Watkin Jones £100m east London student tower approved

Aaron Morby 9 years ago
Share

Student homes specialist Watkin Jones has won planning consent to build a £100m tower for the University of London in Stratford, East London.

100m tall Duncan House has been designed by Hodder + Partners
100m tall Duncan House has been designed by Hodder + Partners

The 33 floor Duncan House scheme on Stratford High Street will rise to over 100m and joins a cluster of tall buildings in the area.

Mark Watkin Jones, Chief Executive Officer of Watkin Jones, said:  “We are delighted to have secured planning consent for this latest scheme in our pipeline, which builds our visibility around our business model.  

“We expect to be on site towards the end of 2016 and complete the scheme in 2019.”

The proposed redevelopment of Duncan House has been designed by Hodder + Partners and will deliver 511 beds, 44 residential units and 30,000 square feet of academic space.

Watkin Jones is in advanced negotiations with University of London and their funding partners, to forward sell the student part of the Duncan House scheme as per the group’s business model. 

Stratford Duncan House

The residential units will be sold in a separate transaction by Watkin Jones.  

 

Latest news

Four jailed after Keltbray corruption trial

Jail sentences following probe into jobs including Battersea Power Station
3 hours ago

Leeds United unveil stadium revamp design

Club has still to set a timeframe for staged Elland Road upgrade
32 seconds ago

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
16 hours ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
16 hours ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
15 hours ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
15 hours ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
16 hours ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
16 hours ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
16 hours ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
4 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
5 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
4 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
4 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
4 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
4 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
5 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
5 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
5 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
5 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
5 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
5 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
6 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
6 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
6 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
6 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
6 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
6 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
7 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
7 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
7 days ago

Contractor services