Wear bridge deck slide goes without a hitch

Aaron Morby 8 years ago
Share

Contractors have completed the 300m long bridge deck slide for Sunderland’s new wear crossing in a seamless operation taking just 20 hours.

The temporary blue steel nose will be removed from the deck over the coming weeks and the remaining 40m section of bridge deck will be built in-situ on the north side during the summer months.
The temporary blue steel nose will be removed from the deck over the coming weeks and the remaining 40m section of bridge deck will be built in-situ on the north side during the summer months.

Joint venture partners Farrans Construction and Victor Buyck Steel Construction have now completed the highest risk elements of the innovative bridge construction programme.

The steel and concrete bridge deck weighing 4,750 tonnes was inched across the Wear and now connects Pallion to the south and Castletown to the north.

In February engineers successfully lifted the 1,550 tonnes A-frame centrepiece from a barge after it was sailed from a Belgian prefabrication yard.

Already the project is being hailed as a landmark in the use of off-site construction for bridge building.

Wear bridge

The final 40m of bridge deck will be constructed on the north side of the river and the cable stays will be fitted to the pylon and then attached to the deck.

The cables will be gradually stressed to take the weight of the bridge deck before the temporary supports holding the deck are removed.

Stephen McCaffrey, Project Director for FVB Joint Venture, said: “It was a substantial structure to move across the river, so it was a very slow and steady operation.

“The positioning of the deck throughout was crucial as it had to be navigated through the middle of the pylon and then onto each of the temporary supports built in the river to support it.

“We had a team of people guiding it across and scrutinising its progress, as it was planned to the millimetre, but it went as expected, so we are very happy.”

The bridge is on track to be complete in the spring of 2018.

Latest news

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 day ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
2 days ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
2 days ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 day ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
2 days ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
1 day ago

Czech energy tycoon buys UK’s biggest rebar supplier

Spanish offload Celsa UK operation to be rebranded 7 Steel UK
2 days ago

Caddick Construction targets £400m turnover

Regional shake-up pays off at contracting arm
3 days ago

Redrow chief steps down after Barratt merger

Matthew Pratt leaving after 22 years
3 days ago

United Living names new property services senior team

New CEO and COO appointed to lead growth in housing upkeep and retrofit
2 days ago

Wynne triples turnover in three years to over £90m

Five-year growth strategy pays off
2 days ago

Speedy Hire blames Budget for branch closures

National Insurance rises accelerate closure programme
2 days ago

Builder gets suspended sentence for Covid loan fraud

M&E specialist inflated turnover to claim maximum loan
2 days ago

Scores of M&E firms win places on £400m CHIC framework

Axis Europe and Seddon secured spots on social housing deal
4 days ago

Coroner hears how worker was crushed under digger

Inquest opens into tragedy at Rose Builders site
4 days ago

Billington lowers 2025 forecast amid pricing pressure

Tender prices under pressure due to project delays and cancellations
3 days ago

Willmott Dixon lands Dover town centre revamp

Alliance agreed to regenerate several key council sites
4 days ago

Go-ahead for London City office-to-flats scheme

Hub's 150 Minories job in Aldgate to create 280 co-living homes
4 days ago

Wates mobilises as £200m Middlesbrough scheme approved

Gresham Street scheme includes a hotel, 240 flats and over 400 student rooms
4 days ago

Crashed M&E contractor TNA owed supply chain £7m

Sister company buys assets including company vans
4 days ago

Renaker eyes bumper 2025 despite Gateway 2 concern

Strong construction pipeline to support another record year
4 days ago

Wessex Water picks civils firms for £65m framework

Over 40 smaller firms will support AMP8 civils spending programme
4 days ago

Green light for nearly 400 flats at Leeds scheme

Three blocks up to 18 storeys approved at Armley Road
4 days ago

Subcontractors wanted across South London

Work up for grabs from main contractors and clients: Register now for Constructionline event
4 days ago

Heavy lorry ban on Severn Bridge as cables deteriorate

Crossing "not designed and built for today’s levels or weight of traffic"
4 days ago

Muse submits Oldham town centre regeneration plan

Plan advances for six sites to deliver 2000 homes, an hotel and office space
1 week ago

Construction returns to growth after two tough months

Concern grows Trump turmoil is spooking property investors
1 week ago

Skanska wins £43m Clifton Bridge deal

Contractors says scheme is a "complex project that will be delivered to tight timescales"
1 week ago

Green light for 44-storey Manchester resi tower

Developer Glenbrook to start hunt for main contractor
1 week ago

Ten win £670m Network Rail eastern region small works deal

CK Rail, QTS, Colt and Construction Marine pick up two lots
1 week ago

Contractor services