Coleman warns Didcot-style disaster could happen again

Grant Prior 7 years ago
Share

Coleman & Company has carried out its own investigation into the Didcot disaster which killed four of its workers in February 2016.

The demolition specialist is warning that a similar tragedy could occur again if current industry practices are not reviewed.

A joint HSE and Thames Valley Police (TVP) investigation into the Didcot collapse is still ongoing with the site not expected to be cleared completely until this Spring.

Senior Investigating Officer Detective Chief Inspector Craig Kirby said: “This is an extremely wide scale and hugely complex investigation.

“To date over 1900 witness statements have been taken by the investigative team, and a number of interviews have been conducted under caution.

“These interviews have taken a significant length of time, and further interviews will need to be undertaken.

“On-site recovery of evidence continues to be a key line of enquiry, to understand why the boiler house collapsed.

“At this time it is not possible for us to put a timeframe on the completion of the investigation.”

Coleman bosses are worried that unsafe practices are still going on in the industry while firms wait for post-Didcot guidance.

Director James Howard said: “It is clear that Thames Valley Police and the HSE have not yet crystalized a view on the cause of the collapse.

“Given the size, complexity and nature of the investigation this is, perhaps, understandable but we share in the frustration and disappointment that this has created, and continues to create, for all those affected.

“At the time of the accident we pledged to share the learning from this tragedy as soon as possible, in the interests of both the families and the wider demolition community.

“With that in mind, we commissioned our own investigations which, in our view, clearly show why and how units 1 and 2 of the boiler house collapsed.

“We believe the findings highlight industry-wide practices that need to be challenged and reviewed.

“We now consider it essential to share this learning as a matter of urgency, so that immediate steps can be taken within the industry to prevent future loss of life and so that the families can begin to understand what caused this dreadful accident.”

 

Latest news

Bid rigging probe launched into school repair work

Firms raided this week with focus on roofing contracts
8 mins ago

Credit insurance saves Billington from ISG hit

Steel specialist puts on extra shifts at its plants to cope with demand
5 hours ago

M&E specialist Dodd doubles profit on retrofit surge

Family-owned Telford specialist delivers record revenue of nearly £250m
4 hours ago

Go-ahead for 800-home Croydon dual towers

One Lansdowne Road build to rent scheme to cost £260m to build
5 hours ago

Construction inflation set to return raising tender prices

End of 2024 to mark the bottom of present inflationary trough
5 hours ago

Start date for vast Balfour and Costain carbon capture power job

£4bn Teesside project to start construction next year creating 3,000 jobs
21 hours ago

Plans go in to start revamp of North Finchley town centre

Developer Regal unveils first details of Barnet masterplan
5 hours ago

Glencar bags £18m Big Yellow London store

Six-storey stoarage centre to be built at Staples Corner
4 hours ago

Plan unveiled for 31-storey London Fenchurch Street tower

Demolition work to start in 2026 for new office tower
1 day ago

Vinci Building buys tower cranes for first time

Contractor invests in two WOLFFKRAN all-electric cranes at £138m Sheffield site
1 day ago

30 local firms land United Utilities £500m framework

Minor works deal win for North West civils and M&E specialists
1 day ago

Restructure pays off as Higgins returns to profit

Housing contractor recovers from £25.9m loss last year
1 day ago

Former Heathrow boss joins Mace in board rejig

Firm completes string NED appointments to expanded group board
2 days ago

Planning officers to get powers to bypass committee stage for housing

Rayner reform plan to cut out local council planning committees
2 days ago

National Insurance hike to delay construction recovery

Arcadis paints varied picture with full recovery delayed until 2026
2 days ago

Gratte Bros rides out cost rises with profit increase

M&E specialist warns of further upward pressure on wage costs
2 days ago

Sellar’s 36-storey London City office tower approved

Demolition work to start in 2026 at 60 Gracechurch Street site
4 days ago

Roofers caught using phone lights to work at night

Roofing boss handed suspended prison sentence for lack of edge protection
2 days ago

£380m North West housing framework out for bid

St Helens-based Torus aims to build 9,000 homes by 2029
2 days ago

Historic property magazine to close

Estates Gazette has been in business since 1858
5 days ago

M&S Marble Arch rebuild approved after three-year planning fight

Plans were delayed when Michael Gove backed carbon campaigners
6 days ago

£191m revamp funding approved for London Barbican Centre

Construction to start in 2027 on five-year programme
6 days ago

RED Construction tops £100m turnover

Builder maintains profit margin at 1.7% as business nearly doubles in size
5 days ago

Timber designs shortlisted for roads ‘footbridge of the future’

Three of five designs for National Highways propose timber structures over busy highways
5 days ago

PM pledges to fast-track 150 infrastructure schemes

Fresh promise to speed up planning decisions on infrastructure and house building
6 days ago

Amey FM firm fined after legionella kills prisoner

Court fines company £600,000 for prison upkeep failures
5 days ago

Buyers report boom in commercial work

Construction bucks slowdown in general economy
6 days ago

Plans in for £250m Stockport 8 housing-led scheme

Work to start on phase 1 by the end of next year
6 days ago

Galliford Try tops monthly contracts league

Contract awards slow down in November
6 days ago

Erith explosives set demolition record at Sizewell

Watch blast at former nuclear turbine hall: Video
6 days ago

Contractor services