Rail inspector in safety blast after another near miss

Grant Prior 6 years ago
Share

The Chief Inspector of Rail Accidents has attacked industry safety standards after another near miss incident.

Image from forward facing CCTV showing the incident. Note: the bright spots are light reflections (image courtesy of West Midland Trains)
Image from forward facing CCTV showing the incident. Note: the bright spots are light reflections (image courtesy of West Midland Trains)

Simon French hit out after a report was released into an incident in north London where a team of track workers narrowly avoided being hit by a passing train.

The Rail Accident Investigation Branch report revealed the workers were placing a trolley on a line they mistakenly thought had been blocked.

The report found ineffective safety practices and no clear ‘Person in Charge’

French said: “The number and type of near misses in recent years is hugely disappointing given the efforts made to address track worker safety during that time.

“Over the same period, Network Rail has introduced a number of changes to procedures, and several new initiatives, to try to reduce the risk. One of these re-introduced the concept that there should be a ‘person in charge’.

“This was intended to make an identifiable and capable person responsible for all aspects of the planning and delivery of safe work, for each job.

“It is disappointing that our investigation found that the way in which this concept had been implemented lacked clarity, and the result of this was confusion on site.

“As well as this organisational issue, we found that staff were disorientated, and did not know which line was which.

“This could have been readily solved if they had had proper diagrams, and if clear signs had been provided at the point where they entered the railway.

“RAIB has raised this issue before – it’s time that the industry thought long and hard about the way it provides critical safety information to its staff and contractors.

“I am concerned that, despite much effort and many initiatives, we are not seeing the hoped-for improvements in safety for track workers.

“Despite all the efforts that the industry has made, this kind of alarming incident is still happening.

“There needs to be complete clarity about who is in charge, where the work is to take place, and which lines are open to traffic.

“I hope that the railway industry will do what’s necessary to ensure that track workers properly understand the track safety processes and the roles of everybody involved in their implementation.”

Latest news

Keltbray fine increased to £18m after failed bid rigging appeal

Contractor loses penalty discount for settling with competition authorities
5 hours ago

Luxury house builder goes under with 70 job losses

Octagon Developments in administration after 40 years in business
15 hours ago

Top Ten best read stories of 2024

The biggest headlines of an eventful year. Have a good one and here's to a successful 2025
21 hours ago

BAM Nuttall fined £800,000 after concrete skip tragedy

Young labourer killed by falling bale arm
2 days ago

Keltbray infrastructure business reveals new name

AUREOS means "new dawn" after private equity acquisition
20 hours ago

Stiffer fines for over-running street works from next Summer

Cash raised from lane rentals to be channeled into pothole repairs
20 hours ago

£113m Basildon rental homes scheme seals build finance

Work expected to start early next year on Market Square project
21 hours ago

Notting Hill Genesis seeks more tier 1 repairs contractors

London housing trust seeks eight firms for new £1.5bn repairs framework
21 hours ago

Reclaimed steel oil rig columns worked into London office revamp

Curo will use reclaimed bricks and steel for Fitzrovia office overhaul
1 day ago

CITB delays levy approval consultation

Levy agreement talks pushed back by ongoing review into effectiveness of training body
2 days ago

Ofwat approves £104bn water industry spending plan

Household water bills to rise by 36% to fund quadrupling of investment
2 days ago

Costain/ Siemens JV clinches HS2 power supply job

£300m deal for HV power supply systems over the 225km route
2 days ago

Demolition team assembles on Multiplex London Wall site

Erith to start work next month at Deutsche Bank's former headquarters
3 days ago

Norwich Council acts to revive £300m Anglia Square scheme

Council uses Homes England funding to buy stalled site with planning for 1,100 homes
2 days ago

Go-ahead for 4,500-home Cambridgeshire new town

Waterbeach new town plan stalled three years ago after an Environment Agency objection
2 days ago

Henry Boot to take total control of Stonebridge Homes

Deal worth at least £30m
2 days ago

HS2 costs could hit £66bn

Government looking for next estimate to be lower
3 days ago

Mace to close construction logistics arm

Specialist business being wound down
3 days ago

National Grid to invest £35bn over next five years

Plan set out for record investment in electricity transmission infrastructure
3 days ago

Profits double at Barhale

Civils specialist sees order book top £1bn
3 days ago

Balfour wins 68km HV underground power cable deal

Main works to start next year on Eastern Green Link 2 job
3 days ago

Stunning site wrap unveiled on Sloane Street

Hoarding creates illusion of fully formed façade on £53m Galliford Try job
3 days ago

Heathrow Airport upgrade spend takes off again

Airport operator will spend £2.3bn over the next two years
3 days ago

Government buys back over 36,000 military homes

Public ownership deal to release wave of upgrade and new build work
4 days ago

Story Contracting staff braced for rail job losses

Work coming through slower than expected from Network Rail
4 days ago

Ballymore submits two plans for 3,700 East London homes

Construction could start in 2025 on Thames Road and Knights Road schemes
4 days ago

Blackpool council steps in on failed developer’s £300m scheme

Blackpool Central site clearance to start in the New Year as hunt starts for new developer
4 days ago

Brookfield submits retro-first London office plan

Milton Gate plan for Square Mile will hike space by nearly 50%
4 days ago

Bowmer + Kirkland gets start date for £100m Siemens site

Construction to begin early next year on Chippenham scheme
5 days ago

Torsion sells under-construction Leeds BTR scheme

Concrete frame due to start soon on 300-apartment complex
5 days ago

Contractor services