Worker brain damaged by scaffold pole plumb line

Grant Prior 14 years ago
Share

Two contractors are facing huge fines after a worker was left with severe brain injuries after being hit with a scaffold pole being used as makeshift plumb line.

Richard Chodkiewicz, 53, now needs 24-hour care for the rest of his life after the pole fell 15 storeys down a lift shaft and hit him in the head in July 2008 at the Radisson Blu hotel site in Bristol.

Bristol Magistrates’ Court heard that the 7lb pole was being used to measure the shaft when a line holding it – made of either plastic or piano wire – broke and it fell to the shaft pit.

Chodkiewicz, who was wearing a hard hat at the time, suffered a “catastrophic brain injury” that required part of his skull to be removed.

The Bristol Evening Post said he spent six weeks in intensive care and was then transferred to a brain injury rehabilitation unit.

Prosecuting on behalf of the health and safety executive, Dale Collins said the accident had completely changed the lives of Chodkiewicz and his family, who are receiving counselling.

He said: “This has had a devastating effect on Mr Chodkiewicz and also his five children and grandchildren. He now requires 24-hour care and is unable to work.”

Reading a statement from his family, Collins said: “Richard can’t be left alone because he is always at risk, and he needs help with all aspects of daily living. Richard is very childlike in his abilities and needs prompting for all basic skills.”

Yesterday Hoistway Limited, Mr Chodkiewicz’s employer, pleaded guilty to failing to ensure the health and safety of an employee.

Main contractor Miller Construction also pleaded guilty to failing to ensure that a person was not exposed to risks while undertaking the installation of lifts.

Collins told magistrates that Hoistway had failed to provide adequate risk assessments and did not identify hazards; that using a piece of scaffolding was not standard equipment checked by a competent person and was improvised; that there was inadequate site management and supervision, and that there was inadequate protection against people or objects falling.

He said that Miller Construction had carried out insufficient risk assessments, had left openings unguarded and at risk of falling objects, and had not fully checked and failings in Hoistway Limited’s risk assessment.

Defending Hoistway Ben Compton said it “accepted unequivocally” failings in a duty to its employees.

He added: “The offence was not a deliberate breach of the law. It was not reckless, but careless.”

Simon Antrobus, for Miller, said the company’s role was of “overview and monitoring”, adding that its culpability in the case was “relatively low”.

Magistrates said the two companies had failed in their duties “to a significant degree” and ordered the pair be sentenced at Bristol Crown Court, saying that their own powers, to impose a maximum fine of £20,000, were insufficient to adequately punish the firms.

Latest news

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5km TBM drive in 652 days drive
2 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
2 days ago

Care home fire trial collapses

Prosecution withdrawn against four firms including Morgan Sindall Property Services
3 days ago

Leicester rebids £22m station revamp after failed tender race

Council opts for ECI route after receiving one bid for project
2 days ago

Kier wins East Coast College rebuild job in Great Yarmouth

Work to start this summer for 1,300-student college
2 days ago

R G Carter wins £28m hospital car park job in King’s Lynn

MSCP paves way for £1.5bn Queen Elizabeth Hospital rebuild in 2027
2 days ago

London to relax green belt building rules

Sadiq Khan shifts position on planning
2 days ago

Willmott Dixon wins Great Yarmouth waterfront deal

North Quay 10.5 acres mixed-use scheme to advance
3 days ago

SIG chief quits to join Travis Perkins

Gavin Slark to leave by the end of this year
2 days ago

Eight take key spots on £250m Prosper framework

Housing and public building upkeep deal for North East awarded
3 days ago

Early call-out for £150m Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
4 days ago

McLaren storms April contracts league with flurry of wins

Cardiff Bay Arena job headlines a series of big contract wins
3 days ago

Balfour Beatty lifts cash forecast after strong first quarter

Contractor set to hit £1bn average monthly net cash in 2025
3 days ago

Goldman Sachs-owned Adler & Allan buys 180-strong civils outfit

West Country's Glanville Environmental gets new owner
3 days ago

Caddick lands first contract for £200m Skelmersdale revamp

Developer gets green light for masterplan
3 days ago

Van Elle sells HGV fleet to haulage firm

WS Specialist Logistics pays £2.9m to take on fleet and drivers
3 days ago

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
4 days ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
4 days ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
4 days ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
4 days ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
5 days ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
4 days ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
4 days ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
5 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
5 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
6 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
5 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
5 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
5 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
1 week ago

Contractor services