Queensferry Crossing opens £245m below budget

Aaron Morby 8 years ago
Share

The £1.35bn Queensferry Crossing over the Forth has officially opened to traffic today.

2.7km bridge will be formally opened by the Queen on Monday, 53 years to the day after she opened its predecessor, the Forth road bridge. Pic courtesy of Ramboll
2.7km bridge will be formally opened by the Queen on Monday, 53 years to the day after she opened its predecessor, the Forth road bridge. Pic courtesy of Ramboll

Despite severe weather hampering the timetable for delivery, the project was hailed by the Scottish Government for coming in £245m under its spending budget.

Joint venture builder Dragados, Hochtief, American Bridge International and Galliford Try have had to battle against harsh weather condition seeing the completion date pushed back twice and the bridge opening eight months later than originally targeted six years ago.

At the time the consortium secured the design and build job with a £790m bid, significantly lower that the initial estimated cost of somewhere between £0.9bn and £1.2bn.

Because this bridge contract ran until June 2017, the project is technically just 10 weeks late.

The time overrun has had no impact on the overall budget as the joint venture contractors are responsible for all costs associated with the over-run.

The bridge has been a catalyst for employment and business opportunities since work began.

Over 15,000 people have been inducted to work on the construction site since 2011, clocking up over 18 million hours of work in the process.

World class & world record breaking

Queensferry Crossing

  • The structure spans 1.7 miles (2.7km) making it the longest three-tower, cable-stayed bridge in the world.
  • The biggest infrastructure project in Scotland for a generation.
  • New world record in 2013 when we achieved the largest continuous underwater concrete pour. The 24-hour non-stop operation successfully poured 16,869 cubic metres of concrete into the water-filled south tower caisson.
  • Prior to the completion of the final closure sections on the deck, the balanced cantilevers which extend 322m north and south from the central tower, i.e. 644m tip to tip, were recorded by Guinness as the longest ever.
  • Highest bridge towers in the UK. (210m)
  • Longest free-standing balanced cantilever in the world. (Centre Tower deck fan was 644m wide prior to being connected to rest of structure)

Project Director David Climie said: ” It’s been a real roller coaster of emotions but the over-riding emotion at the moment is one of pride.

“Until you’ve actually been out on the bridge during severe winds it’s hard to appreciate the task at hand of delivering such a complex project.

“Experts from across the globe have marvelled at this achievement and so it’s nice to think there will be some recognition at home for the workforce this week too.”

Economy Secretary Keith Brown, said:  “To think that the crossing has been completed six years from the date construction started and ten years since Parliament approved legislation is a remarkable achievement for a project of this scale and complexity.

“The challenges of this location have been well-documented and the real heroes are those who have braved the elements in sometimes horrendous conditions to finish the job.

“This project has released £245m of savings back into the Scottish Budget since construction began. Quite often we see and hear of projects running significantly over budget, so I believe we should be proud of this achievement and take confidence going forward.

“Of course these savings are in addition to those achieved during at contract procurement which reduced the forecast by £512m from the outset.”

The bridge features pioneering new windshielding, which should almost entirely eliminate the need for closures during the frequent periods of high winds in the Forth estuary.

Latest news

Galliford Try and Breheny land latest Sizewell C road deals

More infrastructure deals for new nuclear power station
8 hours ago

Homes England buys stalled Broad Marsh site

Demolition to finally be completed as develop hunt begins
4 hours ago

M&E firm J S Wright collapsed owing £19m

Trade creditors hit for £11.4m by employee-owned Midlands firm
16 hours ago

Vistry go-ahead for 353 homes at Rochester Riverside

Work to start on next phase of Kent town regeneration at end of this year
14 hours ago

Right to work checks to be extended to self-employed

Government plans crackdown on illegal working and rogue employers
16 hours ago

Midlands developer turns to London with £1bn resi schemes trio

SevenCapital plans 1,000 flats in Kensington, Islington and the Isle of Dogs projects
16 hours ago

Deck falls off huge scissor lift at Winvic site

Two men seriously injured as platform plunges to the ground
3 days ago

Weston targets Build to Rent with new division

Weston Partnerships signs first deals with asset managers and councils
16 hours ago

Bouygues seals deal for £119m Cardiff college campus

Construction to start in June on two new buildings
3 days ago

£140m cash injection to speed-up flood defence schemes

Funding part of £2.65bn investment over the next two years
16 hours ago

Bid race starts for £15bn schools framework refresh

DfE throws framework open to more contractors
4 days ago

Berkeley’s £600m Borough Triangle project approved

Controversial scheme features two towers of 38 and 44-storeys
4 days ago

London Mayor calls in blocked 600-bed student scheme

Refused 20-storey London PBSA block may still be built
4 days ago

HG to build 500-bed London Stratford student scheme

Work will start later this year subject to gateway 2 safety approval
4 days ago

Arrest after pedestrian death on construction site

Tragedy during site preparation works for new Wigan car park
4 days ago

British Steel threatens closure of Scunthorpe blast furnaces

Chinese owners say sectional steel and rail supplies will be maintained
4 days ago

Planning green light for Sheffield warehouse site

Existing factories to be demolished in new scheme for Rula Developments
4 days ago

New rail property company to unlock land for 40,000 homes

First four sites released in Newcastle, Cambridge, Manchester, and Nottingham
5 days ago

Drainage specialist Subscan files administration notice

Specialist employing 131 people files court notice
5 days ago

Four win Network Rail £300m engineering design deal

Eastern region deal will include design for Northern Powerhouse Rail
5 days ago

Funding go-ahead for Banwell bypass after fresh cost hike

Galliford Try contract rises £14m to £64m after final design change
5 days ago

Graham wins Southport £75m Marine Lakes Centre

Firm replaces Kier which parted ways with backer Sefton Council
5 days ago

Chancellor unveils extra £2bn capital spend a year

Construction promised a defence dividend in military base and homes upgrade work
5 days ago

McLaren confirms subcontractor team on £135m warehouse job

Work starts on TN2 Gateway site in Kent.
6 days ago

Vistry profits slump after site costs reporting debacle

House builder launches internal whistle-blowing service in business culture review
6 days ago

Severfield chief to step down

Alan Dunsmore to leave structural steel group by end of June
6 days ago

Funding hurdle remains as Lower Thames Crossing gains consent

Government claims £9bn project may start in 2026 as private finance options explored
6 days ago

Mace wins £600m Euston Tower overhaul

1970s tower's foundations and core to be retained as floor plates extended
6 days ago

Summer start for main works on London green tower

Axa sanctions start at 50 Fenchurch Street 36-storey office block
6 days ago

Japan’s leading flats builder JVs with L&G for UK push

Partners plan to build over 1,000 rental homes in London
6 days ago

Contractor services