve put our proposals on the Barbican as a way to imagine what the future of construction could look like in the 21st century.”

Timber skyscraper plan

Latest news

Morgan Sindall takes on £22m stalled ISG Cardiff school job

Workplan is being drawn up ahead of work starting on Penarth school
2 mins ago

Luxury house builder files administration notice

£31m turnover Octagon Developments Ltd lodges court notice
35 mins ago

Walker Modular wins bathroom pod deal on student tower

Sealant-free construction method helps supplier dominate student market
35 mins ago

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
14 hours ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
24 hours ago

Enabling works to start on £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
24 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
24 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
23 hours ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
1 day ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
1 day ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
23 hours ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
2 days ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
2 days ago

House builder Camstead goes into administration

Work stopped on three current sites
3 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
2 days ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
2 days ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
2 days ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
2 days ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
3 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
4 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
4 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
3 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
4 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
4 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
4 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
4 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
4 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
4 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
4 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
4 days ago

Contractor services