Iconic London Zoo aviary revamp out to bid

Aaron Morby 6 years ago
Share

Plans to repurpose and transform the Grade II listed Snowdon Aviary at London Zoo have come out to tender.

The scheme, understood to cost around £7m, will see the iconic structure revamped to create a world-leading facility for Black and White Colobus monkeys and other species native to forests in western and eastern Africa.

Modernising the structure, listed in 1998 as the first permanent tensioned building in the UK, will be the most ambitious project undertaken by the Zoo.

Designed by Cedric Price with engineer Frank Newby and Lord Snowdon in 1962, it became Britain’s first walk-through aviary.

The main structure will be retained and restored where needed with existing aluminium mesh replaced with stainless steel netting.

Snowden Aviary

The Snowdon Aviary is currently on the Historic England Buildings at Risk Register given the poor condition of its structural frame.

The Foster + Partners designed project will also include the construction of three new geodesic timber structures – a new monkey house will be connected by means of two elevated lattice monkey highways made out of laminated bamboo and lined with stainless steel mesh.

Screen Shot 2017-09-13 at 22.54.10

An existing walkway within the aviary will be widened and fitted with new balustrades.

Norman Foster said: “The rebirth of the Snowdon Aviary continues our work with historical structures. It is about the fusion of the old and new, but also about repurposing this extraordinary structure.

The brand-new walk-though home will allow it to extend its role for decades to come. It will ensure the preservation of an iconic structure and honour its distinguished authors from the past, while preserving a unique built example of Cedric Price’s work.”

Screen Shot 2017-09-13 at 23.11.11

Interested firms must submit PQQs by 10 April with view to tenders being invited on 1 May. More details are available from the Delta e-sourcing website.

Latest news

Demolition giant John F Hunt Group sold to staff

Chairman John Hall to remain at helm
19 hours ago

OCU doubles size to over £600m turnover in two years

Private equity owned infrastructure services contractor delivers record year
46 mins ago

Site slavery fears rise over migrant labour gangs

Foreign workers being paid in cash by labour masters on major jobs
26 mins ago

Plans in for major London Shoreditch mixed-use scheme

650,000 sq ft Shoreditch Works scheme includes 19-storey tower
15 mins ago

Wates and Equans bosses join Morgan Sindall Property Services

MSPS strengthens leadership team with two new hires
16 mins ago

Construction falls 20% in Build to Rent sector

Completions consistently outpacing the number of starts
24 mins ago

University of Warwick advances £700m campus plan

Enabling works to get underway for main build works next year
1 day ago

Go-ahead for £750m East London data centre

Urban 11-storey data centre to be built next to River Lea and A13 in Newham
2 days ago

Keltbray Infrastructure Services buys Linbrooke rail arm

First deal since infrastructure business was bought by private equity this summer
2 days ago

Elizabeth Line wins Stirling Prize for architecture

Infrastructure scheme wins premier design prize
1 day ago

Winners named for Worcestershire and West Mids framework

Deal covers development work from design to construction
24 hours ago

Piling starts on HS2 Curzon Street Station

Mace Dragados Joint Venture and Keltbray working on Birmingham site
1 day ago

M Group joins top seven as revenue jumps to £2.2bn

Infrastructure services specialist continues to hunt acquisitions
2 days ago

BlackRock to take control of Lanes Group

Takeover of leading water contractor to complete this month
2 days ago

Yorkshire and Lincolnshire builders’ merchant goes under

1928-founded Builders Merchant Company hit by winding up petition
2 days ago

Trio wins £170m West Country new build housing deal

Curo Enterprise, E.G. Carter and Speller Metcalfe Malvern
2 days ago

Roofer dies in fall from potato box on forklift

Court hears how victim fell 16ft from makeshift platform
2 days ago

Clancy bolsters senior management team

Skanska project director Jon Arnold joins as operations director of energy
2 days ago

High tech construction plant could save country £417bn

Costain report says kit which connects and drives itself will provide a massive economic boost
3 days ago

Concrete frame defects cost Bellway another £14m

Cost of repairing Greenwich scheme rises while £5.4m was spent on aborted Crest Nicholson chase
3 days ago

Green light for 52-storey Isle of Dogs resi tower

460 flats One East Point project will be built at 3-4 Harbour Exchange
3 days ago

Contractors urged to “hire now” as labour supply crunch looms

Vacancies rise and wages grow as fight for new workers intensifies
3 days ago

Kier confirmed for £20m Yasa Motors Bicester HQ

Developer Bicester Motion advances future mobility business park
4 days ago

Data centres and airport expansion to spur growth

Government hails £25bn data centre and £1.1bn Stansted Airport expansion plan
4 days ago

Hinkley Point second reactor unit build up to 30% faster

Engineering team lifts last giant steel ring onto reactor 2 yesterday
3 days ago

BAM reassures supply chain after winding-up petition

Firm's credit rating temporarily affected after dispute with supplier
4 days ago

Winvic secures Leeds build to rent scheme

Phase one of £500m Sweet Street South Bank regeneration starts
4 days ago

£60m turnover construction group sold to staff

Meldrum Construction Services Group becomes Employee Owned Trust
4 days ago

Starmer vows to “rip out” obstacles to investment

Prime Minister to make pledge at inaugural International Investment Summit
4 days ago

VolkerFitzpatrick starts prep-work for £210m M3 junction upgrade

Main works to begin in early 2025 on Winchester junction job
4 days ago

Contractor services