Graham to start Liverpool flyovers demolition next month

Aaron Morby 5 years ago
Share

Graham Construction will start work on the complex removal of Liverpool’s Churchill Way flyovers next month.

Engineers last year found multiple flaws in the Churchill Way flyovers including poor quality concrete, tendons corroded and signs of structural distress
Engineers last year found multiple flaws in the Churchill Way flyovers including poor quality concrete, tendons corroded and signs of structural distress

Engineers devised a dismantling process that will see each of the 240m long structures come down in 25m long sections.

The highly complex job is set to be completed in December and will cost £6.75m.

The innovative method, devised collaboratively between Amey Consulting, Graham and their specialist contractors, will enable the deconstruction to take place without having to implement a three-month road closure on two major arterial roads servicing Liverpool city centre and the Queensway Tunnel.

The phased dismantling of the two flyovers has also been devised to minimise vibrations to protect antique art and cultural collections housed at the Walker Art Gallery, Central Library and World Museum Liverpool – all of which sit next to the south flyover.

Liverpool City Council approved this sensitive demolition after the two-lane highways were closed last September following the discovery of construction flaws.

Churchhill Way Flyover map
Churchill Way Flyover Deconstruction map

 
Each span – weighing between 300 and 600 tonnes – will be temporarily supported, before being cut free and moved on to a special transporter to a nearby compound, where it will be lowered to ground level, cut into smaller sections and removed off site to be crushed.

A total of 20 spans and supporting piers will be removed over a four-month period.

Once the deconstruction is complete, alterations will be made to the highway layout around the Hunter Street – Byrom Street – Queensway Tunnel entrance, to improve traffic and pedestrian movements.

Mayor of Liverpool Joe Anderson said: “The Churchill Way flyovers are a relic of a cancelled highways plan from half a century ago and given the overwhelming weight of evidence from independent experts about their safety, their removal was the only viable option. We simply have no choice but to take them down as soon as possible.”

Latest news

Severfield finds weld problems on nine HS2 bridges

Steelwork specialist slumps to a loss after £20m hit to fix installed structures
7 hours ago

Wates wins Middlesbrough Gresham regen scheme

Firm will build 230 rental flats, hotel and student 450 student beds
3 hours ago

Scottish Water launches £9bn bid race

Delivery Vehicle 4 is company's largest ever procurement programme
7 hours ago

Multiplex signs off £400m Westminster barracks resi job

Super prime 179 flats to be built at former home of Royal Horse Artillery
16 hours ago

Road worker dies after crash on A30

Collision involving two highways maintenance vehicles and a lorry in Cornwall
1 day ago

Vp launches dedicated rail division

Launch comes as equipment rental specialist posts latest results
8 hours ago

Kori Construction lands £21m Leicester care home

Work to start next month with local supply chain
8 hours ago

Kier in line for £70m Bishop’s Stortford town centre job

Developer Cityheart recommits to regeneration of Old River Lane site
7 hours ago

Kier and Bam star in two Welsh frameworks worth £1.4bn

Welsh hospitals and South West Wales building frameworks awarded
1 day ago

Developer GPE targets 40% of reused building materials

Subcontractors will be asked for suggestions on how to cut use of virgin materials
1 day ago

95 secure spots on major consultants framework

Host of firms win places on Procure Partnerships deal
1 day ago

Arup restructures board to create new CEO role

Group chair Jerome Frost takes new role at consultant
1 day ago

Winners revealed for £5.4bn electricity grid upgrade

SP Energy Networks unveils 19 winners - full list
4 days ago

Balfour and Flannery hit training milestone

1,000th student trained at Operator Skills Hub
1 day ago

Fast-track skills hubs to train 5,000 extra apprentices

Plan for network of 32 skills hubs to train construction apprentices in half the time
4 days ago

Malaysian property giant to buy 50% stake in JRL

IJM Land to buy into diversified £800m turnover south east contractor
4 days ago

Luxury house builder files administration notice

£31m turnover Octagon Developments Ltd lodges court notice
4 days ago

Morgan Sindall takes on £22m stalled ISG Cardiff school job

Workplan is being drawn up ahead of restart on Penarth school
4 days ago

Walker Modular wins bathroom pod deal on student tower

Sealant-free construction method helps supplier dominate student market
4 days ago

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
5 days ago

Enabling works to start on £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
5 days ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
5 days ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
5 days ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
5 days ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
5 days ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
5 days ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
5 days ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
6 days ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
6 days ago

House builder Camstead goes into administration

Work stopped on three current sites
1 week ago

Contractor services