Platform collapse kills carpenter in 16 metre fall

Grant Prior 8 years ago
Share

Three construction companies have been fined more than £1m after a worker died and two others were badly injured at a site in Putney when a temporary platform collapsed.

View of partially collapsed working platform
View of partially collapsed working platform

Southwark Crown Court heard how, on 29 October 2012, a carpenter and a steel-fixer had been standing on a temporary wooden platform above a stairwell opening on the 9th floor of the construction site when it suddenly gave way beneath them.

They fell around sixteen metres down the opening.

Both men landed on the partly-constructed concrete staircase below, where the carpenter sustained fatal injuries.

The steel-fixer survived the fall but was so seriously injured that it took almost three years for him to recover sufficiently to be able to return to work.

An engineer’s assistant who was working in the stairwell on a lower level was hit by falling debris and also sustained serious injuries.

An HSE investigation found that similar platforms had been constructed on other floors throughout the site by using timber joists supported by unsuitable joist hangers with plywood fixed on top.

The platforms, which were part of ‘temporary works’ were neither built to an agreed safe design, nor was the quality of the build checked by those in control of the site, even though they were crucial to the safety of workers on upper floors.

Karen Morris, HM Inspector of Health & Safety, said “The risks of falling from height are well-known, and the risk of joist hanger failure is well-documented.

“This tragic incident illustrates what can happen if temporary works are not properly organised.

“All those who have a role in planning and managing work on site must take responsibility for ensuring that serious risks are properly controlled.”

St James Group Limited, of Cobham, Surrey, the Principal Contractor, pleaded guilty to breaching CDM regulations and was fined £600,000 and ordered to pay costs of £14,935.54.

Mitchellson Formwork and Civil Engineering Limited, of Slough, Berkshire, the contractors responsible for constructing the platforms, pleaded guilty to CDM breaches and was fined £400,000 and ordered to pay costs of £14,935.54.

RGF Construction Limited, of Beaconsfield, Buckinghamshire, a site agent who assisted with managing the work, was found guilty at an earlier hearing and was fined £20,000.

Latest news

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
5 hours ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
1 day ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
5 hours ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
5 hours ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
1 day ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
4 hours ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
1 day ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
1 day ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
1 day ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
2 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
1 day ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
2 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
2 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
2 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
2 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
2 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
3 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
3 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
3 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
3 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
3 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
3 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
3 days ago

Contractor confirmed for business park expansion

Roe Developments to start on next phase of Castle Donington scheme
3 days ago

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 week ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
1 week ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
1 week ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 week ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
1 week ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
1 week ago

Contractor services