Roofing boss blown off school site in storm

Grant Prior 5 years ago
Share

Bowmer and Kirkland and two trade contractors have been fined £380,000 after the director of one of the firms received serious injuries after falling 11 metres when a gust of wind blew him off a roof.

An HSE picture of the accident scene
An HSE picture of the accident scene

Bowmer and Kirkland, Advance Roofing Ltd and JKW Roofing were working on the roof of the new three storey teaching block of Abbotsfield School for Boys in Hillingdon.

Westminster Magistrates’ Court heard how on 23 February 2017 Storm Doris was moving across the UK bringing gusts of wind up to 94 mph.

Because of the winds there were numerous warnings on site and many activities had been suspended.

But the school roof works continued until the early afternoon when a gust of wind blew JKW Roofing company director John Whitham, 52,  off the roof, along with freestanding A-frame barriers and stacks of insulation.

Whitham sustained severe injuries to his pelvis, vertebrae and tibia, from which he continues to suffer.

Bowmer and Kirkland were the principal contractor on the project. Advanced Roofing were contracted to carry out the roofing works on the project and had sub-contracted the substantive roofing works on the main building to JKW Roofing while using its own workers on other areas.

An HSE investigation found all three contractors had failed to ensure that a suitable and sufficient system to assess the effects of high wind when working at height was being followed.

The companies had taken an informal approach to assessing weather conditions which was not in line with industry standards.

Bowmer and Kirkland Limited, of Derbyshire, pleaded guilty to breaching safety regulations and were fined £350,000 and ordered to pay £6,190.28 in costs.

Advanced Roofing Limited, of Stanton-By-Dale, Derbyshire,  pleaded guilty to safety breaches and were fined £29,300 and ordered to pay £6,187.88 in costs.

J.K.W. Roofing Services Limited, of Nottinghamshire pleaded guilty to safety breaches and received a 12 month conditional discharge and were ordered to pay £6,159.48 in costs.

Speaking after the hearing, HSE inspector Gabriella Dimitrov said: “Those in control of work have a responsibility to devise safe methods of working and to provide the necessary information, instruction and training to the workers in the safe system of working.

“If a suitable safe system of work had been in place prior to the incident, the life changing injuries sustained by Mr Whitham could have been prevented.”

Latest news

Kier and Bam star in two Welsh frameworks worth £1.4bn

Welsh hospitals and South West Wales building frameworks awarded
3 hours ago

Developer GPE targets 40% of reused building materials

Subcontractors will be asked for suggestions on how to cut use of virgin materials
4 hours ago

95 secure spots on major consultants framework

Host of firms win places on Procure Partnerships deal
3 hours ago

Arup restructures board to create new CEO role

Group chair Jerome Frost takes new role at consultant
3 hours ago

Winners revealed for £5.4bn electricity grid upgrade

SP Energy Networks unveils 19 winners - full list
3 days ago

Balfour and Flannery hit training milestone

1,000th student trained at Operator Skills Hub
3 hours ago

Fast-track skills hubs to train 5,000 extra apprentices

Plan for network of 32 skills hubs to train construction apprentices in half the time
3 days ago

Malaysian property giant to buy 50% stake in JRL

IJM Land to buy into diversified £800m turnover south east contractor
3 days ago

Luxury house builder files administration notice

£31m turnover Octagon Developments Ltd lodges court notice
3 days ago

Morgan Sindall takes on £22m stalled ISG Cardiff school job

Workplan is being drawn up ahead of restart on Penarth school
3 days ago

Walker Modular wins bathroom pod deal on student tower

Sealant-free construction method helps supplier dominate student market
3 days ago

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
4 days ago

Enabling works to start on £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
4 days ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
4 days ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
4 days ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
4 days ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
4 days ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
4 days ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
4 days ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
5 days ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
5 days ago

House builder Camstead goes into administration

Work stopped on three current sites
6 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
5 days ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
5 days ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
5 days ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
5 days ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
6 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
7 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
7 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
6 days ago

Contractor services