Stalled Royal Liverpool Hospital fails cladding check

Aaron Morby 7 years ago
Share

Checks have revealed defective cladding on large parts of Carillion’s stalled Royal Liverpool Hospital project.

Work ground to a halt when Carillion collapsed
Work ground to a halt when Carillion collapsed

The Royal Liverpool and Broadgreen Hospitals NHS Trust revealed that the cost of rectifying serious faults is holding up plans to finish the project, where work halted last January.

Investors are nervous about soaring costs when trying to finalise plans to complete the £350m project.

In a statement today the trust confirmed there has been added complexity in reaching an estimate of the costs to complete the new Royal, as a result of remedial work required to correct faults created by Carillion.

It confirmed Arup had been engaged over recent months to identify the work required to complete the scheme and had identified the need for remedial work to the structure and cladding.

The trust said: “Before they entered into liquidation, the trust sought assurances from Carillion about this cladding and they told us that:

‘There are a number of different cladding systems utilised on the Royal Liverpool University Hospital all of which have been specified and installed to meet the required standards of fire safety….The new hospital has been designed to comply with the requirements of HTM05-02 “Firecode – Fire Safety in the design of healthcare premises.’

“The recent review has found this not to be the case with some parts of the cladding,” claimed the trust.

The trust this morning also revealed it had a break clause in the existing project agreement to allow it to terminate the hospital company PFI contract, if the projects is not handed over by the end of this month.

It said: “The board will be discussing all their options later this month. If the contract was terminated, we would need to engage the lenders in complex discussions regarding the status of their investment. These discussions would need to be resolved before a new contract to complete the hospital could be agreed.

“In the meantime, discussions between the government and the funders to agree a way forward are continuing and we expect these discussions to generate an agreed outcome very soon.”

 

Latest news

Coroner hears how worker was crushed under digger

Inquest opens into tragedy at Rose Builders site
2 hours ago

Willmott Dixon lands Dover town centre revamp

Alliance agreed to regenerate several key council sites
7 hours ago

Go-ahead for London City office-to-flats scheme

Hub's 150 Minories job in Aldgate to create 280 co-living homes
8 hours ago

Wates mobilises as £200m Middlesbrough scheme approved

Gresham Street scheme includes a hotel, 240 flats and over 400 student rooms
9 hours ago

Crashed M&E contractor TNA owed supply chain £7m

Sister company buys assets including company vans
15 hours ago

Renaker eyes bumper 2025 despite Gateway 2 concern

Strong construction pipeline to support another record year
14 hours ago

Wessex Water picks civils firms for £65m framework

Over 40 smaller firms will support AMP8 civils spending programme
15 hours ago

Green light for nearly 400 flats at Leeds scheme

Three blocks up to 18 storeys approved at Armley Road
14 hours ago

Subcontractors wanted across South London

Work up for grabs from main contractors and clients: Register now for Constructionline event
15 hours ago

Heavy lorry ban on Severn Bridge as cables deteriorate

Crossing "not designed and built for today’s levels or weight of traffic"
15 hours ago

Muse submits Oldham town centre regeneration plan

Plan advances for six sites to deliver 2000 homes, an hotel and office space
4 days ago

Construction returns to growth after two tough months

Concern grows Trump turmoil is spooking property investors
4 days ago

Skanska wins £43m Clifton Bridge deal

Contractors says scheme is a "complex project that will be delivered to tight timescales"
4 days ago

Green light for 44-storey Manchester resi tower

Developer Glenbrook to start hunt for main contractor
4 days ago

Ten win £670m Network Rail eastern region small works deal

CK Rail, QTS, Colt and Construction Marine pick up two lots
4 days ago

Mears aims to dominate in compliance and housing upkeep

Firm hails 100% rebid success on a slew of major contract renewals
4 days ago

Investigation after two track workers hit by wagon

Accident in Glasgow during engineering possession
4 days ago

Durkan finance chief joins house builder Thakeham

Paul Kimber confirmed as new Chief Financial Officer
4 days ago

Water win sees Mott MacDonald Bentley hunt for new staff

Recruitment event for the South of England: Register now
4 days ago

Labour master VAT fraudsters target subcontractors

Tax authorities looking to clamp down on payroll fraud
5 days ago

Domis to start this year on £350m Nobu towers

Developer Salboy gains planning for Viadux second phase in Manchester
4 days ago

Phoenix ME rides out ISG collapse with record 74% turnover surge

Pre-tax profit up after Phoenix re-engaged on all former ISG jobs
5 days ago

£200m Viking onshore pipeline project approved

55km underground pipeline to be built from Immingham to Theddlethorpe
5 days ago

Plans in for Bristol Brabazon over-station office block

YTL Construction UK to build 8-storey office block
5 days ago

Mace confirmed for £200m London City office retrofit

Four upper floors to be added to 65 Gresham Street
5 days ago

Lindum profit jumps 28% as turnover nears £200m

507 staff shareholders share in strong year as pre-tax profit hits £10.4m
5 days ago

Universal to build theme park in Bedford

Work to start next year creating 20,000 construction jobs
6 days ago

Go-ahead for £400m Cambridge sewage treatment works

Major greenbelt project pivotal to 8,000-home North East Cambridge scheme
6 days ago

Erith pays down bid-rigging fine over two years early

Total employee ownership bonuses top £5.3m for nearly 450 staff
6 days ago

Network Rail property JV to deliver Cambridge North homes

Blockwork will deliver over 400 homes around local station
6 days ago

Contractor services