BAM Nuttall wins Antarctic research base revamp

Aaron Morby 8 years ago
Share

The British Antarctic Survey has selected BAM Nuttall to modernise its scientific research stations in the frozen wastes of Antarctica.

Rothera

Scientific research base at Rothera will be upgraded as part of the Natural Environment Research Council’s 10-year modernisation programme

The project to modernise UK Antarctic and other research facilities is expected to cost anywhere between £40m-£100m depending on the scope of works and length of programme which could extend to 10 years.

First construction work will start in the Austral summer of 2018 with improvements to wharf and slipway facilities at the Rothera Research Station on the Antarctic peninsula. These improvements will accommodate the new polar research vessel being built at Cammell Laird.

As part of the upgrade to the base, Bam Nuttall will also construct new buildings and improve the airport hangar and landing strip.

This will include demolition of existing buildings and disposal of waste outside Antarctica.

The programme also includes new station buildings and facilities at Bird Island and Signy Island Research Stations, including jetty upgrades, cargo handling, fuel delivery systems and storage

BAS Director of Operations Captain Tim Stockings said: “This is an exciting time for polar science.  Initial construction works include the alteration and extension of the wharf and slipway at Rothera Research Station on the Antarctic Peninsula in preparation for the arrival in 2019-20 of Britain’s new polar research ship.”

BAM will face unpredictable polar weather conditions. The Rothera base is built on a rock promontory situated on Adelaide Island to the west of the Antarctic Peninsula.

Summer temperatures are typically between 0 and +5°C, and in winter range from –5°C to – 20°C, but because of its coastal location and the Southern Ocean low-pressure weather systems, temperatures can vary widely at any time of year.

Prevailing winds are northerlies, reaching gale force on around 70 days a year. Because the station is just south of the Antarctic circle, it is light for 24 hours a day during summer, and for a few weeks in winter the sun never rises above the horizon.

 

Latest news

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
21 hours ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
1 day ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
1 day ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
20 hours ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
2 days ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
21 hours ago

Czech energy tycoon buys UK’s biggest rebar supplier

Spanish offload Celsa UK operation to be rebranded 7 Steel UK
2 days ago

Caddick Construction targets £400m turnover

Regional shake-up pays off at contracting arm
3 days ago

Redrow chief steps down after Barratt merger

Matthew Pratt leaving after 22 years
3 days ago

United Living names new property services senior team

New CEO and COO appointed to lead growth in housing upkeep and retrofit
2 days ago

Wynne triples turnover in three years to over £90m

Five-year growth strategy pays off
2 days ago

Speedy Hire blames Budget for branch closures

National Insurance rises accelerate closure programme
2 days ago

Builder gets suspended sentence for Covid loan fraud

M&E specialist inflated turnover to claim maximum loan
2 days ago

Scores of M&E firms win places on £400m CHIC framework

Axis Europe and Seddon secured spots on social housing deal
3 days ago

Coroner hears how worker was crushed under digger

Inquest opens into tragedy at Rose Builders site
3 days ago

Billington lowers 2025 forecast amid pricing pressure

Tender prices under pressure due to project delays and cancellations
3 days ago

Willmott Dixon lands Dover town centre revamp

Alliance agreed to regenerate several key council sites
4 days ago

Go-ahead for London City office-to-flats scheme

Hub's 150 Minories job in Aldgate to create 280 co-living homes
4 days ago

Wates mobilises as £200m Middlesbrough scheme approved

Gresham Street scheme includes a hotel, 240 flats and over 400 student rooms
4 days ago

Crashed M&E contractor TNA owed supply chain £7m

Sister company buys assets including company vans
4 days ago

Renaker eyes bumper 2025 despite Gateway 2 concern

Strong construction pipeline to support another record year
4 days ago

Wessex Water picks civils firms for £65m framework

Over 40 smaller firms will support AMP8 civils spending programme
4 days ago

Green light for nearly 400 flats at Leeds scheme

Three blocks up to 18 storeys approved at Armley Road
4 days ago

Subcontractors wanted across South London

Work up for grabs from main contractors and clients: Register now for Constructionline event
4 days ago

Heavy lorry ban on Severn Bridge as cables deteriorate

Crossing "not designed and built for today’s levels or weight of traffic"
4 days ago

Muse submits Oldham town centre regeneration plan

Plan advances for six sites to deliver 2000 homes, an hotel and office space
7 days ago

Construction returns to growth after two tough months

Concern grows Trump turmoil is spooking property investors
7 days ago

Skanska wins £43m Clifton Bridge deal

Contractors says scheme is a "complex project that will be delivered to tight timescales"
7 days ago

Green light for 44-storey Manchester resi tower

Developer Glenbrook to start hunt for main contractor
1 week ago

Ten win £670m Network Rail eastern region small works deal

CK Rail, QTS, Colt and Construction Marine pick up two lots
1 week ago

Contractor services