Balfour Beatty fined £500,000 for white finger exposure

Grant Prior 6 years ago
Share

Balfour Beatty Utility Solutions Ltd has been fined £500,000 after exposing workers to Hand-Arm Vibration Syndrome (HAVS) over a nine-year period.

An HSE investigation found that workers at the company were exposed to the risk of hand-arm vibration between 2002 and 2011.

HAVS is a permanent condition affecting the nerves and blood vessels of the hand.

It is also known as white finger and can cause pain, tingling and numbness, making it difficult to carry out everyday tasks.

The condition can render a worker disabled, affecting their chances of employment.

Sheffield Crown Court heard that workers at the company’s sites were regularly exposed to hand-arm vibration while operating hand-held power tools such as hydraulic breakers and floor saws.

An HSE investigation found that the company failed in its legal duty to ensure the risks to workers who used these tools was kept to as low a level as reasonably practicable.

Balfour Beatty Utility Solutions Ltd. failed to assess the risk to workers’ health, failed to put in place and monitor suitable risk control measures and failed to put in place a suitable system of health surveillance.

The company also failed to report to the enforcing authorities a significant number of cases of employees diagnosed with HAVS as was legally required.

Balfour Beatty Utility Solutions Ltd of Sheffield pleaded guilty to safety breaches and was fined £500,000 and was ordered to pay costs of £195,000.

A Balfour Beatty spokesperson said: “The shortcomings in processes identified in this case took place many years ago and were addressed prior to the start of the investigation by the HSE.

“The judge acknowledged both this and that there was no evidence of anyone coming to harm as a result.

“Balfour Beatty takes its responsibilities both for Health and Safety extremely seriously.”

Speaking after the hearing, HSE inspector Christine Mellor said: “This case was about failing to protect workers. Exposure to hand-arm vibration is a well-known risk which Balfour Beatty Utility Solutions Ltd. failed to adequately control.

“The company failed to heed warnings. Early health surveillance detected ill health but still this was not acted upon to prevent on-going exposure.

“This is a particularly serious case because of the extent and duration of failures. The breaches were repeated over several years and this resulted in persistent poor compliance.”

Latest news

Winners revealed for £5.4bn electricity grid upgrade

SP Energy Networks unveils 19 winners - full list
2 days ago

Malaysian property giant to buy 50% stake in JRL

IJM Land to buy into diversified £800m turnover south east contractor
2 days ago

Fast-track skills hubs to train 5,000 extra apprentices

Plan for network of 32 skills hubs to rain construction apprentices in half the time
2 days ago

Luxury house builder files administration notice

£31m turnover Octagon Developments Ltd lodges court notice
2 days ago

Morgan Sindall takes on £22m stalled ISG Cardiff school job

Workplan is being drawn up ahead of restart on Penarth school
2 days ago

Walker Modular wins bathroom pod deal on student tower

Sealant-free construction method helps supplier dominate student market
2 days ago

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
2 days ago

Enabling works to start on £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
3 days ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
3 days ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
3 days ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
3 days ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
3 days ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
3 days ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
3 days ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
4 days ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
4 days ago

House builder Camstead goes into administration

Work stopped on three current sites
5 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
4 days ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
4 days ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
4 days ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
4 days ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
5 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
6 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
6 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
5 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
6 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
6 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
6 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
6 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
6 days ago

Contractor services