Winners named for £3bn offsite schools framework

Aaron Morby 5 years ago
Share

The Department for Education has named the firms it will use for its next-generation of offsite schools.

Caledonian Modular factory delivering modules for Harlow secondary school project
Caledonian Modular factory delivering modules for Harlow secondary school project

The education department’s programme will deliver around 30 schools a year with an estimated pipeline of up to £3bn over the next four years.

The new framework has been split between a £2bn programme of major secondary school projects and a £1bn pipeline of smaller-scale primary schools and secondary school blocks.

Secondary schools and blocks above 6,000 sq m


  • Bowmer & Kirkland
  • Caledonian Modular
  • Elliott Group
  • Laing O’Rourke Construction
  • Wates Construction

Primary school schemes and secondary blocks of 750 sq m to 6,000 sq m


  • Eco Modular Buildings
  • Net Zero Buildings
  • Portakabin
  • Reds10 UK
  • Spatial Initiative

The DfE has drawn up design guides to illustrate how schools might be designed for efficient delivery using modern methods of construction and offsite construction.

Whitehall procurement chiefs expect all projects to be built below existing budgeted costs to save money.

The new DfE Offsite Schools Framework replaces the DfE’s existing suite of three offsite frameworks while also developing and increasing the capacity of the offsite/MMC market to support the progression to Design For Manufacture and Assembly.

David Johnson, preconstruction director at Caledonian Modular, which already has over £80m of Education projects currently in progress, said: “We are delighted to be selected as one of the small team of contractors to work with the DfE in continuing to develop standards for education buildings, using high levels of offsite completion to reduce risk, save time and really optimise speed and efficiency of school design and delivery.”

“This win comes as a result of us demonstrating our capability and capacity to continue to deliver full turnkey schools to a high quality, in half the time and with significantly less disruption than traditional methods.”

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
8 hours ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
9 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
9 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
8 hours ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
9 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
9 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
8 hours ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
1 day ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
1 week ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services