Designs unveiled for £500m Leeds HS2 station hub

Aaron Morby 7 years ago
Share

Initial designs have been released for the £500m remodelled Leeds Station for HS2’s arrival along with a blueprint for a surrounding station redevelopment.

New front entrance and adjoining landscaping work to create a world-class main gateway entrance to Leeds
New front entrance and adjoining landscaping work to create a world-class main gateway entrance to Leeds

Consultant Atkins is leading a consortium of design, engineering and project management consultants on the planning and design work for the new gateway station complex.

They include Gensler’s acting as lead for transport and infrastructure  and Hiro Aso as lead architect, which was behind the redevelopment of King’s Cross Station in London.

New central common concourse connecting HS2, Northern Powerhouse Rail and existing rail services, with an overbridge to access all other platforms.

The new-look station offers passengers a seamless interchange for changing trains.

A remodelled and extended station will include new entrances, a new central common concourse, extra platforms, a new undulating roof, footbridge and the creation of a surrounding station campus for commercial, residential and leisure developments.

The city centre’s road network would be remodelled with adjoining streets and those under the station being pedestrianised, with the dark arches being transformed into new retail and leisure spaces.

Proposed new entrances and public space connecting to the South Bank and the new city park

The station masterplan sets out the potential for 3m sq ft of commercial development around the station, with a further 80,000 sq ft of leisure and retail space inside as part of the new common concourse.

In Leeds the arrival of HS2 is a key element of the regeneration of the South Bank, a 250-hectare regeneration project creating at least 8,000 new homes and generating 35,000 jobs, featuring the new learning hub for the city, a new city park and a reimagined River Aire waterfront. This regeneration will double the size and economic impact of Leeds city centre.

Mike McNicholas, Managing Director for Infrastructure at Atkins, said: “The Leeds Station district will be one of the largest integrated transport hubs in the UK.

“It will bring together HS2, the classic railway, buses, coaches and taxis into a single place enabling easier journeys between cities in the Northern Powerhouse and around Leeds itself. The bold vision for the district will ensure Leeds remains a key gateway to the north and surrounding areas.”

To see the full report on the Leeds Integrated Station Masterplan approved by Leeds City Council’s executive board last month go to http://bit.ly/2ylKQO0.

 

Latest news

Deck falls off huge scissor lift at Winvic site

Two men seriously injured as platform plunges to the ground
20 hours ago

Bouygues seals deal for £119m Cardiff college campus

Construction to start in June on two new buildings
22 hours ago

Bid race starts for £15bn schools framework refresh

DfE throws framework open to more contractors
1 day ago

Berkeley’s £600m Borough Triangle project approved

Controversial scheme features two towers of 38 and 44-storeys
2 days ago

London Mayor calls in blocked 600-bed student scheme

Refused 20-storey London PBSA block may still be built
1 day ago

HG to build 500-bed London Stratford student scheme

Work will start later this year subject to gateway 2 safety approval
2 days ago

Arrest after pedestrian death on construction site

Tragedy during site preparation works for new Wigan car park
1 day ago

British Steel threatens closure of Scunthorpe blast furnaces

Chinese owners say sectional steel and rail supplies will be maintained
2 days ago

Planning green light for Sheffield warehouse site

Existing factories to be demolished in new scheme for Rula Developments
1 day ago

New rail property company to unlock land for 40,000 homes

First four sites released in Newcastle, Cambridge, Manchester, and Nottingham
2 days ago

Drainage specialist Subscan files administration notice

Specialist employing 131 people files court notice
2 days ago

Four win Network Rail £300m engineering design deal

Eastern region deal will include design for Northern Powerhouse Rail
2 days ago

Funding go-ahead for Banwell bypass after fresh cost hike

Galliford Try contract rises £14m to £64m after final design change
2 days ago

Graham wins Southport £75m Marine Lakes Centre

Firm replaces Kier which parted ways with backer Sefton Council
3 days ago

Chancellor unveils extra £2bn capital spend a year

Construction promised a defence dividend in military base and homes upgrade work
3 days ago

McLaren confirms subcontractor team on £135m warehouse job

Work starts on TN2 Gateway site in Kent.
3 days ago

Vistry profits slump after site costs reporting debacle

House builder launches internal whistle-blowing service in business culture review
3 days ago

Severfield chief to step down

Alan Dunsmore to leave structural steel group by end of June
3 days ago

Funding hurdle remains as Lower Thames Crossing gains consent

Government claims £9bn project may start in 2026 as private finance options explored
4 days ago

Mace wins £600m Euston Tower overhaul

1970s tower's foundations and core to be retained as floor plates extended
4 days ago

Summer start for main works on London green tower

Axa sanctions start at 50 Fenchurch Street 36-storey office block
3 days ago

Japan’s leading flats builder JVs with L&G for UK push

Partners plan to build over 1,000 rental homes in London
3 days ago

Wates submits plan for 1,000 homes Harrow council scheme

Former civic centre Poets' Corner site kicks off housing partnership
4 days ago

Morgan Sindall upgrades forecast for next 12 months

Overbury fit-out arm gets off to a flying start in 2025
4 days ago

Restructure underway at Henry Boot Construction

New management team restructures business after drop in turnover
4 days ago

Government pledges £2bn stop-gap funding for 18,000 homes

Funding avoids cliff-edge in social housing delivery before new grant programme agreed
4 days ago

Just two major new roads schemes to start this year

National Highways sets out one-year interim spending plan after RIS3 delay
4 days ago

Plans go in for £400m GRAHAM Manchester site

Demolition and enabling works underway with main construction set to start next year
4 days ago

Building safety levy rate set at up to £10,000 a home in London

Levy introduction pushed back a year to Autumn 2026 - list of new rates
5 days ago

BAM wins £100m revamp of Broadgate Tower in London

Front of tower 3-storey extension to use cross laminate time and re-used steel
5 days ago

Contractor services