Builder jailed after Brighton house collapse

Grant Prior 7 years ago
Share

A building contractor has been jailed after a historic house he was working on partially collapsed.

Hove Crown Court heard how builder Glen Peters (trading as Brow Builders) undermined the structural integrity of the house in Brighton by digging out the basement in February 2015.

He then failed to act on the advice of a structural engineer on how to remedy the situation, resulting in the gable wall partially collapsing and the ground floor collapsing into the basement.

Adjacent properties had to be evacuated and the area cordoned off because there were concerns that members of the public living nearby and passing through the area were at risk.

An HSE investigation found that the property had bungeroosh walls, common to buildings in the Brighton area which were built in the mid-18th to 19th century.

They are constructed with a mixture of rubble, timber, pebbles, stones and flint in a lime mix mortar set between shuttering.

The make-up of these walls makes working on this type of building more challenging in terms of structural stability, meaning that those doing so must fully understand what they are dealing with.

The investigation also found that Peters failed to report the incident to HSE as a dangerous occurrence in accordance with the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations (RIDDOR) 2013.

Glen Peters (trading as Brow Builers) of Woodingdean, Brighton, pleaded guilty to breaching CDM and the RIDDOR regulations.

He was sentenced to five months imprisonment for count one and two months imprisonment for count two to run concurrently. He was also ordered to pay costs of £7,000.

HSE principal inspector Emma Stiles said “Basement work must be properly planned to ensure the structural integrity of the building throughout the construction work.

“When this type of work is done badly, workers and members of public are at significant risk of serious injury or death. In addition, we cannot underestimate the impact on the homeowners when their properties are extensively damaged.”

Latest news

Bid rigging probe launched into school repair work

Firms raided this week with focus on roofing contracts
2 hours ago

Government commits to four new prisons in seven years

£2.3bn pledged for new prison build programme
2 hours ago

Credit insurance saves Billington from ISG hit

Steel specialist puts on extra shifts at its plants to cope with demand
7 hours ago

M&E specialist Dodd doubles profit on retrofit surge

Family-owned Telford specialist delivers record revenue of nearly £250m
6 hours ago

Go-ahead for 800-home Croydon dual towers

One Lansdowne Road build to rent scheme to cost £260m to build
7 hours ago

Construction inflation set to return raising tender prices

End of 2024 to mark the bottom of present inflationary trough
7 hours ago

Start date for vast Balfour and Costain carbon capture power job

£4bn Teesside project to start construction next year creating 3,000 jobs
23 hours ago

Plans go in to start revamp of North Finchley town centre

Developer Regal unveils first details of Barnet masterplan
7 hours ago

Glencar bags £18m Big Yellow London store

Six-storey stoarage centre to be built at Staples Corner
6 hours ago

Plan unveiled for 31-storey London Fenchurch Street tower

Demolition work to start in 2026 for new office tower
1 day ago

Vinci Building buys tower cranes for first time

Contractor invests in two WOLFFKRAN all-electric cranes at £138m Sheffield site
1 day ago

30 local firms land United Utilities £500m framework

Minor works deal win for North West civils and M&E specialists
1 day ago

Restructure pays off as Higgins returns to profit

Housing contractor recovers from £25.9m loss last year
1 day ago

Former Heathrow boss joins Mace in board rejig

Firm completes string NED appointments to expanded group board
2 days ago

Planning officers to get powers to bypass committee stage for housing

Rayner reform plan to cut out local council planning committees
2 days ago

National Insurance hike to delay construction recovery

Arcadis paints varied picture with full recovery delayed until 2026
2 days ago

Gratte Bros rides out cost rises with profit increase

M&E specialist warns of further upward pressure on wage costs
2 days ago

Sellar’s 36-storey London City office tower approved

Demolition work to start in 2026 at 60 Gracechurch Street site
4 days ago

Roofers caught using phone lights to work at night

Roofing boss handed suspended prison sentence for lack of edge protection
2 days ago

£380m North West housing framework out for bid

St Helens-based Torus aims to build 9,000 homes by 2029
2 days ago

Historic property magazine to close

Estates Gazette has been in business since 1858
5 days ago

M&S Marble Arch rebuild approved after three-year planning fight

Plans were delayed when Michael Gove backed carbon campaigners
6 days ago

£191m revamp funding approved for London Barbican Centre

Construction to start in 2027 on five-year programme
6 days ago

RED Construction tops £100m turnover

Builder maintains profit margin at 1.7% as business nearly doubles in size
5 days ago

Timber designs shortlisted for roads ‘footbridge of the future’

Three of five designs for National Highways propose timber structures over busy highways
5 days ago

PM pledges to fast-track 150 infrastructure schemes

Fresh promise to speed up planning decisions on infrastructure and house building
6 days ago

Amey FM firm fined after legionella kills prisoner

Court fines company £600,000 for prison upkeep failures
5 days ago

Buyers report boom in commercial work

Construction bucks slowdown in general economy
6 days ago

Plans in for £250m Stockport 8 housing-led scheme

Work to start on phase 1 by the end of next year
6 days ago

Galliford Try tops monthly contracts league

Contract awards slow down in November
6 days ago

Contractor services