Government bans combustible cladding above 18m

Aaron Morby 6 years ago
Share

The Government has confirmed it is banning the use of all combustible cladding on new residential buildings over 18m.

New building regulations will be introduced for external wall systems banning plastics, wood and other products that include combustible materials found in some aluminium composite panel systems.

Materials that would be allowed are those classed as A1 or A2 under the European Classification system.

Hotels and office building would be exempt because they have different evacuation strategies and the risks are lower.

Full details of the proposed ban have yet to be released. It is still not known whether the ban would apply to any material in wall construction from the internal face of the wall through to its external face, as first proposed.

If this proved the case internal wallpaper and paint, window frames, gaskets and seals, vapour membranes, surface finishes and laminated glass would likely be exempted.

To comply with the stricter requirements, it is estimated that for a 15-storey new build requiring 1,700m2 of cladding, a wall system which comprises only materials of A2 will cost an extra £25,000-£75,000.

Across England, this would equate to an expected overall annual cost of £7.5m-£11m assuming average build rates, according to the Government.

The Communities Secretary James Brokenshire confirmed the decision at the Conservative Party Conference.

“I can confirm that I will change the building regulations to ban the use of combustible materials for all new high rise residential buildings, hospitals, registered care homes and student accommodation.

“And bring about a change in culture on building safety.”

The new ban will be implemented through changes to building regulations to be brought forward in late autumn.

The plan to tighten up on materials use on building exteriors came as the Government also issued a further warning that even small amounts of combustible ACM cladding fitted to existing buildings must be removed.

Fresh guidance from the Government’s expert panel revealed that some experts were mistakenly advising building owners that combustible ACM cladding could remain on high rise buildings when fitted to small parts or strips of the building envelope.

The guidance says: “We have become aware that some building owners have received advice that indicates that it is acceptable to leave small or partial amounts of ACM cladding on their buildings.

“Given the risk of fire spread posed by ACM cladding systems, the independent expert advisory panel’s view is that leaving any amount of ACM cladding on a building would continue to pose a hazard to both residents and firefighters in the event of a fire.

“The clearest way to ensure the safety of residents is to remove all ACM, including small or partial areas of ACM, and replace it with a safe material. This remains the most appropriate remediation solution.”

Latest news

Winners revealed for £5.4bn electricity grid upgrade

SP Energy Networks unveils 19 winners - full list
2 days ago

Malaysian property giant to buy 50% stake in JRL

IJM Land to buy into diversified £800m turnover south east contractor
2 days ago

Fast-track skills hubs to train 5,000 extra apprentices

Plan for network of 32 skills hubs to rain construction apprentices in half the time
2 days ago

Luxury house builder files administration notice

£31m turnover Octagon Developments Ltd lodges court notice
2 days ago

Morgan Sindall takes on £22m stalled ISG Cardiff school job

Workplan is being drawn up ahead of restart on Penarth school
2 days ago

Walker Modular wins bathroom pod deal on student tower

Sealant-free construction method helps supplier dominate student market
2 days ago

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
3 days ago

Enabling works to start on £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
3 days ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
3 days ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
3 days ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
3 days ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
3 days ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
3 days ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
3 days ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
4 days ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
4 days ago

House builder Camstead goes into administration

Work stopped on three current sites
5 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
4 days ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
4 days ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
4 days ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
4 days ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
5 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
6 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
6 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
5 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
6 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
6 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
6 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
6 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
6 days ago

Contractor services