HS2 approval throws ‘lifeline’ to consultants

Aaron Morby 13 years ago
Share

The industry’s work-starved consultants reacted with relief to the Government’s decision to press ahead with the £33bn HS2 railway line.

The decision holds out the promise of much-needed design and consultancy work, expected to be worth up to £350m in fee income alone.

But the reaction from contractors was far more circumspect, as many feared the project start will be allowed to slip in the face of fierce local opposition and prolonged attacks on the cost effectiveness of the investment.

A spokesman for a national contractor said: “We of course welcome it, but the start date is set after the next election. A lot can happen between now and then as we have all seen over the years. The real heavy investment in construction seems like it is going to be a very long way off.”

Despite the caution about when contract work will materialise, the Civil Engineering Contractors Association called for contractors to be brought onto the project at the earliest stage.

CECA director of external affairs Alasdair Reisner said: “The announcement of the go-ahead for the first phase of High Speed 2 is both a phenomenal opportunity for industry, but also an enormous challenge.

“The delivery of HS2, both on time and to budget, will confirm the strengths of the UK infrastructure sector at home and abroad.

He added: “Nonetheless, the decisions that are being made now have the potential to have a huge impact on the delivery of the project. It would be hugely beneficial for those contractors who will be working on HS2 to be involved in the development of the project, even at this early stage.

The Association for Consultancy & Engineering chief executive Nelson Ogunshakin said: “Industry is pleased to see broad cross-party support for HS2.

“The transport select committee reported that no alternative to HS2 offered the increased rail capacity and there is general agreement that the project will pay economic dividends.

“We hope this will see challenges and public concerns resolved quickly and constructively so as to get the project underway without delays.”

One consultant told the Enquirer: “We have been waiting for this and it promises to really boost work at a time when there is little about. It’s a real lifeline for all of us, because not much else is going on in the UK.

He added: “Every major player in the industry is bidding for the consultancy work, which has already come out to tender.”

Government project promoter High Speed 2 Ltd plans to select a framework of firms this year to cover architectural and engineering services, urban planning and landscape engineering, technical testing and analysis services.

Professional fees for the front end of the project have been estimated to cost anywhere from £250m to £350m.

Chair of the Institution of Civil Engineers (ICE) HS2 Expert Panel, Steve Hayter, said: “Government’s willingness to explore different engineering options to minimise the impact on those communities affected must be welcomed.

“Tunnelling on this scale is a proven, effective engineering solution with many advantages. Engineers will now stand ready to do what they do best – overcoming any challenges and ensuring the project succeeds.”

Transport secretary Justine Greening revealed several new measures to mitigate the worst affects of the line, which will see journey times between London and Birmingham cut to just 49 minutes.

A new tunnel as the line passes through Ruislip in West London will remove all noise and visual impacts in that section of the route, and extended tunnelling  in the Chilterns will bring further benefits to that area.

The length of the line which is in tunnel or green tunnel has been increased by over 50%, to around 22.5 miles in nine individual sections.

In addition, around 56.5 miles of the 140 mile route will be partially or totally hidden in cuttings, and the amount on viaduct or embankment  has been substantially reduced.

This means that well over half of the route would be mitigated by a tunnel or cutting.

The Government also confirmed plans for a London link between HS1 and HS2 to allow passengers from Europe non-stop travel to the North.

The decision will also see huge investment in London’s Euston Station and a new station development at Old Oak Common in Hammersmith and Fulham.

Latest news

Mace confirmed for £140m Gatwick Airport Pier 6 extension

Contractor PJ Hegarty has started enabling works in middle of busy airport
15 hours ago

Graham takes on ISG £45m Coventry cultural hub job

Firm will start conversion work in the Spring on former IKEA store
16 hours ago

Alun Griffiths to “restructure and resize” after £95m loss

Redundancies due to be announced at Welsh civils contractor
2 days ago

Fire safety project approval delays hit Van Elle profits

Piling specialist also reviews future of Canadian operation amid fresh economic uncertainty
23 hours ago

JRL Malaysian backers plan £150m London city office refurb

Ardmore set to deliver landmark 25 Finsbury Circus building overhaul
22 hours ago

500-home block to replace 19 storey Sutton office tower

Landmark project to deliver 312 Build to rent and 195 co-living homes
23 hours ago

Building envelope specialist Bailey buys Comar

Specialist now offers complete building envelope solutions
23 hours ago

Subcontractors wanted for work across Wales

Big name buyers at latest Constructionline event: Register now
22 hours ago

Balfour Beatty profit dented by £83m building safety hit

Increased order book at £18bn secures growth over next two years
2 days ago

Expanding utilities specialist Ipsum buys Matrix Power

Power engineering contractor takeover will strengthen offer in North East
2 days ago

Historic scaffolding firm files administration notice

Hertfordshire based Rodells has been trading since 1898
2 days ago

Planning Bill to have “seismic” impact on construction

Building-boosting reforms go before Parliament
3 days ago

Briggs & Forrester hits record revenue and orders

M&E specialist rebounds with strong growth across three divisions
2 days ago

Man Utd confirm plan for £2bn ‘super-tent’ stadium

Club to press ahead with 100,000-seat 'Wembley of the North'
3 days ago

Government spending keeps profits edging-up at Kier

91% of work now with public sector and regulated companies
3 days ago

Costain on track for step change to 5% margin

Alex Vaughan says order book has jumped £1.5bn to £5.4bn
3 days ago

Mace tops February contracts league

Confirmation of £300m London Victoria Street project lifts firm to pole position
3 days ago

Wates raids Laing O’Rourke for new construction operations chief

George Mosey leaves Laing O'Rourke after 16 years
4 days ago

Travis Perkins CEO Pete Redfern steps down due to ill health

Redfern joined builders' merchant last year after 14 years at Taylor Wimpey
4 days ago

Morgan Sindall wins £61m Liverpool lab scheme

Construction to start this Autumn on latest Knowledge Quarter project
3 days ago

Glencar to build timber-framed office block

Work to start next month on 79,200 sq ft scheme in Maidenhead
4 days ago

Shed specialist Marbank files administration notice

£67m turnover portal-framed building specialist files court notice
4 days ago

Birmingham council submits £1bn Druids Heath plan

High rise estate to be replaced by-3,500 home eco village
4 days ago

Cannabis farm gang posed as utilities contractor

Gang jailed for 28 years after diverting power to more than 100 cannabis farms
6 days ago

Firm fined after workers climb scaffold without ladder

HSE investigation prompted by death on Liverpool site
4 days ago

Clancy renews £250m Southern Water deal

Contractor vows to maximise value for money and minimise disruption
4 days ago

McLaren go-ahead for 314 flats Watford scheme

Police station and magistrates court to be demolished
4 days ago

Former Liverpool mayor charged in building contracts probe

Construction bosses also charged as part of Operation Aloft
7 days ago

Bidding to start for £700m Irish sea interconnector work

Work includes converter stations at Hunterston and Kilroot near Belfast
7 days ago

Muse to redevelop Durham County Hall HQ site

Morgan Sindall regen specialist seals another major development deal
7 days ago

Contractor services