Planning revolution to open housing market to smaller builders

Grant Prior 4 years ago
Share

A radical overhaul of the planning system will be a “major boost” to SME builders.

The Government wants smaller housing developers and contractors to be “key players in getting the country building on the scale needed to drive our economic recovery.”

SME builders have seen their share of the new housing development market drop from 40% 30 years ago to just 12% today.

The complex planning system is seen as a major hurdle for smaller firms.

Now Housing Secretary Robert Jenrick has unveiled plans for a major overhaul of the system with his Planning for the future White Paper.

He said: “Our complex planning system has been a barrier to building the homes people need; it takes 7 years to agree local housing plans and 5 years just to get a spade in the ground.

“We will cut red tape, but not standards, placing a higher regard on quality, design and the environment than ever before.

“Planning decisions will be simple and transparent, with local democracy at the heart of the process.

“As we face the economic effects of the pandemic, now is the time for decisive action and a clear plan for jobs and growth.

“Our reforms will create thousands of jobs, lessen the dominance of big builders in the system, providing a major boost for small building companies across the country.”

The reforms will mean:

  • Local communities will be consulted from the very beginning of the planning process. By harnessing the latest technology through online maps and data, the whole system will be made more accessible
  • Valued green spaces will be protected for future generations by allowing for more building on brownfield land and all new streets to be tree lined
  • Much-needed homes will be built quicker by ensuring local housing plans are developed and agreed in 30 months – down from the current 7 years
  • Every area to have a local plan in place – currently only 50% of local areas has a plan to build more homes
  • The planning process to be overhauled and replaced with a clearer, rules based system. Currently around a third of planning cases that go to appeal are overturned at appeal
  • A new simpler national levy to replace the current system of developer contributions which often causes delay
  • The creation of a fast-track system for beautiful buildings and establishing local design guidance for developers to build and preserve beautiful communities
  • All new homes to be ‘zero carbon ready’, with no new homes delivered under the new system needed to be retrofitted as we achieve our commitment to net zero carbon emissions by 2050

A new and simpler system of developer contributions will also ensure private firms play their part in funding the new infrastructure and affordable homes that should accompany new building.

Section 106 agreements and the Community Infrastructure Levy will be replaced with a new Infrastructure Levy that will be a fixed proportion of the value of the development, above a set threshold, helping to deliver more affordable housing.

James Thomson, CEO of Gleeson Homes, said: “We strongly support the reform of our historic planning system, to bring it up to speed and ensure it is fit for purpose for the modern-day.

“In particular, we welcome initiatives to make it more transparent, speed up planning where appropriate and has a presumption towards development rather than against.

“Not only will these reforms go some way to supporting local SME housebuilders and their supply chains, but they will also help to ‘level-up’ the country through increased infrastructure investment, bringing jobs and homes to the north.”

Brian Berry, Chief Executive of the Federation of Master Builders, said: “Local, small builders are ready and waiting to play their part in delivering the homes, jobs, and growth we need if we are to ‘build, build, build’ our way to recovery.

“But the increasing complexities and costs of the planning system in England have held them back. Alongside struggles to access affordable land, 64% of developing small builders cite the planning system as the biggest barrier they face.”

To view the full consultation document click here.

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
4 hours ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
5 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
5 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
4 hours ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
5 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
5 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
4 hours ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
22 hours ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
7 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services