Hotel shortage for construction staff threatens site restarts

Grant Prior 5 years ago
Share

A chronic lack of hotel rooms for travelling construction workers is proving a major problem as more sites look to restart.

The Enquirer has been contacted by contractors struggling to find accommodation for their workers.

Hotels have been closed since the lockdown started last month to everyone apart from key workers.

The key worker list currently includes only construction workers involved in infrastructure repair work.

One contracting boss said: “Finding somewhere for travelling workers to stay at the moment is a total nightmare.

“The government is encouraging us to keep working on site but you need a bit of joined up thinking.

“There are thousands of hotels and B&Bs desperate for the business and we as an industry need the rooms.”

Another specialist added: “We as a company are encountering massive problems being able to source accommodation to be able to return to work.

“We have in-house installation teams as well as subcontract teams and at least 95% of our work sees us having to find accommodation from Monday to Friday because most of our work is in the south and we are based in Barnsley.

“We are now encountering immense pressure from major contractors to return to site but we are finding this impossible without adequate accommodation.

“We either need key worker status to be able to use the handful of hotels that are open or for the government to ease the lockdown and reopen the hotels.”

Find Accommodation Here

Build UK has launched an online hotel finder for contractors here.

Build UK has repurposed its Open Doors website as an accommodation finder for constructiom companies in association with trade body UK Hospitality which has confirmed that during the lockdown its members are able to provide accommodation for workers unable to return home.

 

Latest news

Four jailed after Keltbray corruption trial

Jail sentences following probe into jobs including Battersea Power Station
9 hours ago

Leeds United unveil stadium revamp design

Club has still to set a timeframe for staged Elland Road upgrade
7 hours ago

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
23 hours ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
22 hours ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
22 hours ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
22 hours ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
23 hours ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
23 hours ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
23 hours ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
4 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
5 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
4 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
4 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
5 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
4 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
5 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
5 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
5 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
6 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
5 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
6 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
6 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
6 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
6 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
6 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
7 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
7 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
7 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
7 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
7 days ago

Contractor services