Track repair team in 125mph train near miss

Grant Prior 7 years ago
Share

Rail safety experts have launched an investigation after a team of track workers narrowly avoided being hit by a 125mph passenger train.

Forward facing CCTV footage from the driver's cab showing the train approaching the group of track workers at 125mph (image courtesy of Virgin Trains East Coast)
Forward facing CCTV footage from the driver's cab showing the train approaching the group of track workers at 125mph (image courtesy of Virgin Trains East Coast)

The Rail Accident Investigation Branch has revealed initial details of the incident on October 5 involving the the 10:03 Virgin Trains service from London Kings Cross to Leeds.

The near miss took place close to Egmanton level crossing between Newark North Gate and Retford on the East Coast Main Line.

The train was approaching the crossing on the down main line at near to the maximum permitted line speed of 125 mph when the driver saw a group of track workers in the distance.

The driver sounded the train’s warning horn, but could see no response from the group. The driver sounded the horn again a few seconds later.

He could still see no response, so he initiated an emergency brake application, while continuing to sound the horn.

As the train approached, the group of track workers became aware of the warning horn and started to move into the cess.

The last member of the group got clear of the track very shortly before the train passed them.

It subsequently came to a stand around 0.9 miles after the emergency brake application was made.

There were no injuries but the driver, who believed that the train had struck members of the group, was distressed by the incident.

The RAIB investigation will determine the sequence of events. It will also include consideration of:

  • how the system of work the team was using was planned and authorised, including the availability of protection and warning systems
  • the way in which the system of work the team were using was implemented on site, including how this may have been affected by the layout of the track, the proximity of the crossing and the work being undertaken
  • the competence management of those involved in the planning, authorisation and implementation of the system of work
  • the non-technical skills of the site team and any issues associated with workload and fatigue
  • any relevant underlying cultural or management factors

Latest news

Winners revealed for £5.4bn electricity grid upgrade

SP Energy Networks unveils 19 winners - full list
22 hours ago

Malaysian property giant to buy 50% stake in JRL

IJM Land to buy into diversified £800m turnover south east contractor
1 day ago

Fast-track skills hubs to train 5,000 extra apprentices

Plan for network of 32 skills hubs to rain construction apprentices in half the time
21 hours ago

Luxury house builder files administration notice

£31m turnover Octagon Developments Ltd lodges court notice
1 day ago

Morgan Sindall takes on £22m stalled ISG Cardiff school job

Workplan is being drawn up ahead of restart on Penarth school
1 day ago

Walker Modular wins bathroom pod deal on student tower

Sealant-free construction method helps supplier dominate student market
1 day ago

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
2 days ago

Enabling works to start on £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
2 days ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
2 days ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
2 days ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
2 days ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
2 days ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
2 days ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
2 days ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
3 days ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
3 days ago

House builder Camstead goes into administration

Work stopped on three current sites
4 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
3 days ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
3 days ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
3 days ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
3 days ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
4 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
5 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
5 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
4 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
5 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
5 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
5 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
5 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
5 days ago

Contractor services