Roofing firms fined for skylight and snow dangers

Grant Prior 8 years ago
Share

Two local roofing contractors have been fined £66,000 each after putting their workers at risk during roof replacement works in Oldham.

The snow covered roof with unguarded skylights and no edge protection
The snow covered roof with unguarded skylights and no edge protection

MKM Fabrications Ltd had been employed as the principal contractor to carry out a roof replacement on one of the buildings at Valley Mills, Millgate, Delph, Oldham which is currently used for textile production.

The company subcontracted part of the project, which involved replacing a northern light roof structure with a modern composite roof, to Clad-It Limited, which effectively meant employees from two companies were alongside one another.

Concerns were raised to the HSE claiming that men were working on the roof with nothing in place to prevent them falling off the edge or through the roof onto mill workers below.

The subsequent HSE investigation confirmed these hazardous working conditions were in place, with workers from both MKM and Clad-It at risk.

Inspectors also established that these working practices continued during snowy weather.

The roof was covered in fragile skylights which had not been covered to prevent any person stepping onto them and falling through, nor were any measures taken to prevent a worker falling through the large gap created after the skylight had been removed.

Mill employees were also at risk from being hit by falling tools or debris.

Prohibition Notices were served stopping the works until a safe method could be found and put into place.

As principal contractor for the works, MKM Fabrications had the primary responsibility for the health and safety of workers. MKM failed to effectively plan the safe completion of the project and failed to put in place measures to prevent anyone falling from the unguarded sections of the roof.

MKM Fabrications of Royton, Oldham pleaded guilty at Manchester Magistrates’ Court to safety breaches and was fined £66,000 with £3938.38 costs.

As subcontractor for the works Clad-It had a duty to protect its own workers as well as anyone affected by its works.

By allowing its employees onto site without a suitable and sufficient planning being in place, or any physical safeguards to prevent a fall from height, the company exposed its own workers to those risks.

Clad-It Limited of Shaw, Oldham also pleaded guilty and was fined £66,000 with £3938.38 costs.

HSE inspector Matt Greenly said after the case: “MKM and Clad-It failed in their duties to protect the roof workers and anyone working below them in the mill from a foreseeable risk of serious harm.

“The risks to workers here were obvious, and neither company thought it necessary to manage the work at height risks properly.”

Latest news

Wates wins fit-out for Manchester First Street Hub

Smartspace arm secures another Government hub deal
19 hours ago

Big trade names dropped in M Group rebrand

Acquisitive group formed from Morrison Utility services in 2016
17 hours ago

Breyer Group files administration notice

Staff hope rival firm could buy assets and save jobs
22 hours ago

Peel Ports reveals winners for £750m framework

18 firms win places on deal: Full list
20 hours ago

Former Severfield director takes helm at Embrace Steel

New CEO Martin Kelly aims to step up expansion of steelwork contractor
22 hours ago

£302m upgrade funding awarded to FE colleges – list

Cash shared out between England’s 179 college groups
22 hours ago

FK Facades thrives but construction arm hit by ISG row

Dispute with failed contractor costs specialist £5.5m
23 hours ago

Galliford Try gets go-ahead for Milton Keynes PRS tower

33-storey tower needs gateway 2 approval before work can start
2 days ago

Small house builders get £150m funding for green homes

Developers will have to meet-up to ten new criteria to benefit from interest rate discounts
22 hours ago

Lendlease Construction renamed Bovis

US private equity firm completes £35m purchase of UK contracting business and rebrands
2 days ago

Breyer Group battles for survival as rivals circle

Housing maintenance firm fights three winding up petitions in a month
2 days ago

Careys facing £2.4m claim by developer over demolition cartel

Giant Hong Kong developer claims it was overcharged on Lots Road Power Station job
2 days ago

Multiplex profit drops a third as revenue rises to £780m

Spate of new orders sets contractor up for three years of work
2 days ago

Galliford Try and Breheny land latest Sizewell C road deals

More infrastructure deals for new nuclear power station
3 days ago

Worker trapped in collapsed septic tank pit

Contractor and director fined after worker suffers multiple fractures
2 days ago

Homes England buys stalled Broad Marsh site

Demolition to finally be completed as developer hunt begins
2 days ago

Vistry go-ahead for 353 homes at Rochester Riverside

Work to start on next phase of Kent town regeneration at end of this year
3 days ago

M&E firm J S Wright collapsed owing £19m

Trade creditors hit for £11.4m by employee-owned Midlands firm
3 days ago

Right to work checks to be extended to self-employed

Government plans crackdown on illegal working and rogue employers
3 days ago

Midlands developer turns to London with £1bn resi schemes trio

SevenCapital plans 1,000 flats in Kensington, Islington and the Isle of Dogs projects
3 days ago

Deck falls off huge scissor lift at Winvic site

Two men seriously injured as platform plunges to the ground
6 days ago

Weston targets Build to Rent with new division

Weston Partnerships signs first deals with asset managers and councils
3 days ago

Bouygues seals deal for £119m Cardiff college campus

Construction to start in June on two new buildings
6 days ago

£140m cash injection to speed-up flood defence schemes

Funding part of £2.65bn investment over the next two years
3 days ago

Bid race starts for £15bn schools framework refresh

DfE throws framework open to more contractors
6 days ago

Berkeley’s £600m Borough Triangle project approved

Controversial scheme features two towers of 38 and 44-storeys
7 days ago

London Mayor calls in blocked 600-bed student scheme

Refused 20-storey London PBSA block may still be built
6 days ago

HG to build 500-bed London Stratford student scheme

Work will start later this year subject to gateway 2 safety approval
7 days ago

Arrest after pedestrian death on construction site

Tragedy during site preparation works for new Wigan car park
6 days ago

British Steel threatens closure of Scunthorpe blast furnaces

Chinese owners say sectional steel and rail supplies will be maintained
7 days ago

Contractor services